1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of Synthetic Organic Chemicals (API’s & Intermediates) Manufacturing Facility by Megafine Pharma (P) Ltd. at Plot No. 31 to 35, 48 to 51, 1 to 5, 26 & K/ Gut No 201, Lakhmapur, Tal. | (b)Name of the Company / Organisation | MEGAFINE PHARMA PVT LTD | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Milap Chand Bhatt Bhatt | (b)Designation (Owner/ Partner/ CEO) | Deputy Manager Liaison | (c)Address | 31 to 35, 48 to 51, 1 to 5, 26, K/201, Lakhamapur, Tal. Dindori, Dist. Nashik,,Dindori,Nashik,Maharashtra-422202 | (d)Pin code | 422202 | (e)E-mail | ehs.nashik@megafine.in | (f)STD Code. | 2557(f)Telephone No. | 250121 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/MH/IND2/50828/2016 | (d)Master Proposal Number(Single Window) | SW/118852/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 31 to 35, 48 to 51, 1 to 5, 26 & K/ Gut N | (b)Pincode | 422202 | (c)Bounded Latitudes (North) | | From | | Degree | 20.25 | Minutes | | Second | | From | | Degree | 20.26 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.50 | Minutes | | Second | | From | | Degree | 73.51 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43T15 F43T16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 600 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Nashik | Dindori | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/91/2016- IA II(I) | (b)Date of Apply of TOR | 10 Jun 2016 | (c)Date of Issue of TOR / Standard ToR | 23 Sep 2016 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 07 Sep 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| site of Megafine Pharma P Ltd | State : | Maharashtra | District : | Nashik | Tehsil : | Dindori | Village : | Lakhmapur |
| 128 | CSR and CER | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Agitated Reactor Columns Condensers Pumps | Proposed | No | (2.) | Vacuum Systems Cooling Towers Chilling Units | Proposed | No | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Anti-Ocular Hypertensive | 0.5 | Tons per Annum | | Road | | (2.) | Anthelmentic | 300 | Tons per Annum | | Road | | (3.) | Post-Operative Distention | 0.5 | Tons per Annum | | Road | | (4.) | Thrombotic | 2.5 | Tons per Annum | | Road | | (5.) | Alzhemiers | 7.5 | Tons per Annum | | Road | | (6.) | Schizophrenia | 102.8 | Tons per Annum | | Road | | (7.) | Cystic fibrosis | 1.1 | Tons per Annum | | Road | | (8.) | Research & Development (R & D) activity | 0 | Tons per Annum | | Road | | (9.) | Over Active Bladder | 3.95 | Tons per Annum | | Road | | (10.) | Antidepressants | 108.1 | Tons per Annum | | Road | | (11.) | Antianginal | 0.55 | Tons per Annum | | Road | | (12.) | Antihypertensive | 60.45 | Tons per Annum | | Road | | (13.) | Multiple sclerosis | 5 | Tons per Annum | | Road | | (14.) | Acute coronary syndrome | 0.55 | Tons per Annum | | Road | | (15.) | Psoriatic Arthritis | 1.5 | Tons per Annum | | Road | | (16.) | Antiemetic | 0.6 | Tons per Annum | | Road | | (17.) | Cough suppressant and not antidepressants | 11 | Tons per Annum | | Road | | (18.) | Antifungal | 25 | Tons per Annum | | Road | | (19.) | Coagulant | 9.6 | Tons per Annum | | Road | | (20.) | Insomnia | 0.8 | Tons per Annum | | Road | | (21.) | Antidiabetic | 4 | Tons per Annum | | Road | | (22.) | Anti-hyperparathyroidism | 4 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 12 Oct 2018 | (iv)Valid Upto | 31 Dec 2019 | (v)File No. | Format 1.0/BO/CAC-Cell/UAN No. 0000038464/1st CAC- | (vi)Application No. | 0000038464 | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 75 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.89 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Methanol | 190 | Others | Ton per month | nearby | Road | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 06 Mar 2017 To 23 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Mili Gram per Meter Cube | 0.72 | 0.32 | 0.71 | 4 | (2.) | NOx | | Micro Gram per Meter Cube | 14.1 | 11.3 | 13.8 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 69.2 | 54.6 | 69 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 22.1 | 13.2 | 21.7 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 14.4 | 9.7 | 14.3 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 6.46 | 6.46 | 8.5 | 8.5 | (2.) | Chlorides | | | mg/l | | 16.3 | 16.3 | 250 | 1000 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 150 | 150 | 500 | 2000 | (5.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (6.) | Heavy Metals | | Cd | mg/l | | 0 | 0 | 0.003 | 0.003 | (7.) | Total Hardness | | | mg/l | | 50 | 50 | 200 | 600 | (8.) | Others | Copper | | mg/l | | 0 | 0 | 0.05 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.05 | 7.05 | C | (2.) | BOD | | mg/l | | 0 | 0 | C | (3.) | COD | | mg/l | | 0 | 0 | C | (4.) | Others | Dissolve solids | mg/l | | 130 | 130 | C | (5.) | DO | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.6 | 61.6 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.8 | 60.8 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.38 | 7.38 | (2.) | N(Nitrogen) | Kilogram per hectare | | 17.3 | 17.3 | (3.) | P(Phosphorus) | Kilogram per hectare | | 15.4 | 15.4 | (4.) | K(Potassium) | Kilogram per hectare | | 53.6 | 53.6 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 335 | 335 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 18.36 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.2 To 18.42 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | CGWA/NOC/IND/ORIG/2019/5235 | (f)Date of Issue | 14 May 2019 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Surface or Ground Water | 300 | 5 | Copy of Permission Letter | Pipeline | | Others | Ozhar khed Dam & open well | 1552 2019 | 16 Apr 2019 | 300 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic, process, Cooling & Boiler blow down | 150 | 160 | LTDS- Primary & secondary followed by RO. HTDs- MEE | Reuse within the Plant & Recycling | | 150 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 150 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 150 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Empty Containers (MS/GI/Fiber Drums etc.) | Industrial Waste | | 6720 | Tons | 0 | Road | | Others | After decontamination sale to scrap dealer | (2.) | HDPE bags | Industrial Waste | | 9000 | Tons | 0 | Road | | Others | After decontamination sale to scrap dealer | (3.) | Garden waste | Municipal Solid Waste | | 6 | Tons | 0 | Road | | Others | Natural decaying & used as manure | (4.) | Empty glass bottles | Industrial Waste | | 6000 | Tons | 0 | Road | | Others | After decontamination sale to scrap dealer | (5.) | Waste or residue containing oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.1 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Distillation residues | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 14.58 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | Spent catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.15 | Tons | 0 | Road | | Others | Recovered and Recycled | (8.) | Spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 29.9 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (9.) | Spent Organic solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2220.8 | Tons | 0 | Road | | Others | Sale to authorized recycler | (10.) | Empty barrels containers contaminated | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 11400 | Tons | 0 | Road | | Others | Sale to authorized recycler. | (11.) | Chemical sludge from waste water treatment | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 237.94 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (12.) | Filter and filter materials | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (13.) | E- waste | E Waste | | 3 | Tons | 0 | Road | | Others | Authorized Agency | (14.) | Off specification products | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (15.) | Liners contaminated | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.4 | Tons | 0 | Road | | Others | Sale to authorized recycler. | (16.) | Used or spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6.5 | Tons | 0 | Road | | Others | Sale to authorized recycler | (17.) | Discarded Aprons and Uniforms | Industrial Waste | | 0.6 | Tons | 0 | Road | | Others | Sale to Scrap dealer and used in cleaning | (18.) | Bio medical waste | Bio-Medical Waste | | 0.1 | Tons | 0 | Road | | Others | CBMWTSDF | (19.) | Discarded Batteries | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 25 | Tons | 0 | Road | | Others | Authorized Recycler | (20.) | Boiler ash | Fly Ash | | 336 | Tons | 0 | Road | | Others | Landfill / brick manufacturer | (21.) | Scrap (MS/SS) | Industrial Waste | | 60 | Tons | 0 | Road | | Others | Sale to scrap dealer | (22.) | Paper waste | Municipal Solid Waste | | 1.8 | Tons | 0 | Road | | Others | Sale to scrap dealer | (23.) | Food waste | Industrial Waste | | 40 | Tons | 0 | Road | | Others | Composting & used as manure | (24.) | Packing materials e.g. wood. | Industrial Waste | | 6 | Tons | 0 | Road | | Others | Sale to scrap dealer | (25.) | Process Residue and wastes | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (26.) | Date-expired products | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 62.7 | 0.8 | 0.78 | 63.49 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 12.4 | 0.8 | 1.87 | 14.28 | 80 | (3.) | NOx | | Microgram per Meter Cube | 12.4 | 0.8 | 0.53 | 12.94 | 80 | (4.) | Others(Specify) | CO | NA | 0 | 0.8 | 0 | 0.1 | 4 | (5.) | PM2.5 | | Microgram per Meter Cube | 22.1 | 0.8 | 0 | 22.2 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 6 TPH Boiler | Bio briquette 24 TPD | 30.4 | 0 | PM10 | | 0 | (2.) | 750 KVA DG set | HSD | 30 | 0 | PM10 | | 0 | (3.) | 3 TPH Boiler | Bio briquette 500 kg/ Hr | 30.4 | 0 | PM10 | | 0 | (4.) | 750 KVA DG set | HSD | 30 | 0 | PM10 | | 0 | (5.) | 3 TPH Boiler | Bio briquette 12 TPD | 30.4 | 0 | PM10 | | 0 | (6.) | 2 Lac Kcal Hr TFH | Diesel 340 Lit Hr | 24 | 0 | PM10 | | 0 | (7.) | 750 KVA DG set | HSD 150 Lit Hr | 30.5 | 0 | PM10 | | 0 | (8.) | 750 KVA DG set | HSD 150 Lit Hr | 30.5 | 0 | PM10 | | 0 | (9.) | 78.2 KVA DG set | 5.1 | 5.1 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2990 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 4 nos. of 750 KVA & 1 no. of 78.20 KVA DG set | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2.3605 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.3605 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 9036 | (b)Waste/Barren Land (ha.) | 1381 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2401 | (e)Settlements (ha.) | 1197 | (f)Industrial (ha.) | 130 | (g)Forest (ha.) | 839 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow land | 11767 | Total (ha.) | 26751 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.3605 | | (2.) | Green belt | | 0.817 | | (3.) | Built Up Area | | 2.7532 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 0 | NA | (2.) | ESZs | NA | 0 | NA | (3.) | Wildlife Corridors | NA | 0 | NA | (4.) | WLS | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | Corridors | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Others | NA | NA | 0 | NA | (3.) | Forest | | NA | 0 | NA | (4.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kadwa river | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 1.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 6 | (f)Total Manpower | 150 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.817 | (b)Percentage of Total Project Area | 34.61 | (c)No. of Plants to be Planted | 800 | (d)Funds Allocated for Plantation | 5 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Increase in export, Local employment | (2.) | Social | Social upliftment through CER | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/ EIA/ 1720/ RA 0117 rev 01 | (ii)Name of the EIA Consultant | Aditya Environmental Services Pvt. Ltd. | (iii)Address | 107, Hiren Light Industrial estate, Mogul Lane, Mahim- west, Mumbai | (iv)Mobile No. | 9821513367 | (v)Landline No. | 0224212750 | (vi)Email Id | rajiv@aespl.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 24 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | May kindly refer to the observations made earlier. You were requested to provide the reply to the observations made but no reply was found with your application. Therefore, again it is requested to provided reply to the observation made for further consideration of the proposal. | 30 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 31 Oct 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Milap Chand Bhatt Bhatt | Designation | Deputy Manager Liaison | Name of Company (Applicant Name should not be given here) | MEGAFINE PHARMA PVT LTD | Address | Sethna, 4th floor, 55 Maharshi Karve Road, Marine Lines, Mumbai- 400002 |
|