Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Bharat Rasayan Limited (Unit-III)
(b)Name of the Company / Organisation BHARAT RASAYAN LIMITED BRL
(c)Registered Address 1501, Vikram Tower, Rajendra Place, New Delhi,,New Delhi,Delhi-110008
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Kumar Gupta
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Unit-III DP 53-55, Saykha GIDC Industrial Estate, Tal.-Vagra, Saykha, Dist. Bharuch,,Vagra,Bharuch,Gujarat-392140
(d)Pin code 392140
(e)E-mail brlsaykha@bharatgroup.co.in
(f)STD Code. 11(f)Telephone No. 224805
(g)Fax No. 43661100
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/GJ/IND2/102692/2019
(d)Master Proposal Number(Single Window) SW/120073/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. DP 53-55
(b)Pincode 392140
(c)Bounded Latitudes (North)
From
Degree 21.79842
Minutes
Second
From
Degree 21.80011
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.82595
Minutes
Second
From
Degree 72.82953
Minutes
Second
(e)Survey of India Topo Sheet No. F43M09, F43M13, F43M14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagra
(2.)GujaratBharuchVagraSaykha GIDC
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/170/2019-IA-II(I)
(b)Date of Apply of TOR 18 Apr 2019
(c)Date of Issue of TOR / Standard ToR 01 Jan 1900
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project Site is located within Sayakha I GIDC Indu
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Multi purpose plantMPP-4 nos.(A,B,C,D)Please, refer Annexure-16 for more details
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Agrochemicals & their intermediates36300Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 310
(b) Funds Allocated for Environment Management (Capital) (in Crores) 22.7
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.65
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 41.551
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 70000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 70000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw Materials10706OthersMTMIndigenous & Import from other countryRoad,Rail,OthersSea, Air300 LinkageCopy of Linkage
(2.)Coal180OthersMT/DayImported coal from Adani coal supplyRoad,Rail30 Open MarketCopy of Linkage
(3.)Natural Gas70000OthersSM3/DayGujarat Gas Company Ltd.Pipe Conveyor30 LinkageCopy of Linkage
(4.)HSD Fuel80OthersKL/DayIOCL/local supplierRoad30 Open MarketCopy of Linkage
(5.)HSD for D.G set20OthersKL/DayIOCL/local supplierRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2019 To 31 Mar 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube471145NAAQS
(2.)PM10Micro Gram per Meter Cube934589NAAQS
(3.)SO2Micro Gram per Meter Cube25524NAAQS
(4.)NOxMicro Gram per Meter Cube291226NAAQS
    14.2.     No. of Ground Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l7851301010
(2.)pHNA8.67.66.58.5
(3.)TSSmg/l80101010
(4.)TDSmg/l37877931010
(5.)Heavy MetalsZincmg/l0.20.20.20.2
(6.)Chloridesmg/l185718311
(7.)Fluoridemg/l0.90.50.50.5
    14.3.     No. of Surface Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l164B
(2.)pHNA8.78.4B
(3.)DOmg/l5.45B
(4.)BODmg/l1010B
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))6541Noise Rule, 2000
(2.)Leq(Night)A-weighted decibels(dB(A))4535Noise Rule, 2000
    14.5.     No. of Soil Sample Monitored locations : 12
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.88.2
(2.)N(Nitrogen)Percent1.720.56
(3.)Electric ConductivityOthersµsm/cm410220.3
(4.)P(Phosphorus)Milligram per Kilogram8.41
(5.)K(Potassium)Milligram per Kilogram850250
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface29407Copy of Permission LetterPipelineWeirBRL-Sayakha/DIR/GIDC/2019/00120 Aug 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic90100to be treated in STPOthersGardening/Mixed with Industrial effluent090
(2.)Industrial17601700To be treated in ETP/MEE/ROOthersDischarge into deep sea via u/g GIDC pipeline1501610
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1850
(b)Total Discharged Water (Kilolitre per Day) 1700
(c)Total Reused Water (Kilolitre per Day) 150
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded Containers, Barrels, LinersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2280Tons15RoadAuthorized Recyclers
(2.)Date expired & off-specification on residuesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)75Tons50RoadOthersIncineration at ICHWMF Site
(3.)Ammonium Chloride solidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1463Tons50RoadOthersActual end users
(4.)Spent acid (Dilute H2SO4)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)2090Tons50RoadOthersActual end users
(5.)Sodium sulfite solidsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5947Tons50RoadOthersActual end users
(6.)Hydrobromic AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2552Tons50RoadOthersActual end users
(7.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)42Tons15RoadOthersregistered re-processors/reuse within premises
(8.)ETP & MEE SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15000Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Process Waste/Waste residue containing pesticidesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3810Tons50RoadOthersco-processing / Incineration at ICHWMF Site
(10.)Distillation residuesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)215Tons50RoadOthersco-processing / Incineration at ICHWMF Site
(11.)Used (Spent) CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons50RoadOthersActual end users
(12.)Ammonia SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1894Tons50RoadOthersActual end users
(13.)Aq. AlumHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12679Tons70RoadOthersActual end users
(14.)Sodium Bromide SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4205Tons50RoadOthersActual end users
(15.)Potassium bromide solidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)226Tons50RoadOthersActual end users
(16.)Cupric ChlorideHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons50RoadOthersActual end users
(17.)Ammonium Sulphate SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5877Tons50RoadOthersActual end users
(18.)Phosphoric AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)126Tons50RoadOthersActual end users
(19.)Acetic AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)28Tons50RoadOthersActual end users
(20.)Methanesulfinic AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons50RoadOthersActual end users
(21.)Sulphur (Solid)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)27Tons50RoadOthersActual end users
(22.)Potassium methane sulfinate saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)333Tons50RoadOthersActual end users
(23.)Potassium Chloride SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7130Tons50RoadOthersActual end users
(24.)Potassium Chloride SolidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)284Tons50RoadOthersActual end users
(25.)Potassium Bromide SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2297Tons50RoadOthersActual end users
(26.)Sodium benzoateHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1746Tons50RoadOthersActual end users
(27.)Hydrochloric AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)35803Tons50RoadOthersActual end users
(28.)Sodium Sulfite solnHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12897Tons50RoadOthersActual end users
(29.)Mix SolventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)423Tons50RoadOthersActual end users
(30.)Coal AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5200Tons50RoadOthersActual end users
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube250.50.83525.84NAAQS
(2.)PM10Microgram per Meter Cube810.50.23881.24NAAQS
(3.)PM2.5Microgram per Meter Cube270.50.10627.11NAAQS
(4.)SO2Microgram per Meter Cube160.52.03718.04NAAQS
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Process vent - 7NA (process stack)150.15OthersHCl, SO2 & Cl220, 40 & 5 (mg/Nm3)
(2.)Process vent - 9/ stack attached to dryerNA (process stack)150.15OthersPM150 mg/Nm3
(3.)Process vent - 11NA (process stack)150.15OthersPM150 mg/Nm3
(4.)General stack - 1NA (Process stack)150.15OthersVOC--
(5.)General stack - 2NA (Process stack)150.15OthersVOC--
(6.)General stack - 5NA (Process stack)150.15OthersVOC--
(7.)Process vent - 3NA (Process stack)150.15OthersHCl, SO2 & Cl220, 40 & 5 (mg/ Nm3)
(8.)General stack - 3NA (Process stack)150.15OthersNaCN--
(9.)General stack - 4NA (Process stack)150.15OthersVOC--
(10.)General stack - 7NA (Process stack)150.15OthersVOC--
(11.)D.G set-1HSD110.15OthersPM, SO2, NOx150 mg/Nm3, 100 ppm, 50 ppm
(12.)Process vent - 4NA (Process stack)150.15OthersNOx25 mg/Nm3
(13.)Process vent - 8NA (Process stack)150.15OthersNH330 mg/Nm3
(14.)Process Vent - 2NA (Process stack)150.15OthersHCl & HBr20 & 5 (mg/Nm3)
(15.)General stack - 6NA (process stack)150.15OthersHCl & Cl220 & 5 (mg/ Nm3)
(16.)Common stack for Boiler 1, TFH 1 & 2NG Or HSD & Coal301.1OthersPM, SO2, NOx150 mg/Nm3, 100 ppm, 50 ppm
(17.)Common stack for Boiler 2 & 3, TFH 3 & 4NG OR HSD & Coal301.4OthersPM, SO2, NOx150 mg/Nm3, 100 ppm, 50 ppm
(18.)D.G set-2HSD110.15OthersPM, SO2, NOx150 mg/Nm3, 100 ppm, 50 ppm
(19.)D.G set-3HSD150.15OthersPM, SO2, NOx150 mg/Nm3, 100 ppm, 50 ppm
(20.)D.G set-4HSD150.15OthersPM, SO2, NOx150 mg/Nm3,100 ppm,50 ppm
(21.)Process vent - 1NA (process stack)150.15OthersHCl, Cl2 & SO220, 5 & 40 (mg/Nm3)
(22.)Process vent - 5NA (Process stack)150.15OthersNH330 mg/Nm3
(23.)Process vent - 6 /stack attached to dryerNA (Process stack)150.15OthersPM150 mg/Nm3
(24.)General stack - 8 / stack attached to dryerNA (Process stack)150.15OthersPM150 mg/ Nm3
(25.)Process vent - 10NA (process stack)150.15OthersHCl, SO2 & Cl220, 40 & 5 (mg/Nm3)
(26.)Process vent - 12NA (process stack)150.15OthersHCl & HBr20 & 5 (mg/Nm3)
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6000
(b)Source Dakshin Gujarat Vij Company Ltd.
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 Nos. 750 KVA of each & 2 Nos. 1500 KVA of each
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 8.6019
    Total Land (ha.) 8.6019
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25636
(b)Waste/Barren Land (ha.) 1253
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 470
(e)Settlements (ha.) 632
(f)Industrial (ha.) 3424
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area4.1112
(2.)Green belt2.8386
(3.)OthersApproach Road(s)/drains & open area1.6521
Total (ha.) 8.6019
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0--
(2.)CorridorsNA0--
(3.)NPANA0--
(4.)WLSNA0--
(5.)ESZsNA0--
(6.)Wildlife CorridorsNA0--
(7.)ESAsNA0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0--
(2.)OthersNANA0--
(3.)Archaeological SitesNA0--
(4.)Defence InstallationsNA0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.6019
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl, Bengal Monitor lizard, Indian flap shell turtle
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 300
(b)Permanent Employment-During Operation 400
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 300
(e)No. of working days 350
(f)Total Manpower 1200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.8386
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 4300
(d)Funds Allocated for Plantation 1500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue generation by Exports., Employment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0104
(ii)Name of the EIA Consultant M/s. SIDDHI GREEN EXCELLENCE PVT. LTD.
(iii)Address Kamal Arcade – The Vertical Sunclock”, Comm. Plot No. C-3/3, Nr. SBI Industrial Branch, Station Road, G.I.D.C, Ankleshwar – 393 002, Gujarat State, India
(iv)Mobile No. 9824345895
(v)Landline No. 0264622480
(vi)Email Id siddhi.ank@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 27 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Kumar Gupta
DesignationDirector
Name of Company (Applicant Name should not be given here)BHARAT RASAYAN LIMITED BRL
Address1501, Vikram Tower, Rajendra Place, New Delhi
Print