Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Change in plant configuration and expansion of Sinter Plant for sinter production from 64,000 TPA to 165,000 TPA and Pig Iron production from 83,200 TPA to 140,240 TPA by M/s Narsingh Ispat Ltd. at Vi
(b)Name of the Company / Organisation NARSINGH ISPAT LTD
(c)Registered Address Diamond Heritage, 15th Floor, R.No.1512, 16, Stand Road Kolkata, West bengal,,Kolkata,West Bengal-700001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay kumar Singh
(b)Designation (Owner/ Partner/ CEO) Authorized
(c)Address Narsingh Ispat Ltd, Village Khunti, Chowka Kandra Road, District Saraikela-kharsawan, Jharkhand,,,Seraikela Kharsawan,Jharkhand-832404
(d)Pin code 832404
(e)E-mail narsinghispat123@gmail.com
(f)STD Code. 6591(f)Telephone No. 244701
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/IND/118811/2019
(d)Master Proposal Number(Single Window) SW/118810/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot Nos. 2562 & Others, Khata No. 400 & Others
(b)Pincode 832401
(c)Bounded Latitudes (North)
From
Degree 22.940664
Minutes
Second
From
Degree 22.944222
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.966144
Minutes
Second
From
Degree 85.971941
Minutes
Second
(e)Survey of India Topo Sheet No. 73 F/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 210
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-265/09/EPE/1159
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 29 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Blast Furnace8320057040140240Tons per Annum(TPA)Road
(2.)Sinter Plant64000101000165000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Blast Furnace2x65m3Will be Upgraded to 2x79m32x79m3Expansion
(2.)Rolling Mill500 TPDTo Drop0Will not be installed
(3.)Sponge Iron6x100 TPDTo Drop0Will not be installed
(4.)Pallet Plant1000 TPDTo drop0Will not be installed
(5.)Sinter Plant1x200 TPD1x300 TPD1x200 TPD & 1x300 TPDExpansion
(6.)Steel Melting Shop2x25 Ton EAF – LRF-CCMTo drop0Will not be installed
(7.)WHRBWHRB-12 MW AFBC-38 MWWHRB-4 MWWHRB-4 MWReduced capacity
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Aug 2018
(iv)Valid Upto 30 Jun 2022
(v)File No. JSPCB/HO/RNC/CTO-2249897/2018/1369
(vi)Application No. --
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 352438
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 352438
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore63120Tons per AnnumDevkabai Velji, BarajamdaRoad135 Fuel Supply AgreementCopy of Linkage
(2.)Iron Ore fines132155Tons per AnnumDevkabai Velji, Barajamda, OMC, OrissaRoad150 LOACopy of Linkage
(3.)Coke91164Tons per AnnumImported, HaldiaRoad300 LOACopy of Linkage
(4.)coke Breeze13200Tons per AnnumKrishna Coke - CuttackRoad350 LinkageCopy of Linkage
(5.)Dolomite16500Tons per AnnumDurgapurRoad210 LinkageCopy of Linkage
(6.)Quartzite3300Tons per AnnumCBROS, ChandilRoad25 LOACopy of Linkage
(7.)Limestone33000Tons per AnnumImported, HaldiaRoad285 LinkageCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface8905Copy of Permission LetterPipelineOthersPipeline2/PMC-164/2007 (Part-VI)-44330 May 20137638.8
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DM Plant525Neutralization PitOthersSlag cooling & Dust supression50
(2.)Cooling Tower Blowdown5560Collection PitOthersSlag cooling & Dust supression550
(3.)Domestic Waste Water520Septic Tank with Soak PitGreen Belt Renewal Plant5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 65
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 65
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BF Granulated SlagOthersSlag64514Tons25RoadOthersSold to Cement Companies
(2.)APC DustOthersDust14024Tons0OthersIn HouseOthersReused in Sinter Plant
(3.)Sinter Plant WasteOthersWaste33000Tons0OthersIn houseOthersReused in Sinter Plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube43.0203.1546.1880
(2.)PM10Microgram per Meter Cube81.6804.3085.99100
(3.)PM2.5Microgram per Meter Cube27.4202.8230.2560
(4.)NOxMicrogram per Meter Cube45.8803.1949.0880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Sintering machine and Dedusting areaBF Gas302.75PM100.114
(2.)CPP (WHRB)BF Gas702PM100.111
(3.)Sinter StockDust302.5PM100.267
(4.)MBF StackBF Gas402PM100.066
(5.)Sintering Machine and Dedusting AreaBF Gas302.75PM100.114
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6000
(b)Source Captive Power Plant plus grid
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1x500 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 88.66
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 88.66
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 3548
(b)Waste/Barren Land (ha.) 13062
(c)Grazing/ Community Land (ha.) 1087
(d)Surface Water Bodies (ha.) 3265
(e)Settlements (ha.) 916
(f)Industrial (ha.) 262
(g)Forest (ha.) 9357
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Airport 0
    Total (ha.) 31497
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Plant Area88.66No additional land requirement for the project
Total (ha.) 88.66
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA0No ESZs within 10 km radius of Project site
(2.)CorridorsNA0No Migratory Corridors within 10 km radius of Project site
(3.)WLSNA0No WLS within 10 km radius of Project site
(4.)Critically Polluted AreaNA0No Critically Polluted area within 10 km radius of Project site
(5.)Wildlife CorridorsNA0No Wildlife corridors within 10 km radius of Project site
(6.)NPANA0No NPA within 10 km radius of Project site
(7.)ESAsNA0No ESAs within 10 km radius of Project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0No forest within 10 km radius of Project site
(2.)Defence InstallationsNA0No Defence Installation within 10 km radius of Project site
(3.)Archaeological SitesNA0No Archaeological sites within 10 km radius of Project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 88.66
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bamni River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 1100
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 50
(e)No. of working days 330
(f)Total Manpower 1200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt29.2029.2
(2.)Percentage of Total Project Area33033
(3.)No. of Plants13000013000
(4.)Funds Allocated220000002200000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe region shall also be benefited from the project as there will be direct and indirect employment of people in the Steel plant. Preference will be given to the people of the state possessing requisite skill and qualification criteria. Also there will be lot of scope for indirect employment of the people of the state in and around the project site
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 077
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address Plot No. 82-A, Sector - 5, IMT Manesar, Gurugram - 122051 (Haryana)
(iv)Mobile No. 9953147268
(v)Landline No. 0124434375
(vi)Email Id metallurgy@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1. Eds Raise LetterMay please see the attachment. 15 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay kumar Singh
DesignationAuthorized
Name of Company (Applicant Name should not be given here)NARSINGH ISPAT LTD
AddressDiamond Heritage, 15th Floor, R.No.1512, 16, Stand Road Kolkata, West bengal
Print