Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion of Synthetic Organic Chemicals (API’s & Intermediates) Manufacturing Facility by Megafine Pharma (P) Ltd. at Plot No. 31 to 35, 48 to 51, 1 to 5, 26 & K/ Gut No 201, Lakhmapur, Tal.
(b)Name of the Company / Organisation MEGAFINE PHARMA PVT LTD
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Milap Chand Bhatt Bhatt
(b)Designation (Owner/ Partner/ CEO) Deputy Manager Liaison
(c)Address 31 to 35, 48 to 51, 1 to 5, 26, K/201, Lakhamapur, Tal. Dindori, Dist. Nashik,,Dindori,Nashik,Maharashtra-422202
(d)Pin code 422202
(e)E-mail ehs.nashik@megafine.in
(f)STD Code. 2557(f)Telephone No. 250121
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/MH/IND2/50828/2016
(d)Master Proposal Number(Single Window) SW/118852/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 31 to 35, 48 to 51, 1 to 5, 26 & K/ Gut N
(b)Pincode 422202
(c)Bounded Latitudes (North)
From
Degree 20.25
Minutes
Second
From
Degree 20.26
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.50
Minutes
Second
From
Degree 73.51
Minutes
Second
(e)Survey of India Topo Sheet No. F43T15 F43T16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 600
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraNashikDindori
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/91/2016- IA II(I)
(b)Date of Apply of TOR 10 Jun 2016
(c)Date of Issue of TOR / Standard ToR 23 Sep 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
site of Megafine Pharma P Ltd
State :Maharashtra
District :Nashik
Tehsil :Dindori
Village :Lakhmapur
128CSR and CEROthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Agitated Reactor Columns Condensers PumpsProposedNo
(2.)Vacuum Systems Cooling Towers Chilling UnitsProposedNo
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Anti-Ocular Hypertensive0.5Tons per AnnumRoad
(2.)Anthelmentic300Tons per AnnumRoad
(3.)Post-Operative Distention0.5Tons per AnnumRoad
(4.)Thrombotic2.5Tons per AnnumRoad
(5.)Alzhemiers7.5Tons per AnnumRoad
(6.)Schizophrenia102.8Tons per AnnumRoad
(7.)Cystic fibrosis1.1Tons per AnnumRoad
(8.)Research & Development (R & D) activity0Tons per AnnumRoad
(9.)Over Active Bladder3.95Tons per AnnumRoad
(10.)Antidepressants108.1Tons per AnnumRoad
(11.)Antianginal0.55Tons per AnnumRoad
(12.)Antihypertensive60.45Tons per AnnumRoad
(13.)Multiple sclerosis5Tons per AnnumRoad
(14.)Acute coronary syndrome0.55Tons per AnnumRoad
(15.)Psoriatic Arthritis1.5Tons per AnnumRoad
(16.)Antiemetic0.6Tons per AnnumRoad
(17.)Cough suppressant and not antidepressants11Tons per AnnumRoad
(18.)Antifungal25Tons per AnnumRoad
(19.)Coagulant9.6Tons per AnnumRoad
(20.)Insomnia0.8Tons per AnnumRoad
(21.)Antidiabetic4Tons per AnnumRoad
(22.)Anti-hyperparathyroidism4Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Oct 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. Format 1.0/BO/CAC-Cell/UAN No. 0000038464/1st CAC-
(vi)Application No. 0000038464
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.89
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol190OthersTon per monthnearbyRoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 06 Mar 2017 To 23 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube0.720.320.714
(2.)NOxMicro Gram per Meter Cube14.111.313.880
(3.)PM10Micro Gram per Meter Cube69.254.669100
(4.)PM2.5Micro Gram per Meter Cube22.113.221.760
(5.)SO2Micro Gram per Meter Cube14.49.714.380
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA6.466.468.58.5
(2.)Chloridesmg/l16.316.32501000
(3.)TSSmg/l0000
(4.)TDSmg/l1501505002000
(5.)Fluoridemg/l0011.5
(6.)Heavy MetalsCdmg/l000.0030.003
(7.)Total Hardnessmg/l5050200600
(8.)OthersCoppermg/l000.051.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.057.05C
(2.)BODmg/l00C
(3.)CODmg/l00C
(4.)OthersDissolve solidsmg/l130130C
(5.)DOmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.661.675
(2.)Leq(Night)A-weighted decibels(dB(A))60.860.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.387.38
(2.)N(Nitrogen)Kilogram per hectare17.317.3
(3.)P(Phosphorus)Kilogram per hectare15.415.4
(4.)K(Potassium)Kilogram per hectare53.653.6
(5.)Electric ConductivityMillisiemens per Centimetre335335
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 18.36
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.2 To 18.42
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/IND/ORIG/2019/5235
(f)Date of Issue 14 May 2019
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSurface or Ground Water3005Copy of Permission LetterPipelineOthersOzhar khed Dam & open well1552 201916 Apr 2019300
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, process, Cooling & Boiler blow down150160LTDS- Primary & secondary followed by RO. HTDs- MEEReuse within the Plant & Recycling150
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 150
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 150
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Empty Containers (MS/GI/Fiber Drums etc.)Industrial Waste6720Tons0RoadOthersAfter decontamination sale to scrap dealer
(2.)HDPE bagsIndustrial Waste9000Tons0RoadOthersAfter decontamination sale to scrap dealer
(3.)Garden wasteMunicipal Solid Waste6Tons0RoadOthersNatural decaying & used as manure
(4.)Empty glass bottlesIndustrial Waste6000Tons0RoadOthersAfter decontamination sale to scrap dealer
(5.)Waste or residue containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.1Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Distillation residuesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)14.58Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Spent catalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.15Tons0RoadOthersRecovered and Recycled
(8.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)29.9Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Spent Organic solventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2220.8Tons0RoadOthersSale to authorized recycler
(10.)Empty barrels containers contaminatedHazardous Waste (as per Hazardous and Other Waste Management rules 2016)11400Tons0RoadOthersSale to authorized recycler.
(11.)Chemical sludge from waste water treatmentHazardous Waste (as per Hazardous and Other Waste Management rules 2016)237.94Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(12.)Filter and filter materialsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)E- wasteE Waste3Tons0RoadOthersAuthorized Agency
(14.)Off specification productsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(15.)Liners contaminatedHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.4Tons0RoadOthersSale to authorized recycler.
(16.)Used or spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6.5Tons0RoadOthersSale to authorized recycler
(17.)Discarded Aprons and UniformsIndustrial Waste0.6Tons0RoadOthersSale to Scrap dealer and used in cleaning
(18.)Bio medical wasteBio-Medical Waste0.1Tons0RoadOthersCBMWTSDF
(19.)Discarded BatteriesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)25Tons0RoadOthersAuthorized Recycler
(20.)Boiler ashFly Ash336Tons0RoadOthersLandfill / brick manufacturer
(21.)Scrap (MS/SS)Industrial Waste60Tons0RoadOthersSale to scrap dealer
(22.)Paper wasteMunicipal Solid Waste1.8Tons0RoadOthersSale to scrap dealer
(23.)Food wasteIndustrial Waste40Tons0RoadOthersComposting & used as manure
(24.)Packing materials e.g. wood.Industrial Waste6Tons0RoadOthersSale to scrap dealer
(25.)Process Residue and wastesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(26.)Date-expired productsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.70.80.7863.49100
(2.)SO2Microgram per Meter Cube12.40.81.8714.2880
(3.)NOxMicrogram per Meter Cube12.40.80.5312.9480
(4.)Others(Specify)CONA00.800.14
(5.)PM2.5Microgram per Meter Cube22.10.8022.260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)6 TPH BoilerBio briquette 24 TPD30.40PM100
(2.)750 KVA DG setHSD300PM100
(3.)3 TPH BoilerBio briquette 500 kg/ Hr30.40PM100
(4.)750 KVA DG setHSD300PM100
(5.)3 TPH BoilerBio briquette 12 TPD30.40PM100
(6.)2 Lac Kcal Hr TFHDiesel 340 Lit Hr240PM100
(7.)750 KVA DG setHSD 150 Lit Hr30.50PM100
(8.)750 KVA DG setHSD 150 Lit Hr30.50PM100
(9.)78.2 KVA DG set5.15.10PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2990
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4 nos. of 750 KVA & 1 no. of 78.20 KVA DG set
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.3605
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.3605
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 9036
(b)Waste/Barren Land (ha.) 1381
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2401
(e)Settlements (ha.) 1197
(f)Industrial (ha.) 130
(g)Forest (ha.) 839
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow land 11767
    Total (ha.) 26751
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.3605
(2.)Green belt0.817
(3.)Built Up Area2.7532
Total (ha.) 5.9307
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)ESZsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)WLSNA0NA
(5.)NPANA0NA
(6.)CorridorsNA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)OthersNANA0NA
(3.)ForestNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kadwa river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 50
(e)No. of working days 6
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.817
(b)Percentage of Total Project Area 34.61
(c)No. of Plants to be Planted 800
(d)Funds Allocated for Plantation 5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialIncrease in export, Local employment
(2.)SocialSocial upliftment through CER
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1720/ RA 0117 rev 01
(ii)Name of the EIA Consultant Aditya Environmental Services Pvt. Ltd.
(iii)Address 107, Hiren Light Industrial estate, Mogul Lane, Mahim- west, Mumbai
(iv)Mobile No. 9821513367
(v)Landline No. 0224212750
(vi)Email Id rajiv@aespl.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 24 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly refer to the observations made earlier. You were requested to provide the reply to the observations made but no reply was found with your application. Therefore, again it is requested to provided reply to the observation made for further consideration of the proposal. 30 Sep 2019
2.NAThe correction have been made as per the instruction received 31 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMilap Chand Bhatt Bhatt
DesignationDeputy Manager Liaison
Name of Company (Applicant Name should not be given here)MEGAFINE PHARMA PVT LTD
AddressSethna, 4th floor, 55 Maharshi Karve Road, Marine Lines, Mumbai- 400002