Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Sugar Factory capacity from 7500 to 13,200 TCD, Distillery capacity from 45 to 145 KLPD,/ ENA-20 to100 KLPD and establishing 100 KLPD Ethanol and 24MW Co-generation Power Plant at Yeshwan
(b)Name of the Company / Organisation SAHYADRI SAHAKARI SAKHAR KARKHANA LTD
(c)Registered Address Yeshwantnagar, Taluka Karad, District Satara.,,Satara,Maharashtra-415115
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Abasaheb Jotiram Patil
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Sahyadri SSK Ltd, Yeshwantnagar, Taluka Karad, District Satara,,Karad,Satara,Maharashtra-415115
(d)Pin code 415115
(e)E-mail bssubbarao@yahoo.com
(f)STD Code. 2164(f)Telephone No. 661500
(g)Fax No. 02164661566
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/118935/2018
(d)Master Proposal Number(Single Window) SW/82060/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1 to 10, 12 to 46, 48,52,53,56,62/1(B),63/2,64/2,6
(b)Pincode 415115
(c)Bounded Latitudes (North)
From
Degree 17.3563
Minutes
Second
From
Degree 17.3685
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.1589
Minutes
Second
From
Degree 74.1708
Minutes
Second
(e)Survey of India Topo Sheet No. E4303, E4307
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 600
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/114/2018-IA-II(I)
(b)Date of Apply of TOR 26 Mar 2018
(c)Date of Issue of TOR / Standard ToR 04 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Sahyadri Sahakari Sakhar Karkhana Limited
State :Maharashtra
District :Satara
Tehsil :Karad
Village :Yeshwantnagar
130The people residing near the industry are in favor of the proposed expansion activity. The people are satisfied with the overall performance of the industryDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Distillery145 KLPD45 KLPD to 145 KLPD
(2.)Co-generation Power Plant24 MW--
(3.)Sugarcane Crushing Capacity13200 TCD7500 TCD to 13200 TCD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sugarcane crushing13200Tons Crushed per DayRoad
(2.)Distillery (RS/ENA/Ethanol)145Kilo Litre per DayRoad
(3.)Power24Mega Watt(MW)Othersgrid
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Jan 2019
(iv)Valid Upto 31 Jul 2019
(v)File No. Format 1.0/BO/CAC-CELL/UAN No. 0000053567/R/CAC-19
(vi)Application No. 0000053567
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 300
(b) Funds Allocated for Environment Management (Capital) (in Crores) 54.90
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 13200
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 13200
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bagasse529920Tons per Annumopen marketRoad0 CaptiveCopy of Linkage
(2.)Sulphur619.12Tons per Annumopen marketRoad30 Open MarketCopy of Linkage
(3.)Sugar cane2376000Tons per AnnumLocalRoad50 MoUCopy of Linkage
(4.)Lime3331.35Tons per Annumopen marketRoad30 Open MarketCopy of Linkage
(5.)Molasses161248.85Tons per AnnumCaptiveRoad0 CaptiveCopy of Linkage
(6.)Coal34650Tons per Annumopen marketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2018 To 30 Apr 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 09
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube43.711.441.30860
(2.)NOxMicro Gram per Meter Cube40.520.139.1280
(3.)OthersCOMili Gram per Meter Cube1.40.391.35402
(4.)SO2Micro Gram per Meter Cube41.316.440.05880
(5.)PM10Micro Gram per Meter Cube59.630.256.887100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l8303425002000
(2.)pHNA7.787.226.58.5
(3.)Chloridesmg/l117202501000
(4.)Fluoridemg/l0.380.1611.5
(5.)Heavy MetalsMercurymg/l000.0010.001
(6.)Total Hardnessmg/l642275300600
(7.)TSSmg/l0005
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l33A
(2.)pHNA7.927.15A
(3.)DOmg/l7.156.4A
(4.)CODmg/l448A
    14.4.     No. of Ambient Noise monitoring locations : 09
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.543.875
(2.)Leq(Night)A-weighted decibels(dB(A))52.939.270
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.406.90
(2.)N(Nitrogen)Kilogram per hectare291158
(3.)P(Phosphorus)Kilogram per hectare7729
(4.)K(Potassium)Kilogram per hectare840479
(5.)Electric ConductivityMillisiemens per Centimetre0.350.129
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5083.0Copy of Permission LetterPipelineOpen Well2245/201613 May 20162003.03
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process effluent (Sugar and Co-generation)5452000Primary and Secondary TreatmentOthersOn Land for Irrigation0545
(2.)Process Effluent (45 KLPD Distillery)270300CompostingOthersZero Liquid Discharge2700
(3.)Process effluent (100 KLPD Distillery)200250Concentration and incinerationReuse within the Plant & Recycling,OthersZero Liquid Discharge2000
(4.)Spentless, Washings, Cooling tower blowdown, MEE770800CPUReuse within the Plant & Recycling770
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1785
(b)Total Discharged Water (Kilolitre per Day) 545
(c)Total Reused Water (Kilolitre per Day) 1240
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)PressmudIndustrial Waste72000Tons0RoadOthersUsed in composting along with spentwash
(2.)ETP SludgeIndustrial Waste100Tons0RoadOthersTreated in composting
(3.)Fly ashFly Ash9000Tons0RoadOthersSold to brick Manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube41.30.5414.2855.58180
(2.)PM2.5Microgram per Meter Cube43.71.030.0743.77160
(3.)PM10Microgram per Meter Cube59.61.030.1159.711100
(4.)NOxMicrogram per Meter Cube40.51.030.5741.07180
(5.)Others(Specify)COMicrogram per Meter Cube1.41.030.000071.4000712
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2*120 TPH BoilerBagasse804.0PM103.20
(2.)2*120 TPH BoilerBagasse804.0SO26.85
(3.)2*120 TPH BoilerBagasse804.0NOx6.40
(4.)1*35 TPH Incinerator BoilerCoal + Conc. Spenntwash704.0PM103.24
(5.)1*35 TPH Incinerator BoilerCoal+ Conc. Spentwash704.0SO27.06
(6.)1*35 TPH Incinerator BoilerCoal + Conc. Spentwash704.0NOx6.59
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17.0
(b)Source Captive
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 785 KVA
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 97.88
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 97.88
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 18726
(b)Waste/Barren Land (ha.) 11666
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 790
(e)Settlements (ha.) 5201
(f)Industrial (ha.) 100
(g)Forest (ha.) 3517
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : 00 00
    Total (ha.) 40000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area9.052147Builtup Area
(2.)Green belt32.3010
(3.)Safety Zone28.25Area under roads and Parking
(4.)OthersVacant Land28.276853
Total (ha.) 97.88
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNot Applicable0No ESZs within 10 Km radius of the factory site
(2.)Wildlife CorridorsNot Applicable0No wildlife corridors within 10 Km radius of the factory site
(3.)Critically Polluted AreaNot Applicable0No critically polluted area within 10 Km radius of the factory site
(4.)WLSNot Applicable0No WLS within 10 Km radius of the factory site
(5.)NPANot Applicable0No NPA within 10 Km radius of the factory site
(6.)CorridorsNot Applicable0No corridors within 10 Km radius of the factory site
(7.)ESAsNot Applicable0No ESAs within 10 Km radius of the factory site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Applicable0No Archaeological Sites within 10 Km radius of the factory site
(2.)ForestReserved Forest1Reserved Forest Area is adjascent to the project site
(3.)Defence InstallationsNot Applicable0No Defence installations within 10 Km radius of the factory site
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Krishna River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 70
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 32.30
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 48450
(d)Funds Allocated for Plantation 4845000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 079
(ii)Name of the EIA Consultant Dr. Subbarao's Environment Center
(iii)Address 'ARUNDHATI' BUNGALOW, OPP. SAHAYOGNAGAR,
(iv)Mobile No. 9372109522
(v)Landline No. 0233230185
(vi)Email Id bssubbarao@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 11 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAbasaheb Jotiram Patil
DesignationMD
Name of Company (Applicant Name should not be given here)SAHYADRI SAHAKARI SAKHAR KARKHANA LTD
AddressYeshwantnagar, Taluka Karad, District Satara.
Print