|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Shirguppi Sugar Works Ltd. | (b)Name of the Company / Organisation | M/S. SHIRAGUPPI SUGAR WORKS LIMITED | (c)Registered Address | M/s Shiraguppi Sugar Works Ltd
Kagwad village,Athani Tq.Belgaum Dist.karnataka,,Belgaum,Karnataka-590016 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr Ramesh P Doddannavar | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | M/s Shiraguppi Sugar works Ltd
Doddannavar Trade links,
Near Fort, Old Pune -Bangalore Road,,,Athni,Belgaum,Karnataka-590016 | (d)Pin code | 590016 | (e)E-mail | hra@sswlsugars.com | (f)STD Code. | 0(f)Telephone No. | 2461231 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/KA/IND2/119111/2018 | (d)Master Proposal Number(Single Window) | SW/119109/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | S. No. 23/A, 36/1A,4A, 40/1, 40/2B, 48/2A+B, 48/1E | (b)Pincode | 591223 | (c)Bounded Latitudes (North) | | From | | Degree | 164232.01 | Minutes | | Second | | From | | Degree | 164251.99 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 744255.80 | Minutes | | Second | | From | | Degree | 744324.74 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47L9, 47L10, 47L13 & 47L14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 560 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.6 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/299/2018-IA-II(I) | (b)Date of Apply of TOR | 05 Oct 2018 | (c)Date of Issue of TOR / Standard ToR | 09 Nov 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 24 Jun 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.1 |
| Industrial Site - S. No. 23/A, 36/1A,4A, 40/1, 40/2B, 48/2A+B, 48/1E+P+G+2A+2B, 49/1+2A/3, 49/2B+3A, 49/3B, 49/4, 50/1,2,3,4,5, 52/1+2A/1, 53/1+2+3, 54/1A, 54/2B & 54/1B+2A, Kagwad, | State : | Karnataka | District : | Belgaum | Tehsil : | Athni | Village : | Kagwad |
| 104 | Employment to local people, grampanchayat tax | Others | Additional Deputy Commissioner & Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Sugar Factory | 10000 TCD | Expansion from 4000 TCD to 10000 TCD | (2.) | Distillery | 120 KLPD | Establishment of molasses based distillery | (3.) | Cogeneration | 60 MW | Expansion from 15 MW to 60 MW | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ethanol/RS/ENA | 3600 | Others | KL/Month | Road | | (2.) | Pressmud | 12000 | Others | MT/Month | Road | | (3.) | CO2 | 2850 | Others | MT/Month | Others | Cyllinders | (4.) | Sugar | 32700 | Others | MT/Month | Road | | (5.) | Molasses | 12000 | Others | MT/Month | Road | | (6.) | Bagasse | 90000 | Others | MT/Month | Road | | (7.) | Electricity | 1800 | Others | MW/Month | Others | Grid | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 20 Mar 2017 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-302308 | (vi)Application No. | e-outwardno 4470--20/03/2017 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 300 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 25.31 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.93 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.31 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sugar cane | 300000 | Others | MT/Month | Nearby farms | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Sulphur | 200 | Others | MT/Month | Local Supplier | Road | | 25 | Others | Agreement | Copy of Linkage | (3.) | Molasses | 13350 | Others | MT/Month | Own sugar factory/ outside purchase | Road | | 25 | Captive | | Copy of Linkage | (4.) | Urea | 4 | Others | MT/Month | outside purchase | Road | | 25 | Open Market | | Copy of Linkage | (5.) | De-Foaming Oil | 12 | Others | MT/Month | outside purchase | Road | | 25 | Open Market | | Copy of Linkage | (6.) | Bagasse | 60480 | Others | MT/Month | Own sugar factory | Road | | 0.5 | Captive | | Copy of Linkage | (7.) | Lime | 600 | Others | MT/Month | Local vendors | Road | | 25 | Others | Agreement | Copy of Linkage | (8.) | Yeast | 8 | Others | MT/Month | self propagated | Road | | 0.5 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 31.1 | 14.5 | 26.5 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 68.2 | 51.4 | 62.45 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 29.8 | 12.4 | 25.64 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 38.4 | 25.4 | 35.2 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 0.18 | 0.03 | 0.13 | 2 (8 Hr) | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.7 | 7.4 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 51.28 | 24.57 | 100 | 100 | (3.) | Chlorides | | | mg/l | | 84.5 | 45.1 | 250 | 250 | (4.) | Others | Boron | | mg/l | | 0.34 | 0.08 | 0.5 | 0.5 | (5.) | Fluoride | | | mg/l | | 1.35 | 0.57 | 1 | 1 | (6.) | TDS | | | mg/l | | 625.1 | 409 | 500 | 500 | (7.) | Total Hardness | | | mg/l | | 443.6 | 299.2 | 200 | 200 | (8.) | Heavy Metals | | Zinc | mg/l | | 1.09 | 0.34 | 5 | 5 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.91 | 7.4 | A | (2.) | BOD | | mg/l | | 21.93 | 9.0 | E | (3.) | DO | | mg/l | | 5.5 | 1.9 | E | (4.) | COD | | mg/l | | 44.96 | 31 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 66.6 | 37.3 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 68 | 52 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.94 | 7.1 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 374.6 | 0.015 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 168.4 | 121.6 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 571.6 | 11.24 | (5.) | K(Potassium) | Milligram per Kilogram | | 90.8 | 15.12 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.89 To 18.35 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.81 To 12.78 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 330 | 3 | Copy of Permission Letter | Pipeline | | Jack Well | | Belgaum/ C2/17-18/3762 | 12 Sep 2017 | 4052 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Other effluent (Distillery) | 991 | 1000 | Treated in proposed Condensate Polishing Unit (CPU) | Reuse within the Plant & Recycling | | 991 | | (2.) | Domestic Effluent - Sugar, Cogen & Distillery | 21 | 30 | In proposed STP | Reuse within the Plant & Recycling | Used for flushing | 21 | | (3.) | Raw Spentwash (Distillery) | 895 | 1000 | Concentrated in MEE & incinerated | Others | Concentration followed by Incineration | 895 | 0 | (4.) | Industrial effluent - Sugar & Cogen | 751 | 1450 | Primary, secondary & tertiary treatment | Others | used for irrigation purpose | 751 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2658 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2658 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Boiler Ash (Coal+Spentwash) | Bottom Ash | | 17160 | Tons | 0.5 | Road | | Others | brick/cement manufacturers | (2.) | ETP sludge | Industrial Waste | | 126 | Tons | 0.5 | Road | | Others | Manure | (3.) | Yeast Sludge | Industrial Waste | | 8910 | Tons | 0.5 | Road | | Others | Manure | (4.) | Boiler Ash (Bagasse) | Industrial Waste | | 9072 | Tons | 1 | Conveyor Belt | | Others | Manure/brick manufacturers | (5.) | CPU Sludge | Industrial Waste | | 220 | Tons | 0.5 | Road | | Others | Manure | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 62.45 | 1.74 | 0.03 | 62.481 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 26.58 | 1.4 | 0.01 | 26.591 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 25.64 | 1.83 | 0.8 | 26.441 | 80 | (4.) | NOx | | Microgram per Meter Cube | 35.2 | 1.2 | 0.13 | 35.331 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Proposed 100 TPH Boiler (sugar & cogen expansion) | Bagasse-1008 MT/D | 90 | 3.3 | PM10 | | 65 micro gram/cubic meter | (2.) | Proposed Incineration Boiler-40TPH | Coal/Bagasse+Spent wash-75 MT/D+243 MT/D | 70 | 2.5 | SO2 | | 230 Kg/Hr | (3.) | Existing 100 TPH Boiler | Bagasse-1008 MT/D (common stack will be provided) | 90 | 3.3 | PM10 | | 65 micro gram/cubic meter | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20500 | (b)Source | Own Cogen Plant - 60 MW | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Two DG Sets of 1010 KVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 49.74 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 49.74 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 18020 | (b)Waste/Barren Land (ha.) | 10260 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 291 | (e)Settlements (ha.) | 910 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Grass land with open scrub | 1934 | Total (ha.) | 31415 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 4.56 | | (2.) | Green belt | | 16.99 | Existing & proposed green belt | (3.) | Others | Open Space/ area | 28.17 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | There is no presence of WLS in 10Km radius of Project | (2.) | ESZs | Not Applicable | 0 | There is no presence of ESZ in 10Km radius of Project | (3.) | Wildlife Corridors | Not Applicable | 0 | There is no presence of wildlife corridors in 10Km radius of Project | (4.) | Critically Polluted Area | Not Applicable | 0 | There is no presence of CPA's in 10 Km radius of Project | (5.) | Corridors | Not Applicable | 0 | There is no presence of Corridors in 10 Km radius of Project | (6.) | NPA | Not Applicable | 0 | There is no presence of NPA's in 10Km radius of Project | (7.) | ESAs | Not Applicable | 0 | There is no presence of ESAs in 10Km radius of Project | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not Applicable | 0 | There is no presence of defence installations in 10 Km radius of Project | (2.) | Forest | | Not Applicable | 0 | There is no presence of forest land in 10 Km radius of Project | (3.) | Archaeological Sites | | Not Applicable | 0 | There is no presence of notified archaeological sites in 10 Km radius of Project | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 49.47 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Marsh crocodile, Indian monitor lizard, Indian flap-shell turtle, Indian peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Krishna river - 3.1 Km | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | Belgaum/C2/17-18/3762 | (iii)Date of issue | 12 Sep 2017 | (iv)Recommendation | NA | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 80 | (b)Permanent Employment-During Operation | 330 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 30 | (e)No. of working days | 330 | (f)Total Manpower | 490 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 16.69 | (b)Percentage of Total Project Area | 33.55 | (c)No. of Plants to be Planted | 20000 | (d)Funds Allocated for Plantation | 2500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | In order to run the existing and expansion projects, all about 490 nos. of skilled and unskilled workers would be employed. Out of these total workers, about 275 workers have already been hired from local areas. Local persons shall be given preference while appointing for expansion project | (2.) | Environmental | • Industry shall adopt the rain water harvesting systems that will improve the ground water table in surrounding area.
• Augmentation of existing green belt and plantation of additional trees in the industrial area and its surrounding shall help in improving the aesthetic beauty of the surrounding environment giving a pleasant look and improvising the air quality. Also green belt will help in arresting dust emissions as well as noise. | (3.) | Financial | • Due to expansion, the frequency of the local transportation will increase in this area. This will help shorten the time reaching destination and utilize it for some fruitful productive work.
After expansion of the industry, the industry will meet the national interest of economical growth through sustainable development, as alcohol has been a great source of revenue through excise duty levied by the Government. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/ 1821/ RA 0135 | (ii)Name of the EIA Consultant | Equinox Environments India Pvt. Ltd. | (iii)Address | F-11, Namdev Nest, 1160 B, E Ward, Sykes Extension, Opposite Kamla College, Kolhapur | (iv)Mobile No. | 9657865122 | (v)Landline No. | 0231253123 | (vi)Email Id | projects@equinoxenvi.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 21 Oct 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr Ramesh P Doddannavar | Designation | Managing Director | Name of Company (Applicant Name should not be given here) | M/S. SHIRAGUPPI SUGAR WORKS LIMITED | Address | M/s Shiraguppi Sugar Works Ltd
Kagwad village,Athani Tq.Belgaum Dist.karnataka |
|