Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Steel Plant; Sponge Iron (from 297000 MTPA to 594000 MTPA), MS Billet (from 330000 MTPA to 653400 MTPA), Captive power (from 53 MW to 80.5 MW) and New Pellet plant establishme
(b)Name of the Company / Organisation GALLANTT ISPAT LIMITED
(c)Registered Address Plot No. AL – 5, Sector No. 23, GIDA Industrial estate, Vill- Sahbajganj & Domharmaphi Tehsil – Sahajanwa District- Gorakhpur (U.P),,Gorakhpur,Uttar Pradesh-273209
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Navneet Jindal
(b)Designation (Owner/ Partner/ CEO) Manager Commercial
(c)Address 8th Floor Gallantt landmark Bank Road Gorkahpur,,Sahjanwa,Gorakhpur,Uttar Pradesh-273209
(d)Pin code 273209
(e)E-mail gallanttispatlimited1@gmail.com
(f)STD Code. 0(f)Telephone No. 0000000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND/119401/2016
(d)Master Proposal Number(Single Window) SW/119398/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. AL- 5, Sector 23 GIDA Industrial Area
(b)Pincode 273209
(c)Bounded Latitudes (North)
From
Degree 26.75447778
Minutes
Second
From
Degree 26.76235556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.1938889
Minutes
Second
From
Degree 83.2022222
Minutes
Second
(e)Survey of India Topo Sheet No. 63 N/1, 63N/2, 63N/5 & 63N/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 80
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshGorakhpurKaradYeshwantnagar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/229/2008-IA.II(I)
(c)Date of Issue of TOR 11 Aug 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 26 Sep 2019
(c)Date of Issue of EC 14 Oct 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0
Plant Site
State :Uttar Pradesh
District :Gorakhpur
Tehsil :Sahjanwa
Village :AL-5, Sector 23, GIDA Industrial Area
55Employment and Environmental PollutionOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. letter no. IV/Env/UP/Ind-154/459/2017/104
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 4 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sponge Iron297000297000594000Tons per Annum(TPA)OthersSelf use
(2.)M.S.Billets330000323400653400Tons per Annum(TPA)Road
(3.)Pellet0792000792000Tons per Annum(TPA)OthersSelf use
(4.)Power5327.580.5Mega Watt(MW)OthersCables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)CFBC Boiler1 x 110 TPH1 x 110 TPH2 x 110 TPH
(2.)AFBC Boiler1 x 50 TPHnil1 x 50 TPHStand By
(3.)Captive Power Plant35 MW of FBC and 18 MW of WHRB27.5 MW80.5 MW (44.5MW of CFBC and 36 MW of WHRB)
(4.)WHRB2 x 35 TPH1 x 70 TPH & 1 x 12 TPH2 x 35 TPH, 1 x 70 TPH & 1 x 12 TPH
(5.)Sponge Iron Plant (DRI Kiln)2 x 450 TPD1 x 750 TPD & 1 x 150 TPD2 x 450 TPD, 1 x 750 TPD & 1 x 150 TPD
(6.)Steel Melting Shop - Induction Furnace2 x 20 T & 2 X 30 T2 x 22.5 T & 2 x 27.5 T4 x 30 T, 2 x 22.5 T & 2 x 27.5 TExisting 2 x 20 T Induction Furnace will be modified to 2 x 30 T after expansion
(7.)Pelletization PlantNil792000 TPA792000 TPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Nov 2017
(iv)Valid Upto 31 Dec 2019
(v)File No. H/2172/C-6/Air pollution-121/17/GKP and H/2172/C-6
(vi)Application No. H/2172/C-6/Air pollution-121/17/GKP and H/2172/C-6
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 602.53
(b) Funds Allocated for Environment Management (Capital) (in Crores) 35.44
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.52
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2304743
(b)Existing quantity of raw material/fuel 1418047
(c)Total quantity of raw material/fuel 3722790
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal792660Tons per AnnumImport/auction/ open marketRail500 MoUCopy of Linkage
(2.)Iron Ore fines883872Tons per AnnumOpen MarketRail500 Open MarketCopy of Linkage
(3.)Bentonite6336Tons per AnnumOpen MarketRoad500 Open MarketCopy of Linkage
(4.)Sponge Iron594000Tons per AnnumIn houseConveyor Belt0 CaptiveCopy of Linkage
(5.)MS Scrap200779Tons per AnnumLocal MarketRoad500 Open MarketCopy of Linkage
(6.)Ferro Alloy7841Tons per AnnumFrom Local ManufacturerRoad600 Open MarketCopy of Linkage
(7.)PELLET794772Tons per AnnumSelf / ManufacturerRoad500 OthersSelf / ManufacturerCopy of Linkage
(8.)Dolochar80190Tons per AnnumIn HouseConveyor Belt0 CaptiveCopy of Linkage
(9.)Iron ore66528Tons per AnnumOpen marketRail1000 Open MarketCopy of Linkage
(10.)Dolomite33660Tons per AnnumOpen MarketRoad500 Open MarketCopy of Linkage
(11.)Limestone7920Tons per AnnumOpen MarketRoad700 Open MarketCopy of Linkage
(12.)Rice Husk35244Tons per AnnumLocal MarketRoad200 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube93.658.392.82100
(2.)PM2.5Micro Gram per Meter Cube54.526.553.5160
(3.)SO2Micro Gram per Meter Cube20.67.020.2480
(4.)NOxMicro Gram per Meter Cube36.712.936.3480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l414.8164.9200600
(2.)Chloridesmg/l192.4727.072501000
(3.)TSSmg/l0000
(4.)pHNA8.027.356.58.5
(5.)TDSmg/l6782415002000
(6.)Fluoridemg/l0.840.5711.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l142.4E
(2.)CODmg/l52.410.8E
(3.)pHNA8.087.45B
(4.)DOmg/l75.2E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.952.6Industrial 75, Commercial 65 & Residential 55
(2.)Leq(Night)A-weighted decibels(dB(A))62.641.4Industrial 70, Commercial 55 & Residential 45
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.867.12
(2.)N(Nitrogen)Kilogram per hectare195.05125.48
(3.)K(Potassium)Kilogram per hectare261.19113.18
(4.)Electric ConductivityMillisiemens per Centimetre0.340.14
(5.)P(Phosphorus)Kilogram per hectare22.348.65
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.13 To 6.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 4.49
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater67760 Not Appliacble PipelineTube Well21-4(161)/NR/CGWA/2008-90814 May 20186776
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic120300STPGreen Belt Renewal Plant120
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 120
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 120
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DolocharIndustrial Waste80190Tons0Conveyor BeltOthersUsed in AFBC boiler for captive power generation
(2.)Ash from Pellet PlantIndustrial Waste6600Tons500RoadOthersWill be given to cement manufacturers
(3.)SlagIndustrial Waste65340Tons200RoadOtherslow lying area & road construction
(4.)Ash & DustFly Ash115500Tons300RoadOthersgiven to cement plant and brick manufacturer
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube19.41020.9180
(2.)NOxMicrogram per Meter Cube35.51036.480
(3.)PM10Microgram per Meter Cube911094.65100
(4.)PM2.5Microgram per Meter Cube50.11051.6260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)750 TPD DRI Kiln StackCoal753.7PM1030
(2.)27.5 T IF StackCoal302.8PM1030
(3.)110 TPH Boiler StackCoal1004SO2100
(4.)Pellet Plant StackCoal453PM1030
(5.)150 TPD DRI Kiln StackCoal452PM1030
(6.)110 TPH Boiler StackCoal1004PM1030
(7.)110 TPH Boiler StackCaol1004NOx100
(8.)22.5 T IF StackCoal302.8PM1030
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100625
(b)Source 80.5 MW CPP, WHRB & backup power from Purvanchal V
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 x 600 KVA, 1x2500KVA, 2 x2000 KVA, 1x1250 KVA,
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 45.903
    Total Land (ha.) 45.903
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25394.57
(b)Waste/Barren Land (ha.) 1230.86
(c)Grazing/ Community Land (ha.) 2286.97
(d)Surface Water Bodies (ha.) 1880.1
(e)Settlements (ha.) 3532.87
(f)Industrial (ha.) 241.36
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 34566.73
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant21.205
(2.)OthersWagon Tripler and Railway Siding3.6944Wagon Tripler and Railway Siding
(3.)Green belt15.29
(4.)Township5.7136Colony and Road & Paved area
Total (ha.) 45.903
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0No WLS within 10 km radius
(2.)ESAsNot Applicable0No ESA within 10 km radius
(3.)NPANot Applicable0No NPA within 10 km radius
(4.)CorridorsNot Applicable0No Corridors within 10 km radius
(5.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(6.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(7.)ESZsNot Applicable0No ESZ within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0No forest within 10 km radius
(2.)Defence InstallationsNot Applicable0No defence installations within 10 km radius
(3.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 45.903
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rapti
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 1105
(c)Temporary Employment- During Construction 450
(d)Temporary Employment- During Operation 300
(e)No. of working days 330
(f)Total Manpower 1875
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt13.411.8815.29
(2.)Percentage of Total Project Area29.213.9233.13
(3.)No. of Plants150262131936345
(4.)Funds Allocated101020
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialImproved livelihood with increased Business opportunities
(2.)EnvironmentalZero Liquid Discharge & greenbelt development
(3.)SocialEmployment generation and CER activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply 10 Jun 2020
2.NA

Proposal deferred for want of additional information.

13 Mar 2020
3. ADS Reply LetterADS Reply 05 Feb 2020
4.NA

Proposal deferred for want of additional information.

20 Jan 2020
5. ADS Reply LetterADS Reply attached for your kind consideration 04 Jan 2020
6.NA

Proposal deferred for want of additional information.

06 Nov 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNavneet Jindal
DesignationManager Commercial
Name of Company (Applicant Name should not be given here)GALLANTT ISPAT LIMITED
AddressPlot No. AL – 5, Sector No. 23, GIDA Industrial estate, Vill- Sahbajganj & Domharmaphi Tehsil – Sahajanwa District- Gorakhpur (U.P)
Print