Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. MSP Sponge Iron Limited
(b)Name of the Company / Organisation MSP SPONGE IRON
(c)Registered Address Vill- Haldiaguna, PO-Gobardhan, Dist-Keonjhar,,Kendujhar,Orissa-758013
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pradip Kumar Dey
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Vill-Haldiaguna, PO-Gobardhan, Dist-Keonjhar,,Kendujhar Sadar,Kendujhar,Orissa-758013
(d)Pin code 758013
(e)E-mail mspkjrodisha.moef@mspsteel.com
(f)STD Code. 6766(f)Telephone No. 256513
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND/119663/2019
(d)Master Proposal Number(Single Window) SW/119662/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 360,285,260,280,261,293,624,633,366,314,324,295,24
(b)Pincode 758013
(c)Bounded Latitudes (North)
From
Degree 214573.21
Minutes
Second
From
Degree 214607.31
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 853444.85
Minutes
Second
From
Degree 853445.85
Minutes
Second
(e)Survey of India Topo Sheet No. F45N5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 426
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSataraKaradYeshwantnagar
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. MSP/01/2019-20
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 6 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT, Rods, Structures42000218000260000Tons per Annum(TPA)Road
(2.)Sponge Iron54000226000280000Tons per Annum(TPA)Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal Beneficiation2 X 75 TPHNILNIL2 X 75 TPH to be dropped
(2.)IF with CCM3X5 T + 4X15 T1X8 T + 2X15 T + 3X10 T + 2X5 T1X8 T + 2X15 T + 3X10 T + 2X5 T1x5T out of 3x5T to be modified to 1x8T and remaining 4x15T to be changed to 3X10T& 2x15T
(3.)DRI Kilns2X40 + 2X50 TPD4X75 TPD +1X500 TPD4X75 TPD +1X500 TPDConfiguration to be changed to 4x75 TPD & 1x500 TPD to be installed .
(4.)Sinter Plant1X36 m2NILNILTo be dropped
(5.)Rolling Mill1X42000 TPA1 X 2,18,000 TPA2,60,000 TPA
(6.)CPP-WHRB8 MW10 MW18 MW
(7.)CPP-CFBC12 MW6 MW6 MW6 MW to be dropped
(8.)Iron Ore Pellet2 X 6,00,000 TPA1 X 8,50,000 TPA8,50,000 TPACapacity to be reduced by 350000 TPA
(9.)Iron Ore Beneficiation10,00,000 TPANIL10,00,000 TPACommissioned
(10.)MBF1 X 250 M3, 30 TPH PCMNILNILTo be dropped
(11.)Coal Gasification1 X 864 m3/hr + 8 X 2850 m3/hrNIL1 X 864 m3/hr + 8 X 2850 m3/hr
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Mar 2019
(iv)Valid Upto 31 Mar 2020
(v)File No. 2662/IND-I-CON-2503
(vi)Application No. 2662/IND-I-CON-2503
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 573.41
(b) Funds Allocated for Environment Management (Capital) (in Crores) 24.28
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.55
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.85
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1587700
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1587700
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore1000000Tons per AnnumOMC GandhamardanRoad400 Fuel Supply AgreementCopy of Linkage
(2.)Imported Coal96000Tons per AnnumSA Coal Via Paradeep PortRail230 OthersinvoiceCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.4 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.52 To 4.1
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface54352.1Copy of Permission LetterPipelineIntake Well016054/WR/WR-MAJII-WRC/0024/1616 Jul 20191580
(2.)GroundWater20000Copy of Permission LetterPipelineOthersBore Well21-4(96)/SER/CGWA/2008-6414 Mar 20192000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic70100STPGreen Belt Renewal Plant70
(2.)Industrial13501500ETPReuse within the Plant & Recycling1350
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1420
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1420
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)TailingIndustrial Waste150000Tons0RoadOthersStored inside the plant
(2.)DRI Dust + AccreationIndustrial Waste82000Tons0Othersinside plantSanitary Landfills
(3.)CPP Fly AshFly Ash40480Tons1.2RoadAuthorized Recyclers
(4.)CharIndustrial Waste56000Tons0Conveyor BeltCo-Processing
(5.)Pellet DustIndustrial Waste27500Tons0RoadCo-Processing
(6.)SMS DustIndustrial Waste19800Tons0RoadCo-Processing
(7.)SMS SlagIndustrial Waste39600Tons3RoadOthersConstruction Work
(8.)Coal Gasifier AshIndustrial Waste20000Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube7.62.91613.6180
(2.)PM10Microgram per Meter Cube68.32.91674.31100
(3.)PM2.5Microgram per Meter Cube45.12.913.3648.4760
(4.)NOxMicrogram per Meter Cube13.10013.1180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Rotary Cooler of 500 TPDNIL301.2OthersPM2.50.132
(2.)2X10 T IFElectricity301.2PM100.16
(3.)PelletCoal381.8OthersPM2.50.66
(4.)1X500 TPD DRICoal502.2PM101.73
(5.)1X500 TPD DRICoal502.2SO25.8
(6.)Rotary Cooler of 500 TPD DRINIL301.2PM100.22
(7.)1X8 + 1X10 T IFElectricity301PM100.14
(8.)1X500 TPD DRICoal502.2OthersPM2.51.03
(9.)CPP 6 MWCoal401.2PM100.51
(10.)CPP 6 MWCoal401.2OthersPM2.50.30
(11.)CPP 6 MWCoal401.2SO26.5
(12.)Rotary Cooler of 4X75 TPD DRINIL300.7PM100.14
(13.)Rotary Cooler of 4X75 TPD DRINIL300.7OthersPM2.50.084
(14.)RMHP-DRINIL301.5PM100.33
(15.)RMHP-DRINIL301.5OthersPM2.50.198
(16.)1X8 + 1X10 T IFElectricity301OthersPM2.50.084
(17.)2X15 T IFElectricity300.8PM100.07
(18.)2x15 T IFElectricity300.8PM100.07
(19.)2x15 T IFElecytricity300.8OthersPM2.50.042
(20.)PelletCoal381.8PM101.1
(21.)PelletCoal381.8SO24.4
(22.)2X10 T IFElectricity301.2OthersPM2.50.096
(23.)2x15 T IFElectricity300.8OthersPM2.50.042
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 37.7
(b)Source NESCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 200 KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 30.25
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 30.25
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 19860.05
(b)Waste/Barren Land (ha.) 1882.4
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1287.66
(e)Settlements (ha.) 2581.87
(f)Industrial (ha.) 188.79
(g)Forest (ha.) 7264.04
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 33064.8100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant9.71
(2.)Green belt9.99
(3.)Area for Solid Waste Management3.38
(4.)Water Reservoir2.83
(5.)Built Up Area0.60
(6.)OthersRaw Material & Products3.74
Total (ha.) 30.25
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Not found
(2.)Wildlife CorridorsNA0Not found
(3.)WLSNA0Not found
(4.)NPANA0Not found
(5.)ESAsNA0Not found
(6.)CorridorsNA0Not found
(7.)ESZsNA0Not found
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersForestKendujhar - Saranda range8.9open forest
(2.)Archaeological SitesNA0Not Found
(3.)Defence InstallationsNA0Not Found
(4.)ForestGualdih3.96open forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 30.25
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ardei river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 2.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 294
(c)Temporary Employment- During Construction 670
(d)Temporary Employment- During Operation 336
(e)No. of working days 360
(f)Total Manpower 1800
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt10.09010.09
(2.)Percentage of Total Project Area33.3033.3
(3.)No. of Plants19074019074
(4.)Funds Allocated219351002193510
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen Belt Development,RWH
(2.)FinancialRevenue Generation
(3.)SocialEmployment Generation, Infrastructure Development, Upliftment in Livelihood
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 7
(ii)Name of the EIA Consultant Global Tech Enviro Experts Pvt. Ltd
(iii)Address C-23, BJB Nagar, Bhubaneswar
(iv)Mobile No. 9437033487
(v)Landline No. 0674243685
(vi)Email Id globalexperts@rediffmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 14 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NADuplicate proposal. Hence returned. 15 Oct 2019
2.NAThe correction have been made as per the instruction received 14 Jul 2020
3.NAIt is to inform that instant proposal will not fall under clause 7(ii) of EIA, 2006 as the validity of the existing EC dated 10/10/2012 has already been expired on 9/10/2019. In view of this, PP may apply for fresh ToR under EIA, 2006 for the proposed modernization/expansion activity. Further, it is also informed that cover letter of September, 2019 is being uploaded on July, 2020 without making any reference to EDS raised on 15/10/2019. In addition to this, same proposal is being uploaded with different proposal nos. 15 Jul 2020
4.NAThe correction have been made as per the instruction received 11 Aug 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPradip Kumar Dey
DesignationDirector
Name of Company (Applicant Name should not be given here)MSP SPONGE IRON
AddressVill- Haldiaguna, PO-Gobardhan, Dist-Keonjhar
Print