Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion Project for Manufacturing of Ethyl Chloride (From Ethyl Alcohol), Ethyl Chloride (From Mixed Solvent of Existing Process), Methyl Chloride (From Methyl Alcohol) & Hydroxy
(b)Name of the Company / Organisation ASHA CELLULOSE PRIVATE LIMITED
(c)Registered Address Asha House, 808/C, Dr. B.A. Road, Dadar T.T., Mumbai.,,Mumbai City,Maharashtra-400014
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant K Srinivas
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address S.No. 303/2, 302/P, 273/2, 275/1, Near Water Works, Abrama, Valsad.,,Valsad,Valsad,Gujarat-396001
(d)Pin code 396001
(e)E-mail srini@ashacel.com
(f)STD Code. 2632(f)Telephone No. 253665
(g)Fax No. 227019
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/118582/2019
(d)Master Proposal Number(Single Window) SW/118568/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S. No. 302/P, 303/2, 273/2, 275/1
(b)Pincode 396001
(c)Bounded Latitudes (North)
From
Degree 20.5924
Minutes
Second
From
Degree 20.5956
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.9607
Minutes
Second
From
Degree 72.9616
Minutes
Second
(e)Survey of India Topo Sheet No. F43S14 & F43T2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 18
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSolapurMoholWatwate
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/316/2011-IA II (I)
(c)Date of Issue of TOR 18 Mar 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 11 Dec 2019
(c)Date of Issue of EC 23 Sep 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :1.25
Shri Saurashtra Kadva Patidar Seva Samaj, Dharampur Chokdi, N.H. 48, Valsad, District - Valsad
State :Gujarat
District :Valsad
Tehsil :Valsad
Village :Abrama
112Clarification regarding water usage and waste water disposal, issues regarding Air EmissionDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-9/2016(ENV)/674
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 27 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethyl Cellulose20020OthersTPMRoad
(2.)Ethyl Chloride (from Alcohol)0322322OthersTPMRoad
(3.)Ethyl Cellulose (Solvent Process)31.72031.72OthersTPMRoad
(4.)Methyl Chloride0250250OthersTPMRoad
(5.)Hydroxy Propyl Methyl Cellulose0200200OthersTPMRoad
(6.)Ethyl Cellulose Aqueous- Non plasticized20.124020.124OthersTPMRoad
(7.)Ethyl Cellulose Aqueous Dispersion-Plasticized24.70024.7OthersTPMRoad
(8.)Ethyl Chloride(From existing mix solvent)0160160OthersTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Chilling plant, TR140100240
(2.)Cooling Tower, TR400300700
(3.)Steam Boiler (TPH)303
(4.)Thermopak (lakhs k cal/h)066
(5.)Hot Air Generator (lakhs k cal/h)066
(6.)Steam Boiler(TPH)03.53.5
(7.)Hot Air Generator (lakhs k cal/h)606
(8.)Hot Air Generator (lakhs k cal/h)606
(9.)D G set (kVA)1100110
(10.)D G set (kVA)35035
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Jul 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. AWH-87084
(vi)Application No. 122307
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 30.5427
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.025
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2571.12
(b)Existing quantity of raw material/fuel 420.18
(c)Total quantity of raw material/fuel 2991.2999999999997
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Furnace Oil315Otherskg/hLocal MarketRoad10 LinkageCopy of Linkage
(2.)HSD Fuel60Otherskg/hLocal MarketRoad10 LinkageCopy of Linkage
(3.)Natural Gas515OthersSCM/hGujarat Gas LimitedPipe Conveyor100 LinkageCopy of Linkage
(4.)Coal as a Fuel for Boiler510Otherskg/hLocal MarketRoad10 LinkageCopy of Linkage
(5.)Other Raw material2991.3OthersTon/MLocal MarketRoad10 LinkageCopy of Linkage
(6.)Caustic Flakes163.6OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(7.)Ethyl Chloride142.2OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(8.)Acetic Acid19.2OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(9.)Toluene13OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(10.)Plasticizer – Dibutyl Sebacate1.3OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(11.)Oleic Acid1.04OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(12.)Wood Pulp177.82OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(13.)Cetyl Alcohol Powder0.62OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(14.)LDO120Otherskg/hLocal MarketRoad10 LinkageCopy of Linkage
(15.)SDS6.24OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(16.)Sodium Lauryl Sulfate – Powder0.31OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(17.)Ammonium hydroxide1.3OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(18.)Ethyl cellulose10.4OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
(19.)Solvent (Ethylene Dichloride, Acetone and Methylene Dichloride) (Fresh) (Recovered)17.97OthersTon/MLocal MarketRoad100 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube17.88.613.8880
(2.)PM2.5Micro Gram per Meter Cube48.432.143.82560
(3.)NOxMicro Gram per Meter Cube23.613.619.1880
(4.)PM10Micro Gram per Meter Cube87.362.580.625100
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH unit7.567.1477
(2.)Total Hardnessmg/l467363200600
(3.)Chloridesmg/l2861862501000
(4.)Fluoridemg/l0.70.311.5
(5.)Heavy MetalsZincmg/l0.170.10515
(6.)TSSmg/l1.91.91.91.9
(7.)TDSmg/l8436645002000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.24.7C
(2.)BODmg/l63C
(3.)CODmg/l1812C
(4.)pHOtherspH Unit7.787.25C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.853.675
(2.)Leq(Night)A-weighted decibels(dB(A))62.34570
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH unit7.597.38
(2.)Electric ConductivityOthersdS/m21.11
(3.)K(Potassium)Milliequivalents per 100 Gram1.71.2
(4.)N(Nitrogen)Percent0.0730.052
(5.)P(Phosphorus)Othersmg/100g18.716.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater244.90.5Copy of Permission LetterPipelineOthersBore well21-4(928)/WCR/CGWA/2011-344619 Apr 201252.7
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Effluent216.05220ETP,RO,MEEReuse within the Plant & Recycling,Othersreused in process207.58.55
(2.)Domestic waste water22Septic tankOthersseptic tank02
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 218.05
(b)Total Discharged Water (Kilolitre per Day) 10.55
(c)Total Reused Water (Kilolitre per Day) 207.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Salt from processHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1703Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)MEE wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)948Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Mixed solvent from processHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1787.44Tons2RoadCo-Processing
(4.)Mixed solvent from the processHazardous Waste (as per Hazardous and Other Waste Management rules 2016)61.9Tons10RoadOthersto actual diatillator
(5.)Distillation residue/& laboratory organic wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4.22Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spent filter cloth and filter materialHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Spent carbon from ETP & chimneyHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Weak caustic solutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4430.4Tons10RoadAuthorized Recyclers
(9.)Dust from Air filtration systemHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.22Tons10RoadOthersRecycled in process
(10.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.11Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(11.)Discarded Container/bagHazardous Waste (as per Hazardous and Other Waste Management rules 2016)62Tons20RoadAuthorized Recyclers
(12.)ETP wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)130Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)Spent resins from DM plantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.2Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(14.)Fly ashOthers-179Tons10RoadOthersTo brick manufacturer
(15.)Off-specification material & floor sweepingHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)Used hot and cold insulation materialHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.6Tons134RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube8701.1488.15100
(2.)SO2Microgram per Meter Cube17.701.8319.5480
(3.)NOxMicrogram per Meter Cube23.401.7025.280
(4.)PM10Microgram per Meter Cube8701.1488.15100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)ThermopakFO150.4SO20.10
(2.)Hot Air GeneratorLDO110.2SO20.03
(3.)Steam BoilerCoal150.9PM100.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source Dakshin Gujarat Veej Co. Ltd.
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 nos. of D G Set (110 kVA & 35 kVA)
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.1874
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.1874
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11698
(b)Waste/Barren Land (ha.) 1566
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 5138
(e)Settlements (ha.) 4950
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : range land 8998
    Total (ha.) 32350
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.3220
(2.)Built Up Area0.3804
(3.)Area for Solid Waste Management0.1035
(4.)Green belt1.0125
(5.)OthersOpen area and road1.3690
Total (ha.) 3.1874
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None within 10 km radius
(2.)Critically Polluted AreaNone0None within 10 km radius
(3.)WLSNone0None within 10 km radius
(4.)ESAsNone0None within 10 km radius
(5.)ESZsNone0None within 10 km radius
(6.)CorridorsNone0None within 10 km radius
(7.)Wildlife CorridorsNone0None within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None within 10 km radius
(2.)Defence InstallationsNone0None within 10 km radius
(3.)ForestNone0None within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.1874
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus,Glaucidium radiatum
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Yes
(iii)Period of Implementation After Approval from DFO
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area River Auranga at 0.24 km in N
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arabian Sea
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 9.18
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 315
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.63250.38001.0125
(2.)Percentage of Total Project Area19.8411.9231.759999999999998
(3.)No. of Plants10546301684
(4.)Funds Allocated5510
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialPresently there are 110 Nos. of employees. There will be additional 50 Nos. of employees, thus total 160 Nos. of employees after expansion during operational phase.
(2.)FinancialThe project would increase the overall export and also increase the foreign revenue.
(3.)EnvironmentalTotal 10,125 m2 of greenbelt will be developed after proposed expansion.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Water Act
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 085
(ii)Name of the EIA Consultant ECO CHEM SALES & SERVICES
(iii)Address Office Floor, Ashoka Pavilion - A New Civil Road, Surat, 395001
(iv)Mobile No. 9825123805
(v)Landline No. 2612231630
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 20 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly peruse the Certified Compliance report submitted by Regional Officer, Bhopal on the compliance status of your project. There are several observations made by the Regional Officer. Therefore, you are requested to submit the action taken report on the observation made by regional office for further consideration of the proposal 30 Sep 2019
2.NAThe correction have been made as per the instruction received 21 Oct 2019
3.NA(i) It is noted that there are various deficiencies in Form 2 (viz. S. no. 8, 13.1, 32 etc.) uploaded by the PP and accordingly Revised Form 2 shall be submitted incorporating all the information related to the project. (ii) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised. (iii) As per EIA Report schedule I species reported. Please submit approval status of conservation plan for Schedule I species along with budgetary provisions and its approval from CWLW needs to be provided. (iv) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted. (v) Details of show cause notice and other violations, if any, needs to be submitted. (vi) Incremental GLC values in the EIA/Form 2 were reported and needs to be confirmed/rechecked. (vii) Accurate water balance with details of total water and fresh water requirement, and permission/MoU/NOC from concerned regulatory authority needs to be submitted. (viii) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (ix) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted. (x) Action Plan for non-compliance of earlier EC conditions needs to be submitted. (xi) PP need to upload the legible documents on parivesh portal (xii) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (xiii) Issues raised during public hearing, response by the project proponent, action plan with budgetary allocation. Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. 05 Dec 2019
4.NAThe correction have been made as per the instruction received 11 Dec 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe request you to kindly consider our submission and issue Environmental Clearance. 26 Jun 2020
2.NA

The EAC, after detailed deliberations decided to defer the proposal for requisite information/inputs

06 Feb 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantK Srinivas
DesignationDirector
Name of Company (Applicant Name should not be given here)ASHA CELLULOSE PRIVATE LIMITED
AddressAsha House, 808/C, Dr. B.A. Road, Dadar T.T., Mumbai.
Print