1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s MSP Sponge Iron ltd | (b)Name of the Company / Organisation | MSP SPONGE IRON | (c)Registered Address | Vill- Haldiaguna, PO-Gobardhan, Dist-Keonjhar,,Kendujhar,Orissa-758013 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Pradip Kumar Dey | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Vill-Haldiaguna, PO-Gobardhan, Dist-Keonjhar,,Kendujhar Sadar,Kendujhar,Orissa-758013 | (d)Pin code | 758013 | (e)E-mail | mspkjrodisha.moef@mspsteel.com | (f)STD Code. | 6766(f)Telephone No. | 256513 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/IND/118760/2019 | (d)Master Proposal Number(Single Window) | SW/118758/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 360,285,260,280,261,293,624,295,633,366,314,324,24 | (b)Pincode | 758013 | (c)Bounded Latitudes (North) | | From | | Degree | 214537.21 | Minutes | | Second | | From | | Degree | 214607.31 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 853444.85 | Minutes | | Second | | From | | Degree | 853445.85 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45N5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 426 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | MSP/01/2019-20 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 6 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | TMT, Rods, Structures | 42000 | 218000 | 260000 | Tons per Annum(TPA) | | Road | | (2.) | Sponge Iron | 54000 | 226000 | 280000 | Tons per Annum(TPA) | | Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | CPP - CFBC | 12 MW | 6 MW | 6 MW | 6 MW to be dropped | (2.) | Iron Ore Pellet | 2 x 6,00,000 TPA | 1 x 8,50,000 TPA | 8,50,000 TPA | Capacity to be reduced by 3,50,000 TPA | (3.) | Coal Beneficiation | 2 x 75 TPH | Nil | Nil | 2x75 TPH to be dropped | (4.) | Iron Ore Beneficiation | 10,00,000 TPA | Nil | 10,00,000 TPA | Commissioned | (5.) | MBF | 1 x 250 m2 , 30 TPH PCM | Nil | Nil | to be dropped | (6.) | IF with CCM | 3x5 T + 4x15 T | 1x8 T + 2x15 T+ 3x10 T + 2x5 T | 2x5 T +1x8 T+3x10 T+2x15 T | 1x5 T out of 3x5 T to be modified to 1x8 t and remaining 4x15 t to be changed to 3x10 T & 2x15 T | (7.) | Coal Gasification | 1x864 m3/hr + 8x2,850 m3/hr | Nil | 1x864 m3/hr + 8x2,850 m3/hr | | (8.) | DRi Kilns | 2x40 +2x50 TPD | 4x75 TPD + 1x500 TPD | 4x75 TPD + 1x500 TPD | Modification of 50 TPD & 40 TPD DRI Kilns and Installation of new 500 TPD DRI Kilns | (9.) | Sinter Plant | 1 x 36 m2 | Nil | Nil | to be dropped | (10.) | Rolling Mill | 1 x 42000 TPA | 1 x 2,18,000 TPA | 2,60,000 TPA | | (11.) | CPP-WHRB | 8 MW | 10 MW | 18 MW | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 Mar 2019 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 2662/IND-I-CON-2503 | (vi)Application No. | 2662/IND-I-CON-2503 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 573.41 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 24.28 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.55 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 4.85 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1587700 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1587700 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 1000000 | Tons per Annum | | OMC Gandhamardhan | Road | | 400 | Fuel Supply Agreement | | Copy of Linkage | (2.) | Imported Coal | 96000 | Tons per Annum | | SA coal via Paradeep port | Rail | | 230 | Others | invoice | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.4 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.52 To 4.1 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 5435 | 2.1 | Copy of Permission Letter | Pipeline | | Intake Well | | 016054/WR/WR-MAJII-WRC/0024/16 | 16 Jul 2019 | 1580 | (2.) | GroundWater | | 2000 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4(96)/SER/CGWA/2008-64 | 14 Mar 2019 | 2000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 70 | 100 | STP | Green Belt Renewal Plant | | 70 | | (2.) | Industrial | 1350 | 1500 | ETP | Reuse within the Plant & Recycling | | 1350 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1420 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1420 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | SMS slag | Industrial Waste | | 39600 | Tons | 3 | Road | | Others | Construction Work | (2.) | Tailing | Industrial Waste | | 150000 | Tons | 0 | Road | | Others | Stored inside the plant | (3.) | Pellet dust | Industrial Waste | | 27500 | Tons | 0 | Road | | Co-Processing | | (4.) | Coal gasifier ash | Industrial Waste | | 20000 | Tons | 0 | Road | | Authorized Recyclers | | (5.) | Char | Industrial Waste | | 56000 | Tons | 0 | Conveyor Belt | | Co-Processing | | (6.) | DRI dust + Accreation | Industrial Waste | | 82000 | Tons | 0 | Others | inside plant | Sanitary Landfills | | (7.) | CPP - Ash | Fly Ash | | 40480 | Tons | 1.2 | Road | | Authorized Recyclers | | (8.) | SMS Dust | Industrial Waste | | 19800 | Tons | 0 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 45.1 | 2.91 | 3.36 | 48.47 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 7.6 | 2.91 | 6.0 | 13.61 | 80 | (3.) | NOx | | Microgram per Meter Cube | 13.1 | 2.91 | 0 | 13.11 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 68.3 | 2.91 | 6 | 74.31 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1x500 TPD DRI | Coal | 50 | 2.2 | SO2 | | 5.8 | (2.) | 6 MW CPP | Coal | 40 | 1.2 | PM10 | | 0.51 | (3.) | 6 MW CPP | Coal | 40 | 1.2 | SO2 | | 6.5 | (4.) | 1 x 500 TPD DRI | Coal | 50 | 2.2 | PM10 | | 1.73 | (5.) | 1x500 TPD DRI | Coal | 20 | 2.2 | Others | PM2.5 | 1.03 | (6.) | Rotary cooler | Nil | 30 | 1.2 | PM10 | | 0.22 | (7.) | Rotary cooler | Nil | 30 | 1.2 | Others | PM2.5 | 0.132 | (8.) | Rotary coller of 4x75 TPD DRI | Nil | 30 | 0.7 | PM10 | | 0.14 | (9.) | Rotary coolers of 4x75 TPD DRI Kiln | Nil | 30 | 0.7 | Others | PM2.5 | 0.084 | (10.) | RMHP -DRI | Nil | 30 | 1.5 | PM10 | | 0.33 | (11.) | 1x8 T + 1x10 T | Electricity | 30 | 1 | PM10 | | 0.14 | (12.) | 1x8 T + 1x10 T IF | Electricity | 30 | 1 | Others | PM2.5 | 0.084 | (13.) | 2x10 T IF | Electricity | 30 | 1.2 | PM10 | | 0.16 | (14.) | 2x15 T IF | Electricity | 30 | 1.2 | PM10 | | 0.23 | (15.) | 2x15 T IF | Electricity | 30 | 1.2 | Others | PM 2.5 | 0.138 | (16.) | 6 MW CPP | Coal | 40 | 1.2 | Others | PM2.5 | 0.30 | (17.) | Pellet plant | Coal | 38 | 1.8 | PM10 | | 1.1 | (18.) | Pellet Plant | Coal | 38 | 1.8 | Others | PM2.5 | 0.66 | (19.) | 4x75 TPD DRI | Coal | 30 | 1.2 | PM10 | | 1.04 | (20.) | 4x75 TPD DRI | Coal | 30 | 1.2 | Others | PM2.5 | 0.624 | (21.) | RMHP- DRI | Nil | 30 | 1.5 | Others | PM2.5 | 0.198 | (22.) | 2x15 T IF | Electricity | 30 | 0.8 | PM10 | | 0.07 | (23.) | 2x15 T | Electricity | 30 | 0.8 | Others | Pm2.5 | 0.042 | (24.) | 2x10 T IF | Electricity | 30 | 1.2 | Others | PM2.5 | 0.096 | (25.) | Pellet plant | Coal | 38 | 1.8 | SO2 | | 4.4 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 37.7 | (b)Source | NESCO | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 200 KVA | (e)Stack Height (in m) | 3 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 30.25 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 30.25 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 19860.05 | (b)Waste/Barren Land (ha.) | 1882.4 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1287.66 | (e)Settlements (ha.) | 2581.87 | (f)Industrial (ha.) | 188.79 | (g)Forest (ha.) | 7264.04 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 33064.8100 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 9.71 | | (2.) | Green belt | | 9.99 | | (3.) | Area for Solid Waste Management | | 3.38 | | (4.) | Water Reservoir | | 2.83 | | (5.) | Built Up Area | | 0.60 | | (6.) | Others | Raw material storage | 3.74 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | Not found | (2.) | WLS | NA | 0 | Not found | (3.) | NPA | NA | 0 | Not found | (4.) | ESAs | NA | 0 | Not found | (5.) | ESZs | NA | 0 | Not found | (6.) | Corridors | NA | 0 | Not found | (7.) | Wildlife Corridors | NA | 0 | Not found | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Gualdih | 3.96 | open forest | (2.) | Archaeological Sites | | NA | 0 | Not Found | (3.) | Defence Installations | | NA | 0 | Not Found | (4.) | Others | Forest | Kendujhar - Saranda range | 8.9 | open forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 30.25 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ardei river | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 2.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 500 | (b)Permanent Employment-During Operation | 294 | (c)Temporary Employment- During Construction | 670 | (d)Temporary Employment- During Operation | 336 | (e)No. of working days | 360 | (f)Total Manpower | 1800 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 10.09 | 0 | 10.09 | (2.) | Percentage of Total Project Area | 33.3 | 0 | 33.3 | (3.) | No. of Plants | 19074 | 0 | 19074 | (4.) | Funds Allocated | 2193510 | 0 | 2193510 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Green belt development, RWH pond | (2.) | Social | Employment generation, Infrastructure Development, Upliftment in Livelihood | (3.) | Financial | Revenue Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 7 | (ii)Name of the EIA Consultant | Global tech Enviro Experts Pvt Ltd | (iii)Address | C-23, BJB Nagar , Bhubaneswar | (iv)Mobile No. | 9437033487 | (v)Landline No. | 0674243685 | (vi)Email Id | globalexperts@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 14 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | Eds Raise Letter | May please see the attached document | 15 Oct 2019 | 2. | NA | The correction have been made as per the instruction received | 14 Jul 2020 | 3. | NA | It is to inform that instant proposal will not fall under clause 7(ii) of EIA, 2006 as the validity of the existing EC dated 10/10/2012 has already been expired on 9/10/2019.
In view of this, PP may apply for fresh ToR under EIA, 2006 for the proposed modernization/expansion activity.
Further, it is also informed that cover letter of September, 2019 is being uploaded on July, 2020 without making any reference to EDS raised on 15/10/2019. In addition to this, same proposal is being uploaded with different proposal nos which shall be avoided. | 15 Jul 2020 | 4. | NA | The correction have been made as per the instruction received | 14 Dec 2020 | 5. | NA | Your proposal is rejected due to the following:
i. EC validity extension has not been applied as per the provisions of EIA Notification, 2006. i.e. within 90 days after the validity period of EC.
As EC validity has already been expired, only implemented part of the project will have perpetual validity. | 18 Dec 2020 | 6. | Eds Reply Letter | The correction have been made as per the instruction received | 13 Jan 2021 | 7. | NA | May please see the MoM of EAC (Industry1) held during 26-28th August, 2020 wherein the similar proposal submitted by M/s. MSP Sponge Iron Limited was deliberated and EAC recommended to reject the proposal as the instant proposal does not qualify under para 7(ii) of EIA Notification, 2006. | 15 Jan 2021 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Pradip Kumar Dey | Designation | Director | Name of Company (Applicant Name should not be given here) | MSP SPONGE IRON | Address | Vill- Haldiaguna, PO-Gobardhan, Dist-Keonjhar |
|