Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of 8 lane (Greenfield highway) from Banda Hera village (Ch. 392.800) to Moondiya village (Ch. 452.425) Section of NH-148 N (Total length 59.625 Km), Under BHARATMALA PRIYOJANA Lot-4/Pkg-4
(b)Name of the Company / Organisation National Highways Authority of India
(c)Registered Address G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,South West,Delhi-110075
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr Biswajit Mukhopadhyay
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,,New Delhi,Delhi-110075
(d)Pin code 110075
(e)E-mail biswajit@nhai.org
(f)STD Code. 11(f)Telephone No. 25074200
(g)Fax No. 25093543
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/NCP/119826/2018
(d)Master Proposal Number(Single Window) SW/119822/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. List attached in additional details
(b)Pincode 325003
(c)Bounded Latitudes (North)
From
Degree 24.616
Minutes
Second
From
Degree 25.472
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.857
Minutes
Second
From
Degree 76.213
Minutes
Second
(e)Survey of India Topo Sheet No. G43Q4, G43V13 & G43V14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 451
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area .
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-76/2018-IA.III
(c)Date of Apply of TOR 22 Oct 2018
(d)Date of Issue of TOR / Standard ToR 18 Apr 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :6.5
Rajiv Gandhi Seva Kendra, Morukala Panchayat Simiti, Tehsil Kanwas, Kota
State :Rajasthan
District :Kota
Tehsil :Ramganj Mandi
Village :Morukala
80Mostly Land Compensation issueOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Highway Project Including Structures59.625Green field access Control Expressway
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Length59.625KilometersRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2323.42
(b) Funds Allocated for Environment Management (Capital) (in Crores) 15.766
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 11.62
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8.0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel .
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel NaN
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Borrow Earth10194252OthersCUMNearby Approved SourceRoad10 Open MarketCopy of Linkage
(2.)Steel1092777OthersMTNearby Approved SourceRoad171 Open MarketCopy of Linkage
(3.)Emulsion3642OthersMTApproved SourceRoad1500 Open MarketCopy of Linkage
(4.)Sand175135OthersCUMNearby Approved QuarryRoad54 Open MarketCopy of Linkage
(5.)Bitumen70654OthersMTApproved SourceRoad130 Open MarketCopy of Linkage
(6.)Aggregate919920OthersMTNearby Approved QuarryRoad15 Open MarketCopy of Linkage
(7.)Granular Sub- Base685603OthersCUMNearby Approved QuarryRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 30 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube114.756.6110.94100
(2.)SO2Micro Gram per Meter Cube20.26.319.8280
(3.)NOxMicro Gram per Meter Cube34.214.833.7380
(4.)OthersCOMicro Gram per Meter Cube0.820.590.814
(5.)PM2.5Micro Gram per Meter Cube68.326.066.2960
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l7324625002000
(2.)pHNA7.26.16.58.5
(3.)Total Hardnessmg/l396304200600
(4.)Chloridesmg/l69.939.92501000
(5.)Fluoridemg/l0.610.4311.5
(6.)Heavy MetalsZincmg/l0.2840.088515
(7.)TSSmg/l....
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.86.9E
(2.)DOmg/l6.45.6E
(3.)OthersTotal Hardnessmg/l292130E
(4.)CODmg/l1610.3E
(5.)BODmg/l6.33.4E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))47.837.055
(2.)Leq(Day)A-weighted decibels(dB(A))58.243.765
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.76.9
(2.)Electric ConductivityMillisiemens per Centimetre0.40.2
(3.)N(Nitrogen)Milligram per Kilogram348334
(4.)P(Phosphorus)Milligram per Kilogram44.632.6
(5.)K(Potassium)Milligram per Kilogram156.4127.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface46680.0Copy of Permission LettermodeOthersTankerOthersPumpingNA09 Oct 2019.
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAGreen Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Camp SiteOthersMunicipal Waste140Tons5RoadOthersComposting for Biodegradable & landfill for others
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube114.7..114.7100
(2.)NOxMicrogram per Meter Cube34.2..34.280
(3.)PM2.5Microgram per Meter Cube68.3..68.360
(4.)SO2Microgram per Meter Cube20.2..20.280
(5.)Others(Specify)COMicrogram per Meter Cube0.82500.441.2614
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not Applicable.00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) .
(b)Source RRVPNL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1500
(e)Stack Height (in m) .
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 148.46
(b)Private Land (ha.) 481.07
(c)Government Land (ha.) 88.484
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 718.014
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1774
(b)Waste/Barren Land (ha.) 310
(c)Grazing/ Community Land (ha.) .
(d)Surface Water Bodies (ha.) 37
(e)Settlements (ha.) 39
(f)Industrial (ha.) 89
(g)Forest (ha.) 498
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) .
(j)Others (ha.) : . .
    Total (ha.) NaN
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersNH-148 Development718.014ROW Including Rest Area
Total (ha.) 718.014
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsMukundra Tiger Reserve0.0Passing through
(2.)NPAMukundra Hills National Park0.0Passing through
(3.)Critically Polluted AreaNot Applicable.NA
(4.)WLSDarrah WLS0.0Passing through
(5.)ESZsMukundra Hills National Park0.0Passing through
(6.)ESAsNot Applicable.NA
(7.)CorridorsNot Applicable.NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesAmli Min Ka mahal10.0..
(2.)Defence InstallationsNot Applicable.NA
(3.)ForestBarkala Ji Reserve Forest0.0Passing through
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1905
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 718.01
(b)Land yet to be acquired(Ha) .
(c)Status of Land acquisition if not acquired under progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 38
(b)No. of Households 817
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 817
(e)Funds Allocated for R&R(in INR) (in Lacs) .
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Refer 4.7 Biological Environment of EIA report
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made .
(iii)Period of Implementation During Construction & Operation of the Project
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 600
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 1450
(d)Temporary Employment- During Operation 50
(e)No. of working days 700
(f)Total Manpower 2200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 178
(b)Percentage of Total Project Area 24.79
(c)No. of Plants to be Planted 89438
(d)Funds Allocated for Plantation 134156250.0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project area source their raw materials as well as transport their finished goods to various parts of the country. The proposed Project plans to link Delhi NCR to Jaipur, Kota, Vadodara and Mumbai. The strong regional connectivity proposed through the Project will further increase regional trade and economic growth.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) .
(b)Total No. of Flats to be Build .
(c)No. of Buildings .
(d)Total plot area (sqm) .
(e)Total built up area (sqm) .
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage .
(b)Capacity .
(c)No. of Recharge Pits 477
(d)Capacity .
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking .
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage .
(c)Quantity .
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Pond coming within ROW
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 59.652
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 20
(b)Total No. of ROB 1
(c)Total No. of Interchanges 3
(d)Total No. of Flyovers 0
(e)Total No. of Vehicle Underpass 34
(f)Total No. of Pedestrian Underpass .
(g)Details of other utilities rail and road corridors .
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0116
(ii)Name of the EIA Consultant Feedback Infra Pvt. Ltd.
(iii)Address 15th Floor, Tower, 9B, DLF Cyber City, DLF Phase 3, Sector 24, Gurugram, Haryana 122002
(iv)Mobile No. 9868563137
(v)Landline No. 0124431664
(vi)Email Id raj.singh@feedbackinfra.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 26 Aug 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. EIA/EMP following the generic structure strictly as per EIA Notification, 2006 as amended from time to time. EIA report should include the Social Impact Assessment and R&R Plan. 2.Submit the detailed compliance report of TOR condition no. 20. 3. Comparison table of issues raised during public hearing and commitment made by the project proponent with time bound action plan and sufficient fund provision 4. Submit the activities wise fund provision (calculated on slab basis) for CER as per Ministry’s OM dated 1st May, 2018. 5. Condition wise ToR compliance report with cross reference of EMP chapter Section and page no. 6. Tree cutting details letter is not attached in Form-2 application. 7. English version of approved public hearing (PH) minutes. 8. Details/copy of conservation is not attached in Form-2 (Sl. No. 28) 08 Nov 2019
2.NAThe correction have been made as per the instruction received 14 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr Biswajit Mukhopadhyay
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)National Highways Authority of India
AddressG-5 & 6, Sector-10, Dwarka, New DElhi-110075
Print