Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Refinery Capacity from 20 MMTPA to 46 MMTPA with Petrochemical Complex.
(b)Name of the Company / Organisation NAYARA ENERGY LIMITED
(c)Registered Address KHAMBHALIA, P.O.BOX NO.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Devbhumi Dwarka,Gujarat-361305
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ASMITA PATEL
(b)Designation (Owner/ Partner/ CEO) HEADENVIRONMENT
(c)Address KHAMBHALIA, P.O.BOX.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Khambhalia,Devbhumi Dwarka,Gujarat-361305
(d)Pin code 361305
(e)E-mail priya.ayengar@nayaraenergy.com
(f)STD Code. 2833(f)Telephone No. 662506
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
5(c) Petro-chemical complexes (industries based on processing of
Minor Activity5(c) Petro-chemical complexes (industries based on processing of
(b)Category A
(c)Proposal Number IA/GJ/IND2/119511/2018
(d)Master Proposal Number(Single Window) SW/119491/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no: 62- 66,7712,88,97,286-297,299-310,312-3
(b)Pincode 361305
(c)Bounded Latitudes (North)
From
Degree 22.310758
Minutes
Second
From
Degree 22.354772
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 69.728611
Minutes
Second
From
Degree 69.772777
Minutes
Second
(e)Survey of India Topo Sheet No. F42J11, F42J12, F42J15, F42J16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 50
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of EC NIL
(c)Date of Issue of EC NIL
(d)Previous EC Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per the ToR Granted by MoEF&CC dated 3rd August
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. File No: 5-26/2008(ENV)/63
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 30 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG9387851723OthersKTPARoad,Rail
(2.)Sulphur31816101928OthersKTPARoadJetty
(3.)Bitumen377337714OthersKTPARoadJetty
(4.)Fuel & Losses112066207740OthersKTPAPipe ConveyorJetty
(5.)HDPE0500500OthersKTPARoad,RailJetty
(6.)Butadiene0180180OthersKTPARoad,RailJetty
(7.)LLDPE0550550OthersKTPARoad,RailJetty
(8.)MEG + DEG0800800OthersKTPARoad,RailJetty
(9.)Phenol0200200OthersKTPARoad,RailJetty
(10.)Acetone0125125OthersKTPARoad,RailJetty
(11.)Bisphenol A03535OthersKTPARoad,RailJetty
(12.)Polycarbonate0130130OthersKTPARoad,RailJetty
(13.)N-Butanol05050OthersKTPARoad,RailJetty
(14.)2 Ethyl Hexanol0120120OthersKTPARoad,RailJetty
(15.)Acrylic Acid01010OthersKTPARoad,RailJetty
(16.)SAP0100100OthersKTPARoad,RailJetty
(17.)i-butanol01010OthersKTPARoad,RailJetty
(18.)Neo Pentyl Glycol04040OthersKTPARoad,RailJetty
(19.)Furnace Oil + VGO220-NaNOthersKTPARoad,Rail,OthersJetty
(20.)Propylene + Polypropylene010001000OthersKTPARoad,RailJetty
(21.)Kero + ATF8726241496OthersKTPARoad,Rail,OthersJetty
(22.)Naphtha + MS + Gasoline42001072614926OthersKTPARoad,Rail,OthersJetty
(23.)HSD97062277532481OthersKTPARoad,Rail,OthersJetty
(24.)Pet-coke224721914438OthersKTPARoad,RailJetty
(25.)MTBE + ETBE0150150OthersKTPARoad,RailJetty
(26.)Benzene0500500OthersKTPARoad,RailJetty
(27.)PX014001400OthersKTPARoad,RailJetty
(28.)PTA024002400OthersKTPARoad,RailJetty
(29.)LAB0200200OthersKTPARoad,RailJetty
(30.)PP010501050OthersKTPARoad,RailJetty
(31.)LDPE + EVA0200200OthersKTPARoad,RailJetty
(32.)SM0500500OthersKTPARoad,RailJetty
(33.)Acrylates (Butyl, Methyl, Ethyl)0300300OthersKTPARoad,RailJetty
(34.)Propylene Oxide + PG + Polyols0200200OthersKTPARoad,RailJetty
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Refinery202646MMTPA
(2.)Petrochemical Units010.7510.75MMTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Oct 2016
(iv)Valid Upto 16 Sep 2022
(v)File No. AWH-81987
(vi)Application No. 111130
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 130000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3923
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 162.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 30.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 26
(b)Existing quantity of raw material/fuel 20
(c)Total quantity of raw material/fuel 46
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CRUDE OIL46OthersMMTPAWorldwideOthersJetty21 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 26 Mar 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube14060110100
(2.)SO2Micro Gram per Meter Cube31102680
(3.)PM2.5Micro Gram per Meter Cube42153660
(4.)NOxMicro Gram per Meter Cube36173280
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l33722925002000
(2.)TSSmg/l592..
(3.)Fluoridemg/l1.10.31.01.5
(4.)pHNA7.776.58.5
(5.)Total Hardnessmg/l2060168200600
(6.)Chloridesmg/l1400272501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l102.2C
(2.)DOmg/l6.34.3A
(3.)pHNA7.27.0A
(4.)CODmg/l205C
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))534255
(2.)Leq(Night)A-weighted decibels(dB(A))373145
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre1.380.39
(2.)K(Potassium)Kilogram per hectare866426
(3.)pH8.17.7
(4.)N(Nitrogen)Kilogram per hectare677502
(5.)P(Phosphorus)Kilogram per hectare7.740.77
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.49 To 3.12
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.07 To 23.18
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Sea92800021Copy of Permission LetterPipelineOthersSea water intake well at Jetty16011/22/2000-IA-III03 Nov 2000.
(2.)Surface10000. Not Appliacble PipelineOthersNarmada Water ConnectionGWIL/Jamnagar/Ind.Conn/207817 Oct 201710000
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 342000
(c)Quantity of Brine (KLD) 536000
(d)Mode of Disposal of Brine Deep sea discharge
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process9300093000ETPReuse within the Plant & Recycling93000
(2.)Cooling tower blowdown365000NADischarge into Seawater Body36500
(3.)Desalination / RO Reject5365000NADischarge into Seawater Body536500
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 666000
(b)Total Discharged Water (Kilolitre per Day) 573000
(c)Total Reused Water (Kilolitre per Day) 93000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used Lubricating OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)750Tons300RoadAuthorized Recyclers
(2.)Discareded Empty DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons300RoadAuthorized Recyclers
(3.)Spent Catalyst from various unitsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12500Tons300RoadAuthorized Recyclers
(4.)E-WasteE Waste125Tons300RoadAuthorized Recyclers
(5.)waste/residue containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12500Tons500RoadAuthorized Recyclers
(6.)Spent ResinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)75Tons500RoadCo-Processing
(7.)Oily Cotton Rags / Oil Contaminated WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Tons500RoadCo-Processing
(8.)Waste Coke / Heater DepositHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Tons100RoadCo-Processing
(9.)Expired Hazardous ChemicalsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)50Tons300RoadOthersIncineration
(10.)insulated Copper Cable with PVC SheathingHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons500RoadAuthorized Recyclers
(11.)Lead Acid BatteriesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Tons300RoadAuthorized Recyclers
(12.)Oily Sludge & BSWHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12500Tons500RoadCo-Processing
(13.)Slop OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)200000Tons0Pipe ConveyorCo-Processing
(14.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons100RoadCo-Processing
(15.)Chemical Sludge from ETPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Tons200RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube3204577.180
(2.)PM2.5Microgram per Meter Cube424244.160
(3.)SO2Microgram per Meter Cube2603561.180
(4.)PM10Microgram per Meter Cube14042142.1100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)SRUPROCESS STACK803.2OthersNOx, CO15.87, 6.80
(2.)SRU-IIPROCESS STACK823.9OthersNOx, CO29.88, 12.81
(3.)DHDSFG702.4OthersPM, SO2, NOx, CO0.53, 2.64, 18.45, 7.91
(4.)FCC HEATERFG1103.7OthersPM, SO2, NOx, CO0.54, 2.68, 18.77, 8.04
(5.)CDU/VDUFO1305.7OthersPM, SO2, NOx, CO24.08, 409.3, 108.34, 48.15
(6.)HMU-1FG454.7OthersPM, SO2, NOx, CO1.98, 9.91, 69.37, 29.73
(7.)HMU-2FG454.7OthersPM, SO2, NOx, CO1.86, 9.28, 64.94, 27.83
(8.)Feed Preparation UnitFG1303OthersPM, SO2, NOx, CO0.42, 4.15, 20.77, 8.31
(9.)Gasoline Desulphurization (GDS-1)FG802.3OthersPM, SO2, NOx, CO0.19, 1.92, 9.59, 3.84
(10.)CCR-2FG1305.7OthersPM, SO2, NOx, CO1.31, 13.06, 65.29, 26.12
(11.)HMU-4FG454.7OthersPM, SO2, NOx, CO0.96, 9.59, 47.95, 19.18
(12.)HMU-5FG454.7OthersPM, SO2, NOx, CO0.96, 9.59, 47.95, 19.18
(13.)High Propylene FCC-2 HeaterFG1103.7OthersPM, SO2, NOx, CO0.27, 2.68, 13.41, 5.36
(14.)HydrocrackerFG903.5OthersPM, SO2, NOx, CO0.48, 4.76, 23.80, 9.52
(15.)SRU-4Process823.9OthersNOx, CO26.95, 10.78
(16.)ATF HTFG602.3OthersPM, SO2, NOx, CO0.12, 1.24, 6.19, 2.47
(17.)DCU-1FG652.5OthersPM, SO2, NOx, CO0.3, 1.51, 10.56, 4.53
(18.)DCU-3FG652.5OthersPM, SO2, NOx, CO0.42, 2.09, 14.60, 6.26
(19.)CDU/VDU-3FO1305.7OthersPM, SO2, NOx, CO13.85, 235.43, 96.94, 41.55
(20.)DHDT-2FO602.8OthersPM, SO2, NOx, CO2.13, 36.52, 14.93, 6.40
(21.)High Propylene FCC-2 RegeneratorProcess Stack1103.5OthersPM, SO2, NOx, CO10.58, 179.91, 74.08, 63.50
(22.)DCU-2 Furnace-2FG652.5OthersPM, SO2, NOx, CO0.20, 1.97, 9.87, 3.95
(23.)DCU-2 Furnace-3FG652.5OthersPM, SO2, NOx, CO0.21, 2.10, 10.51, 4.20
(24.)SRU-3Process823.9OthersNOx, CO26.95, 10.78
(25.)SRU-5Process823.9OthersNOx, CO26.95, 10.78
(26.)SRU-6Process823.9OthersNOx, CO26.95, 10.78
(27.)DCU-2FG652.5OthersPM, SO2, NOx, CO0.29, 1.43, 10.03, 4.3
(28.)SRU-IPROCESS STACK823.9OthersNOx, CO29.96, 12.84
(29.)Aromatic Extraction UnitFG1304.5OthersPM, SO2, NOx, CO0.30, 3.02, 15.10, 6.04
(30.)Ebulated Bed RHCKFO903.5OthersPM, SO2, NOx, CO5.48, 93.18, 38.37, 16.44
(31.)FCC Regeneratorprocess stack1103.5OthersPM, SO2, NOx, CO21.17, 359.81, 95.24, 84.66
(32.)NHTCCRFG1305.7OthersPM, SO2, NOx, CO2.61, 13.06, 91.41, 39.18
(33.)Mini HMUFG15.781.05OthersPM, SO2, NOx, CO0.09, 0.47, 3.30, 1.42
(34.)DHDTFO602.8OthersPM, SO2, NOx, CO4.26, 72.50, 19.19, 8.53
(35.)VGOMHCFO603.1OthersPM, SO2, NOx, CO6.76, 114.91, 30.42, 13.52
(36.)High Propylene FCC-1 HeaterFG1103.7OthersPM, SO2, NOx, CO0.34, 3.40, 16.98, 6.79
(37.)High Propylene FCC-1 RegeneratorProcess Stack1103.5OthersPM, SO2, NOx, CO12.30, 209.17, 86.13, 73.82
(38.)NHT-2FG1305.7OthersPM, SO2, NOx, CO0.30, 3.02, 15.11, 6.04
(39.)HMU-3FG454.7OthersPM, SO2, NOx, CO0.96, 9.59, 47.95, 19.18
(40.)DCU-2 Furnace-1FG652.5OthersPM, SO2, NOx, CO0.20, 2.02, 10.08, 4.03
(41.)Solvent Deasphalting UnitFO802.5OthersPM, SO2, NOx, CO1.47, 25.02, 10.30, 2.94
(42.)Para Xylene, Furnace 1-6 (Stacks)FG301.1OthersPM, SO2, NOx, CO0.009, 0.086, 0.430, 0.172
(43.)Cracker & Associated Units 1-9 (9 stacks)FG351.8OthersPM, SO2, NOx, CO0.155, 1.550, 7.751, 3.100
(44.)Propane Dehydrogenation UnitFG301OthersPM, SO2, NOx, CO0.002, 0.022, 0.108, 0.043
(45.)CDU-2FO1003.5OthersPM, SO2, NOx, CO4.89, 83.05, 21.98, 9.77
(46.)Gasoline Desulphurisation (GDS-2)FG802.3OthersPM, SO2, NOx, CO0.12, 1.18, 5.90, 2.36
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 927000
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2275
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2275
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 1104
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 761
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Green belt area in existing refinery area 410
    Total (ha.) 2275
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1525With associated facilites
(2.)Green belt750
Total (ha.) 2275
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA.NA
(2.)CorridorsNA.NA
(3.)Wildlife CorridorsNA.NA
(4.)WLSNA.NA
(5.)Critically Polluted AreaNA.NA
(6.)NPANA.NA
(7.)ESAsNA.NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA.NA
(2.)ForestReserve Forest7.5Near Sinhan dam, Danta village
(3.)Archaeological SitesNA.NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2275
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 0.1 Crore
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sinhan Dam
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 700
(d)Temporary Employment- During Operation 300
(e)No. of working days 365
(f)Total Manpower 2000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt410340750
(2.)Percentage of Total Project Area181533
(3.)No. of Plants300000250000550000
(4.)Funds Allocated10000000460000000470000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalBesides the green belt development within the existing refinery premises in 33% of the total land area for the project, mass plantation movement shall be initiated within 10 km area of the project under Community Environment initiative.
(2.)SocialThe proposed developmental activities in this region will result in improvement of infrastructure as well as upliftment of social structure in the area. it is proposed to invest 2% of its average net profits on different CSR activities, as per the suggestions/demands of the people of the region. Comprehensive social/ community development activities shall be worked out, in addition to the various CSR activities already being done in the region by Nayara Energy.
(3.)FinancialThe major benefit envisaged from the project is that it will boost industrial development of the region due to assured availability of petroleum products to Country/State and industries concerned. As a result, there would be more opportunities for employment generation to the locals especially the youths. More than 12000 workers are estimated to be employed during construction phase of about 4 years and about 2000 persons will get employment in the project during the operation phase. The project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Direction under section-5 of the Environment Protection Act 1986
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Direction has been complied with. Show Cause Notic
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0088
(ii)Name of the EIA Consultant CSIR-NEERI
(iii)Address CSIR-NEERI, Nehru Marg, Nagpur-440020
(iv)Mobile No. 9423400740
(v)Landline No. 0114560910
(vi)Email Id sk_goyal@neeri.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 17 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit the report of public consultation along with the comments received and the complete certified compliance report of existing EC. 03 Nov 2019
2.NAThe correction have been made as per the instruction received 18 Nov 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRequest letter has been submitted to EAC for considering our case in upcoming EAC meeting. 07 Feb 2020
2. ADS Reply LetterRequest letter has been submitted to EAC for considering our case in upcoming EAC meeting. 07 Feb 2020
3.NA

The project proponent vide email dated 23rd December, 2019 has requested to postpone their proposal as due to unavailability of technical person they will not attend the meeting. The Committee defer the proposal. 

15 Jan 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantASMITA PATEL
DesignationHEADENVIRONMENT
Name of Company (Applicant Name should not be given here)NAYARA ENERGY LIMITED
AddressKHAMBHALIA, P.O.BOX NO.24
Print