Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Jakraya Sugar Ltd.
(b)Name of the Company / Organisation JAKRAYA SUGAR LIMITED JSL
(c)Registered Address Chelekar Galli, Mangalwedha, Dist. Solapur,,Solapur,Maharashtra-413305
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sachin B Jadhav
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address A/P - Watwate, Tal. Mohol, Dist. Solapur,,Mohol,Solapur,Maharashtra-413253
(d)Pin code 413253
(e)E-mail Jsldistillery1@gmail.com
(f)STD Code. 2188(f)Telephone No. 221173
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/118448/2012
(d)Master Proposal Number(Single Window) SW/194247/2021
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gat No. 61/A, 70,71,72,73,74 A/P - Watwate. Tal. M
(b)Pincode 413253
(c)Bounded Latitudes (North)
From
Degree 173428.67
Minutes
Second
From
Degree 17343.92
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 753852.16
Minutes
Second
From
Degree 75391.77
Minutes
Second
(e)Survey of India Topo Sheet No. 47O10, 47O11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 459
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/314/2012-IA II (I)
(c)Date of Issue of TOR 01 Jan 1900
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 20 Sep 2019
(c)Date of Issue of EC 14 Jul 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0
Jakraya Sugar Ltd., Watwate
State :Maharashtra
District :Solapur
Tehsil :Mohol
Village :Watwate
141No issues were raised during Public HearingDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. F. No.5-97/2015(ENV)/5412
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 4 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Molasses588031209000OthersMT/MRoad
(2.)Pressmud588031209000OthersMT/MOthersExisting Sugar factory
(3.)Electricity111930Mega Watt(MW)OthersCPP
(4.)RS/ENA90051006000OthersKL/MRoad,OthersCPP
(5.)Sugar17640936027000OthersMT/MRoad
(6.)Bagasse441002340067500OthersMT/MOthersExisting Sugar factory
(7.)Potash rich Powder040204020OthersMT/MRoad,OthersCPP
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery (Molasses/Sugarcanejuice based)30 KLPD170 KLPD200 KLPD
(2.)Sugar Factory4900 TCD2600 TCD7500 TCD
(3.)Co-Gen Plant11 MW19 MW30 MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Aug 2016
(iv)Valid Upto 31 Jul 2020
(v)File No. BO/CAC-CELL/UAN No. 0000010587 & 0000030120
(vi)Application No. UAN No. 0000010587 & 0000030120
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 141
(b) Funds Allocated for Environment Management (Capital) (in Crores) 29.75
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 350
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2600
(b)Existing quantity of raw material/fuel 4900
(c)Total quantity of raw material/fuel 7500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses as raw material for distillery244530Tons per AnnumOwn Sugar factory & Outside industryRoad35 Open MarketCopy of Linkage
(2.)Sugarcane Juice2857OthersMT/DNearby farmsRoad35 Open MarketCopy of Linkage
(3.)Sugar cane1350000Tons per AnnumNearby farmsRoad35 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube63.9455.1163.11100
(2.)OthersCOMili Gram per Meter Cube0.150.040.102 (8 Hrs)
(3.)PM2.5Micro Gram per Meter Cube26.0216.5423.8860
(4.)SO2Micro Gram per Meter Cube29.9815.7725.4180
(5.)NOxMicro Gram per Meter Cube33.0424.4432.0280
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l311.59164.07200600
(2.)pHOthers-7.867.656.58.5
(3.)Chloridesmg/l255.91145.682501000
(4.)TSSmg/l71.3932.51100100
(5.)TDSmg/l822.40339.895002000
(6.)Fluoridemg/l1.120.1211.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l51.449.47E
(2.)DOmg/l3.40.15E
(3.)pHNA8.207.50E
(4.)CODmg/l135.8725.96E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.349.875
(2.)Leq(Night)A-weighted decibels(dB(A))62.342.070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.847.49
(2.)K(Potassium)Milligram per Kilogram328.8207.2
(3.)N(Nitrogen)Milligram per Kilogram471.3309.1
(4.)Electric ConductivityMillisiemens per Centimetre1636.62862.68
(5.)P(Phosphorus)Milligram per Kilogram100.660.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.78 To 22.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.0 To 5.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5523.40Copy of Permission LetterPipelineJack Well955817 Nov 2006606
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Distillery - Raw spentwash16001700Concentrated in MEE followed by drying to Powder in Spray dryerOthersSold in Market16000
(2.)Distillery - Other effluent16611700Treated in proposed CPUReuse within the Plant & Recycling1661
(3.)Domestic Effluent70100Treated in proposed STPReuse within the Plant & Recycling70
(4.)Sugar & Co-gen effluent788.51000Primary, Secondary & Tertiary treatmentReuse within the Plant & Recycling788.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4119.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4119.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Yeast SludgeIndustrial Waste10890Tons5RoadOthersUsed as manure
(2.)ETP SludgeIndustrial Waste46.8Tons6RoadOthersUsed as manure
(3.)CPU SludgeIndustrial Waste108.9Tons5RoadOthersUsed as manure
(4.)Boiler AshOthersBagasse & Coal ash6090Tons0.5RoadOthersGiven to brick manufacturers or manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube63.111.00.1063.211100
(2.)PM2.5Microgram per Meter Cube22.911.00.1023.10060
(3.)SO2Microgram per Meter Cube24.41.0428.44180
(4.)NOxMicrogram per Meter Cube32.021.0133.02180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBagasse/Coal724.2SO224.44
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 7500
(b)Source Own Co-gen Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Two sets of 625 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 22.51
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 22.51
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1.412
(b)Waste/Barren Land (ha.) 0.8319
(c)Grazing/ Community Land (ha.) 0.7932
(d)Surface Water Bodies (ha.) 0.0481
(e)Settlements (ha.) 0.0563
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 3.1414999999999997
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area5.21
(2.)Green belt7.51
(3.)OthersOpen space9.79
Total (ha.) 22.51
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0There is no presence of ESA's in 10 Km radius of Project
(2.)ESZsNA0There is no presence of ESZs in 10 Km radius of Project
(3.)Critically Polluted AreaNA0There is no presence of CPA in 10 Km radius of Project
(4.)NPANA0There is no presence of NPA in 10 Km radius of Project
(5.)WLSGIBWLS4.70NBWL Clearance required
(6.)CorridorsNA0There is no presence of Corridors in 10 Km radius of Project
(7.)Wildlife CorridorsNA0There is no presence of Wildlife Corridors in 10 Km radius of Project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0There is no presence of Defense installations in 10 Km radius of Project
(2.)Archaeological SitesNA0There is no presense of Archaeological site in 10 Km radius of Project
(3.)ForestNA0There is no presence of forest land in 10 Km radius of Project
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Selec
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Red Necked Falcon, Black Buck, Indian python, Indian Monitor Lizard, Indian Peafowl.
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Bhima river (3.40 Km from site)
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 506
(e)No. of working days 330
(f)Total Manpower 536
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt73200190075100
(2.)Percentage of Total Project Area32.50.8433.34
(3.)No. of Plants1089460011494
(4.)Funds Allocated250000025000005000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1. Employment generation 2. Improvement in the Physical & Social Infrastructure 3. Upliftment of local peoples.
(2.)Financial1. The community that resides in the nearby areas will be benefited directly or indirectly by this project 2. After establishment, the industry will meet the national interest of economical growth through sustainable development, as alcohol has been a great source of revenue through excise duty levied by the Government.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0135
(ii)Name of the EIA Consultant Equinox Environments India Private Limited.
(iii)Address F-11, Namdev nest, 1160 B 'E' ward, Sykes extension, opposite Kamala college, Kolhapur, 416001
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of compliance against ADS saught by MS for EC of JSL. 01 Mar 2020
2.NA

The EAC, after detailed deliberations has asked for clarification/inputs, in respect of the following:-

 