Form-2 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Refinery Capacity from 20 MMTPA to 46 MMTPA with Petrochemical Complex. | (b)Name of the Company / Organisation | NAYARA ENERGY LIMITED | (c)Registered Address | KHAMBHALIA, P.O.BOX NO.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Devbhumi Dwarka,Gujarat-361305 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
| 2. | Address for the correspondence: | (a)Name of the Applicant | ASMITA PATEL | (b)Designation (Owner/ Partner/ CEO) | HEADENVIRONMENT | (c)Address | KHAMBHALIA, P.O.BOX.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Khambhalia,Devbhumi Dwarka,Gujarat-361305 | (d)Pin code | 361305 | (e)E-mail | priya.ayengar@nayaraenergy.com | (f)STD Code. | 2833(f)Telephone No. | 662506 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry 5(c) Petro-chemical complexes (industries based on processing of
| Minor Activity | 5(c) Petro-chemical complexes (industries based on processing of
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/119511/2018 | (d)Master Proposal Number(Single Window) | SW/119491/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
| 4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey no: 62- 66,7712,88,97,286-297,299-310,312-3 | (b)Pincode | 361305 | (c)Bounded Latitudes (North) | | From | | Degree | 22.310758 | Minutes | | Second | | From | | Degree | 22.354772 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 69.728611 | Minutes | | Second | | From | | Degree | 69.772777 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42J11, F42J12, F42J15, F42J16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 50 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 4 | |
| 5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
| | Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | | | 6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | NIL | (b)Date of Apply of EC | NIL | (c)Date of Issue of EC | NIL | (d)Previous EC Letter | NIL | |
| 7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per the ToR Granted by MoEF&CC dated 3rd August | (c)Supporting Document | Copy of Supporting Document | |
| 8. | Details of Project Configuration/Product: | Details Not Applicable | |
| 9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | File No: 5-26/2008(ENV)/63 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 30 2018 12:00AM | (b)Details of Capacity Expansion | |
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | LPG | 938 | 785 | 1723 | Others | KTPA | Road,Rail | | (2.) | Sulphur | 318 | 1610 | 1928 | Others | KTPA | Road | Jetty | (3.) | Bitumen | 377 | 337 | 714 | Others | KTPA | Road | Jetty | (4.) | Fuel & Losses | 1120 | 6620 | 7740 | Others | KTPA | Pipe Conveyor | Jetty | (5.) | HDPE | 0 | 500 | 500 | Others | KTPA | Road,Rail | Jetty | (6.) | Butadiene | 0 | 180 | 180 | Others | KTPA | Road,Rail | Jetty | (7.) | LLDPE | 0 | 550 | 550 | Others | KTPA | Road,Rail | Jetty | (8.) | MEG + DEG | 0 | 800 | 800 | Others | KTPA | Road,Rail | Jetty | (9.) | Phenol | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | (10.) | Acetone | 0 | 125 | 125 | Others | KTPA | Road,Rail | Jetty | (11.) | Bisphenol A | 0 | 35 | 35 | Others | KTPA | Road,Rail | Jetty | (12.) | Polycarbonate | 0 | 130 | 130 | Others | KTPA | Road,Rail | Jetty | (13.) | N-Butanol | 0 | 50 | 50 | Others | KTPA | Road,Rail | Jetty | (14.) | 2 Ethyl Hexanol | 0 | 120 | 120 | Others | KTPA | Road,Rail | Jetty | (15.) | Acrylic Acid | 0 | 10 | 10 | Others | KTPA | Road,Rail | Jetty | (16.) | SAP | 0 | 100 | 100 | Others | KTPA | Road,Rail | Jetty | (17.) | i-butanol | 0 | 10 | 10 | Others | KTPA | Road,Rail | Jetty | (18.) | Neo Pentyl Glycol | 0 | 40 | 40 | Others | KTPA | Road,Rail | Jetty | (19.) | Furnace Oil + VGO | 220 | - | NaN | Others | KTPA | Road,Rail,Others | Jetty | (20.) | Propylene + Polypropylene | 0 | 1000 | 1000 | Others | KTPA | Road,Rail | Jetty | (21.) | Kero + ATF | 872 | 624 | 1496 | Others | KTPA | Road,Rail,Others | Jetty | (22.) | Naphtha + MS + Gasoline | 4200 | 10726 | 14926 | Others | KTPA | Road,Rail,Others | Jetty | (23.) | HSD | 9706 | 22775 | 32481 | Others | KTPA | Road,Rail,Others | Jetty | (24.) | Pet-coke | 2247 | 2191 | 4438 | Others | KTPA | Road,Rail | Jetty | (25.) | MTBE + ETBE | 0 | 150 | 150 | Others | KTPA | Road,Rail | Jetty | (26.) | Benzene | 0 | 500 | 500 | Others | KTPA | Road,Rail | Jetty | (27.) | PX | 0 | 1400 | 1400 | Others | KTPA | Road,Rail | Jetty | (28.) | PTA | 0 | 2400 | 2400 | Others | KTPA | Road,Rail | Jetty | (29.) | LAB | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | (30.) | PP | 0 | 1050 | 1050 | Others | KTPA | Road,Rail | Jetty | (31.) | LDPE + EVA | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | (32.) | SM | 0 | 500 | 500 | Others | KTPA | Road,Rail | Jetty | (33.) | Acrylates (Butyl, Methyl, Ethyl) | 0 | 300 | 300 | Others | KTPA | Road,Rail | Jetty | (34.) | Propylene Oxide + PG + Polyols | 0 | 200 | 200 | Others | KTPA | Road,Rail | Jetty | | | (c)Details of Configuration | |
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Refinery | 20 | 26 | 46 | MMTPA | (2.) | Petrochemical Units | 0 | 10.75 | 10.75 | MMTPA | | 9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Oct 2016 | (iv)Valid Upto | 16 Sep 2022 | (v)File No. | AWH-81987 | (vi)Application No. | 111130 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
| | 10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 130000 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3923 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 162.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 30.4 | |
| 11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | | 12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | | 13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 26 | (b)Existing quantity of raw material/fuel | 20 | (c)Total quantity of raw material/fuel | 46 | |
|   13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | CRUDE OIL | 46 | Others | MMTPA | Worldwide | Others | Jetty | 21 | Open Market | | Copy of Linkage | | | 14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 26 Mar 2018 To 30 Jun 2018 | (b)Season | Summer | |
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 140 | 60 | 110 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 31 | 10 | 26 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 42 | 15 | 36 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 36 | 17 | 32 | 80 | | 14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 3372 | 292 | 500 | 2000 | (2.) | TSS | | | mg/l | | 59 | 2 | . | . | (3.) | Fluoride | | | mg/l | | 1.1 | 0.3 | 1.0 | 1.5 | (4.) | pH | | | NA | | 7.7 | 7 | 6.5 | 8.5 | (5.) | Total Hardness | | | mg/l | | 2060 | 168 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 1400 | 27 | 250 | 1000 | | 14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 10 | 2.2 | C | (2.) | DO | | mg/l | | 6.3 | 4.3 | A | (3.) | pH | | NA | | 7.2 | 7.0 | A | (4.) | COD | | mg/l | | 20 | 5 | C | | 14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53 | 42 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 37 | 31 | 45 | | 14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 1.38 | 0.39 | (2.) | K(Potassium) | Kilogram per hectare | | 866 | 426 | (3.) | pH | | | 8.1 | 7.7 | (4.) | N(Nitrogen) | Kilogram per hectare | | 677 | 502 | (5.) | P(Phosphorus) | Kilogram per hectare | | 7.74 | 0.77 | | | 14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.49 To 3.12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.07 To 23.18 | (c)Whether Ground Water Intersection will be there ? | No | |
| 15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 928000 | 21 | Copy of Permission Letter | Pipeline | | Others | Sea water intake well at Jetty | 16011/22/2000-IA-III | 03 Nov 2000 | . | (2.) | Surface | | 10000 | . | Not Appliacble | Pipeline | | Others | Narmada Water Connection | GWIL/Jamnagar/Ind.Conn/2078 | 17 Oct 2017 | 10000 | | | 15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 342000 | (c)Quantity of Brine (KLD) | 536000 | (d)Mode of Disposal of Brine | Deep sea discharge | |
| 16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process | 93000 | 93000 | ETP | Reuse within the Plant & Recycling | | 93000 | | (2.) | Cooling tower blowdown | 36500 | 0 | NA | Discharge into Seawater Body | | | 36500 | (3.) | Desalination / RO Reject | 536500 | 0 | NA | Discharge into Seawater Body | | | 536500 | | | 16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 666000 | (b)Total Discharged Water (Kilolitre per Day) | 573000 | (c)Total Reused Water (Kilolitre per Day) | 93000 | |
| 17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Lubricating Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 750 | Tons | 300 | Road | | Authorized Recyclers | | (2.) | Discareded Empty Drums | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 300 | Road | | Authorized Recyclers | | (3.) | Spent Catalyst from various units | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12500 | Tons | 300 | Road | | Authorized Recyclers | | (4.) | E-Waste | E Waste | | 125 | Tons | 300 | Road | | Authorized Recyclers | | (5.) | waste/residue containing oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12500 | Tons | 500 | Road | | Authorized Recyclers | | (6.) | Spent Resin | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 75 | Tons | 500 | Road | | Co-Processing | | (7.) | Oily Cotton Rags / Oil Contaminated Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 500 | Road | | Co-Processing | | (8.) | Waste Coke / Heater Deposit | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 100 | Road | | Co-Processing | | (9.) | Expired Hazardous Chemicals | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 300 | Road | | Others | Incineration | (10.) | insulated Copper Cable with PVC Sheathing | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 500 | Road | | Authorized Recyclers | | (11.) | Lead Acid Batteries | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 300 | Road | | Authorized Recyclers | | (12.) | Oily Sludge & BSW | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12500 | Tons | 500 | Road | | Co-Processing | | (13.) | Slop Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 200000 | Tons | 0 | Pipe Conveyor | | Co-Processing | | (14.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 100 | Road | | Co-Processing | | (15.) | Chemical Sludge from ETP | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Tons | 200 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | | | 18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 32 | 0 | 45 | 77.1 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 42 | 4 | 2 | 44.1 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 26 | 0 | 35 | 61.1 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 140 | 4 | 2 | 142.1 | 100 | | | 18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | SRU | PROCESS STACK | 80 | 3.2 | Others | NOx, CO | 15.87, 6.80 | (2.) | SRU-II | PROCESS STACK | 82 | 3.9 | Others | NOx, CO | 29.88, 12.81 | (3.) | DHDS | FG | 70 | 2.4 | Others | PM, SO2, NOx, CO | 0.53, 2.64, 18.45, 7.91 | (4.) | FCC HEATER | FG | 110 | 3.7 | Others | PM, SO2, NOx, CO | 0.54, 2.68, 18.77, 8.04 | (5.) | CDU/VDU | FO | 130 | 5.7 | Others | PM, SO2, NOx, CO | 24.08, 409.3, 108.34, 48.15 | (6.) | HMU-1 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 1.98, 9.91, 69.37, 29.73 | (7.) | HMU-2 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 1.86, 9.28, 64.94, 27.83 | (8.) | Feed Preparation Unit | FG | 130 | 3 | Others | PM, SO2, NOx, CO | 0.42, 4.15, 20.77, 8.31 | (9.) | Gasoline Desulphurization (GDS-1) | FG | 80 | 2.3 | Others | PM, SO2, NOx, CO | 0.19, 1.92, 9.59, 3.84 | (10.) | CCR-2 | FG | 130 | 5.7 | Others | PM, SO2, NOx, CO | 1.31, 13.06, 65.29, 26.12 | (11.) | HMU-4 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 0.96, 9.59, 47.95, 19.18 | (12.) | HMU-5 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 0.96, 9.59, 47.95, 19.18 | (13.) | High Propylene FCC-2 Heater | FG | 110 | 3.7 | Others | PM, SO2, NOx, CO | 0.27, 2.68, 13.41, 5.36 | (14.) | Hydrocracker | FG | 90 | 3.5 | Others | PM, SO2, NOx, CO | 0.48, 4.76, 23.80, 9.52 | (15.) | SRU-4 | Process | 82 | 3.9 | Others | NOx, CO | 26.95, 10.78 | (16.) | ATF HT | FG | 60 | 2.3 | Others | PM, SO2, NOx, CO | 0.12, 1.24, 6.19, 2.47 | (17.) | DCU-1 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.3, 1.51, 10.56, 4.53 | (18.) | DCU-3 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.42, 2.09, 14.60, 6.26 | (19.) | CDU/VDU-3 | FO | 130 | 5.7 | Others | PM, SO2, NOx, CO | 13.85, 235.43, 96.94, 41.55 | (20.) | DHDT-2 | FO | 60 | 2.8 | Others | PM, SO2, NOx, CO | 2.13, 36.52, 14.93, 6.40 | (21.) | High Propylene FCC-2 Regenerator | Process Stack | 110 | 3.5 | Others | PM, SO2, NOx, CO | 10.58, 179.91, 74.08, 63.50 | (22.) | DCU-2 Furnace-2 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.20, 1.97, 9.87, 3.95 | (23.) | DCU-2 Furnace-3 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.21, 2.10, 10.51, 4.20 | (24.) | SRU-3 | Process | 82 | 3.9 | Others | NOx, CO | 26.95, 10.78 | (25.) | SRU-5 | Process | 82 | 3.9 | Others | NOx, CO | 26.95, 10.78 | (26.) | SRU-6 | Process | 82 | 3.9 | Others | NOx, CO | 26.95, 10.78 | (27.) | DCU-2 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.29, 1.43, 10.03, 4.3 | (28.) | SRU-I | PROCESS STACK | 82 | 3.9 | Others | NOx, CO | 29.96, 12.84 | (29.) | Aromatic Extraction Unit | FG | 130 | 4.5 | Others | PM, SO2, NOx, CO | 0.30, 3.02, 15.10, 6.04 | (30.) | Ebulated Bed RHCK | FO | 90 | 3.5 | Others | PM, SO2, NOx, CO | 5.48, 93.18, 38.37, 16.44 | (31.) | FCC Regenerator | process stack | 110 | 3.5 | Others | PM, SO2, NOx, CO | 21.17, 359.81, 95.24, 84.66 | (32.) | NHTCCR | FG | 130 | 5.7 | Others | PM, SO2, NOx, CO | 2.61, 13.06, 91.41, 39.18 | (33.) | Mini HMU | FG | 15.78 | 1.05 | Others | PM, SO2, NOx, CO | 0.09, 0.47, 3.30, 1.42 | (34.) | DHDT | FO | 60 | 2.8 | Others | PM, SO2, NOx, CO | 4.26, 72.50, 19.19, 8.53 | (35.) | VGOMHC | FO | 60 | 3.1 | Others | PM, SO2, NOx, CO | 6.76, 114.91, 30.42, 13.52 | (36.) | High Propylene FCC-1 Heater | FG | 110 | 3.7 | Others | PM, SO2, NOx, CO | 0.34, 3.40, 16.98, 6.79 | (37.) | High Propylene FCC-1 Regenerator | Process Stack | 110 | 3.5 | Others | PM, SO2, NOx, CO | 12.30, 209.17, 86.13, 73.82 | (38.) | NHT-2 | FG | 130 | 5.7 | Others | PM, SO2, NOx, CO | 0.30, 3.02, 15.11, 6.04 | (39.) | HMU-3 | FG | 45 | 4.7 | Others | PM, SO2, NOx, CO | 0.96, 9.59, 47.95, 19.18 | (40.) | DCU-2 Furnace-1 | FG | 65 | 2.5 | Others | PM, SO2, NOx, CO | 0.20, 2.02, 10.08, 4.03 | (41.) | Solvent Deasphalting Unit | FO | 80 | 2.5 | Others | PM, SO2, NOx, CO | 1.47, 25.02, 10.30, 2.94 | (42.) | Para Xylene, Furnace 1-6 (Stacks) | FG | 30 | 1.1 | Others | PM, SO2, NOx, CO | 0.009, 0.086, 0.430, 0.172 | (43.) | Cracker & Associated Units 1-9 (9 stacks) | FG | 35 | 1.8 | Others | PM, SO2, NOx, CO | 0.155, 1.550, 7.751, 3.100 | (44.) | Propane Dehydrogenation Unit | FG | 30 | 1 | Others | PM, SO2, NOx, CO | 0.002, 0.022, 0.108, 0.043 | (45.) | CDU-2 | FO | 100 | 3.5 | Others | PM, SO2, NOx, CO | 4.89, 83.05, 21.98, 9.77 | (46.) | Gasoline Desulphurisation (GDS-2) | FG | 80 | 2.3 | Others | PM, SO2, NOx, CO | 0.12, 1.18, 5.90, 2.36 | | | 19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 927000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
| 20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2275 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2275 | |
| 21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 1104 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 761 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Green belt area in existing refinery area | 410 | Total (ha.) | 2275 | |
| 22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1525 | With associated facilites | (2.) | Green belt | | 750 | | | | | 23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
| 23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NA | . | NA | (2.) | Corridors | NA | . | NA | (3.) | Wildlife Corridors | NA | . | NA | (4.) | WLS | NA | . | NA | (5.) | Critically Polluted Area | NA | . | NA | (6.) | NPA | NA | . | NA | (7.) | ESAs | NA | . | NA | | 23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | . | NA | (2.) | Forest | | Reserve Forest | 7.5 | Near Sinhan dam, Danta village | (3.) | Archaeological Sites | | NA | . | NA | | | 23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
| 24. | Forest Land: | Whether any Forest Land involved? | No | |
| 25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
| 26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2275 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
| 27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
| 28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 0.1 Crore | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
| 29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
| 30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sinhan Dam | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 7 | |
| 31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 500 | (b)Permanent Employment-During Operation | 500 | (c)Temporary Employment- During Construction | 700 | (d)Temporary Employment- During Operation | 300 | (e)No. of working days | 365 | (f)Total Manpower | 2000 | |
| | S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 410 | 340 | 750 | (2.) | Percentage of Total Project Area | 18 | 15 | 33 | (3.) | No. of Plants | 300000 | 250000 | 550000 | (4.) | Funds Allocated | 10000000 | 460000000 | 470000000 | | | 33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Besides the green belt development within the existing refinery premises in 33% of the total land area for the project, mass plantation movement shall be initiated within 10 km area of the project under Community Environment initiative. | (2.) | Social | The proposed developmental activities in this region will result in improvement of infrastructure as well as upliftment of social structure in the area. it is proposed to invest 2% of its average net profits on different CSR activities, as per the suggestions/demands of the people of the region. Comprehensive social/ community development activities shall be worked out, in addition to the various CSR activities already being done in the region by Nayara Energy. | (3.) | Financial | The major benefit envisaged from the project is that it will boost industrial development of the region due to assured availability of petroleum products to Country/State and industries concerned. As a result, there would be more opportunities for employment generation to the locals especially the youths. More than 12000 workers are estimated to be employed during construction phase of about 4 years and about 2000 persons will get employment in the project during the operation phase. The project | | | 34. CRZ Specific Details : Not Applicable | 35. Sector Specific Details : NOT APPLICABLE | 35. Sector Specific Details For Industrial Projects - 2 | | | 36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
| 37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Direction under section-5 of the Environment Protection Act 1986 | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Direction has been complied with. Show Cause Notic | |
| 38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0088 | (ii)Name of the EIA Consultant | CSIR-NEERI | (iii)Address | CSIR-NEERI, Nehru Marg, Nagpur-440020 | (iv)Mobile No. | 9423400740 | (v)Landline No. | 0114560910 | (vi)Email Id | sk_goyal@neeri.res.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 17 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
| | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please submit the report of public consultation along with the comments received and the complete certified compliance report of existing EC. | 03 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 18 Nov 2019 | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Request letter has been submitted to EAC for considering our case in upcoming EAC meeting. | 07 Feb 2020 | 2. | ADS Reply Letter | Request letter has been submitted to EAC for considering our case in upcoming EAC meeting. | 07 Feb 2020 | 3. | NA | The project proponent vide email dated 23rd December, 2019 has
requested to postpone their proposal as due to unavailability of technical
person they will not attend the meeting. The Committee defer the
proposal.
| 15 Jan 2020 | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | ASMITA PATEL | Designation | HEADENVIRONMENT | Name of Company (Applicant Name should not be given here) | NAYARA ENERGY LIMITED | Address | KHAMBHALIA, P.O.BOX NO.24 |
|
|
|