Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Basundhara (West) Extension OCP
(b)Name of the Company / Organisation BASUNDHARA (WEST) EXTENSION OCP MAHANADI COALFIELDS LIMITED
(c)Registered Address O/o Project Officer, Basundhara (West) Extension OCP, Basundhara Area, MCL, At/PO Basundhara, Dist-Sundergarh, Odisha-770076,,Sundargarh,Orissa-770076
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajiv Kumar
(b)Designation (Owner/ Partner/ CEO) ProjectOfficer
(c)Address O/o Project Officer, Basundhara West Extension OCP, Basundhara Area, MCL, At/PO Basundhara, Dist-Sundergarh, Odisha-770076,,Hemgir,Sundargarh,Orissa-770076
(d)Pin code 770076
(e)E-mail basundhara.w.extension@gmail.com
(f)STD Code. 6621(f)Telephone No. 286135
(g)Fax No. 286144
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity7(h) Common Effluent Treatment Plants (CETPs)
(b)Category A
(c)Proposal Number IA/OR/CMIN/63468/2017
(d)Master Proposal Number(Single Window) SW/118265/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Basundhara (W) Extn. OCP, C/O General Manager, Bas
(b)Pincode 770076
(c)Bounded Latitudes (North)
From
Degree 220341.14
Minutes
Second
From
Degree 220441.75
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 834022.90
Minutes
Second
From
Degree 834218.75
Minutes
Second
(e)Survey of India Topo Sheet No. 64 N/12 (RF 1: 50000)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 311
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 311
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhHemgir
(2.)OrissaSundargarhHemgirTelendih and Ratansara
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/26/2017-IA-II(M)
(b)Date of Apply of TOR 31 Mar 2017
(c)Date of Issue of TOR / Standard ToR 02 Feb 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :4
Stadium Field near Jagannath Temple
State :Orissa
District :Sundargarh
Tehsil :Hemgir
Village :Tiklipada
400Issues were regarding employment,compensation payment ,dust and water pollution.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Opencast Coal Mining8.75
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal8.75OthersMTPARoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 613.87
(b) Funds Allocated for Environment Management (Capital) (in Crores) 93.37
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.78
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.54
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 47.94
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 47.94
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fuel Energy47.94Kilo Litre per DayLocalRoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Nov 2017 To 03 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube57.8024.7755.660
(2.)OthersNANA0000
(3.)NOxMicro Gram per Meter Cube34.8911.8032.5980/120
(4.)PM10Micro Gram per Meter Cube98.5460.6591.45100/250
(5.)SO2Micro Gram per Meter Cube21.718.4020.0780/120
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.570.0911.5
(2.)Heavy MetalsCadmiummg/l0.0010.0010.0030.003
(3.)Chloridesmg/l52202501000
(4.)pHNA7.066.846.58.5
(5.)TDSmg/l2051645002000
(6.)Total Hardnessmg/l168140200600
(7.)OthersNANA0000
(8.)TSSmg/l00100100
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.066.84C
(2.)DOmg/l5.54.9C
(3.)BODmg/l22C
(4.)OthersTSSmg/l37.610.8C
(5.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.751.275
(2.)Leq(Night)A-weighted decibels(dB(A))44.841.570
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers1:2.5/w:v7.76.89
(2.)Electric ConductivityOthersmicroS/cm183100
(3.)N(Nitrogen)Kilogram per hectare16782
(4.)P(Phosphorus)Kilogram per hectare13.43.56
(5.)K(Potassium)Kilogram per hectare19548
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.83 To 6.27
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.56 To 4.57
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/2296/OR/MIN/2019
(f)Date of Issue 09 Aug 2019
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine Water20100Copy of Permission LetterPipelineOthersPumpingNA17 Sep 20192010
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop190200ETPReuse within the Plant & Recycling190
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 190
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 190
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Internal OB DumpIndustrial Waste89560000Kilolitre0RoadOthersBackfilling
(2.)Internal OB DumpIndustrial Waste7660000Kilolitre0RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube0000.0000001120
(2.)PM2.5Microgram per Meter Cube56.7003.3660.10
(3.)PM10Microgram per Meter Cube98.42021.59120.02250
(4.)NOxMicrogram per Meter Cube0000.0000001120
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 52.51
(b)Source 33/6.6 kV substation of Basundhara (West) Expn. OC
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 227.62
(b)Private Land (ha.) 0
(c)Government Land (ha.) 96.30
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 323.92
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 51.29
(b)Waste/Barren Land (ha.) 45.01
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 227.62
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 323.92
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area299.87
(2.)OB Dump Area0
(3.)Safety Zone6.48
(4.)OthersInfrastructure17.57
(5.)Main Plant0
(6.)Township0
(7.)Green belt0
(8.)Ash Pond0
(9.)Tailing Pond0
(10.)LandFill0
(11.)Water Reservoir0
(12.)Desalination Plant0
(13.)Area for Solid Waste Management0
Total (ha.) 323.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)ESZsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)ForestJamkani Reserve Forest1.75North of the Project
(4.)OthersReserve ForestGarjanpahar4.9South of the Project
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 323.92
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 2
(b)No. of Households 222
(c)No. of PDFs (Project Displaced Families) 222
(d)No. of PAFs (Project Affected Families) 222
(e)Funds Allocated for R&R(in INR) (in Lacs) 7143
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Basundhara River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 854
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 854
32.
Green Belt in Ha:
(a)Total Area of Green Belt 6.48
(b)Percentage of Total Project Area 1.75
(c)No. of Plants to be Planted 16200
(d)Funds Allocated for Plantation 64.80
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialImprovement in physical & social infrastructure, increment in employment potential & improvement &availability of 24 X 7 electricity in rural areas.
(2.)EnvironmentalPost mining enhancement of green cover.
(3.)FinancialContribution to exchequer (State & Centre).
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 8.75 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 34012/04/2011-CPAM
(b)Date of Approval 22 Mar 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 323.92
(f)Approved Capacity 8.75
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 101.06
(b)Mineable Reserves (Million Ton) 92.73
(c)Extractable Reserves(Million Ton) 92.73
(d)Percent(%) of Extraction 91.76
(e)Grade of Coal /Ore /Mineral G 12
(f)Stripping Ratio 1.05 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 3-8 degree
(i)Mining Method Opencast
(j)Life of Mine (Years) 12
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 6
(c)Thickness of seams to be worked on 6
(d)Maximum Thickness of Seams (metres) 15
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 323.92
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Acquired Under CBA (A&D) Act 1957
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Acquired Under CBA (A&D) Act 1957
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Acquired Under CBA (A&D) Act 1957
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 2.95
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 2.95
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 130.64 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 299.87
13.
Details of Transportation:
(a)In Pit/Underground to Surface By Dumper
(b)Surface to Siding/Loading By Road
(c)Transportation / Conveyor Details 100% by Road & Rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND51.29051.29
(2.)SURFACE WATER BODIES000
(3.)FOREST LAND227.620227.62
(4.)SETTLEMENTS000
(5.)GRAZING LAND000
(6.)WASTE LAND45.0145.8590.86
(7.)OTHERS(Specify)NA000
TOTAL323.9245.85369.77
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY169.23130.640299.87
(2.)BUILT UP AREA (COLONY/OFFICE)17.570017.57
(3.)GREEN BELT6.48006.48
(4.)OtherRehabilitation site0045.8545.85
(5.)TOP SOIL STORAGE0000
(6.)INTERNAL OB DUMPS0000
(7.)ROADS0000
(8.)VIRGIN AREA0000
(9.)EXTERNAL OB DUMPS0000
TOTAL193.28130.6445.850369.77
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 192.40
(c)Quarry(in hectare) 299.87
(d)Safety Zone(in hectare) 6.48
(e)Final Void of 130.64 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 17.57
(h)Total afforestation plant (in hectare) 201.57
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2019008.7500
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0092
(ii)Name of the EIA Consultant Central Mine Planning & Design Institute
(iii)Address Gondwana Place, Kanke Road, Ranchi, Jharkhand-834031
(iv)Mobile No. 8987788797
(v)Landline No. 0651223005
(vi)Email Id gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAKindly clarify and submit the following: a. Status of Stage-I FC of 227.6 ha b. Details of OB Management to be filled in Form# 2 in Sr. No. 35(9) and 35(11). c. Compliance of ToR conditions points wise shall be included in EIA report d. Authorization letter is not submitted in Form# 2 e. Action point of issues raised in PH with fund allocation and timeframe f. Attendance sheet of PH shows only 19 nos of signature however in form# 2 it is stated that 400 nos of people attended. 05 Nov 2019
2.NAThe correction have been made as per the instruction received 02 Jan 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajiv Kumar
DesignationProjectOfficer
Name of Company (Applicant Name should not be given here)BASUNDHARA (WEST) EXTENSION OCP MAHANADI COALFIELDS LIMITED
AddressO/o Project Officer, Basundhara (West) Extension OCP, Basundhara Area, MCL, At/PO Basundhara, Dist-Sundergarh, Odisha-770076