Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Establishment of Synthetic Organic Chemicals (Bulk Drug and Intermediates) manufacturing unit by Lakshmi Pharmachem
(b)Name of the Company / Organisation M/S. LAKSHMI PHARMACHEM
(c)Registered Address Sy.No's.219-1A,219-2A &221-1,kakarla Gramapanchayati,Tiruvuru mandal,krishna district,A.P.,,Krishna,Andhra Pradesh-521227
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ramakrishna N
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address 64-9-5A,Flat No.303,Sree Bhaskara Residency,Chennupati Ramakotaiah Street,Patamata Lanka,Vijayawada,,Tiruvuru,Krishna,Andhra Pradesh-520010
(d)Pin code 520010
(e)E-mail namalaramakrishna61@gmail.com
(f)STD Code. 40(f)Telephone No. 23748555
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/73243/2018
(d)Master Proposal Number(Single Window) SW/117724/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. Nos. 219/1(Part), 219/2(Part) and 221(Part)
(b)Pincode 521227
(c)Bounded Latitudes (North)
From
Degree 17.033247
Minutes
Second
From
Degree 17.033806
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.371332
Minutes
Second
From
Degree 80.371777
Minutes
Second
(e)Survey of India Topo Sheet No. E44O12 E44U9 (65C12 65D9)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 110
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 110
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshKrishnaTiruvuru
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/75/2018-IA-II(I)
(b)Date of Apply of TOR 28 Feb 2018
(c)Date of Issue of TOR / Standard ToR 05 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
At Proposed Project Site
State :Andhra Pradesh
District :Krishna
Tehsil :Tiruvuru
Village :Ramannapalem
1001. Employement Generation 2. Village Development 3. Pollution Control MeasuresOthersJoint Collector & Addl. District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Bulk Drug and Intermediates Manufacturing Unit142.5Campaign base products
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bulk Drug and Intermediates142.5OthersTPMRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 7.02
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 180
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 180
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Synthetic Organic and Inorganic Chemicals2160Tons per AnnumIndigenousRoad120 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube493649100
(2.)SO2Micro Gram per Meter Cube14101480
(3.)NOxMicro Gram per Meter Cube15101580
(4.)PM2.5Micro Gram per Meter Cube28182860
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.557.177
(2.)Total Hardnessmg/l675245200200
(3.)Fluoridemg/l0.360.2411
(4.)Chloridesmg/l47971250250
(5.)TSSmg/l1811100100
(6.)TDSmg/l1129475500500
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l1.41B
(2.)DOmg/l6.55.3B
(3.)pHNA8.317.77B
(4.)CODmg/l9.67.4B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))494255
(2.)Leq(Night)A-weighted decibels(dB(A))423845
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.0820.02
(2.)K(Potassium)Milligram per Kilogram477185
(3.)Electric ConductivityOthersdS/m1.0560.094
(4.)P(Phosphorus)Milligram per Kilogram340160
(5.)pH7.376.02
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 70
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater207.60.035Copy of Permission LetterPipelineTube Well1588/Hg-II/201826 Jul 2019210
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)High TDS and High COD Stream93.9120Sent to stripper. Stripper condensate is disposed to cement industries for co-processing/TSDF. Stripper bottom is sent to MEE followed by AFTD. Condensate from MEE and ATFD is sent to biological treatment plant followed by RO. RO rejects are sent to MEE and permeate is reused in cooling towers boiler make-up and scrubbersReuse within the Plant & Recycling93.9
(2.)Low TDS and Low COD Stream27150Sent to biological treatment system followed by RO. RO permeate is reused for cooling towers makeup and scrubbers. RO rejects are sent to MEEReuse within the Plant & Recycling27
(3.)Domestic Wastewater810Sent to sewage treatment plant and treated wastewater is reused for on land irrigation to develop green beltGreen Belt Renewal Plant8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 128.9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 128.9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Organic ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2940.5Tons100RoadOthersSent to Cement plants for co-processing or TSDF
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)154.8Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Boiler AshBottom Ash6480Tons60RoadOthersSent to Brick Manufacturers
(4.)Spent Mixed SolventsIndustrial Waste2160Kilolitre140RoadOthersSent to authorized recovery units
(5.)Inorganic Salts/ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2812.2Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube141.711.325.3680
(2.)PM10Microgram per Meter Cube461.71.847.88100
(3.)PM2.5Microgram per Meter Cube251.70.825.8360
(4.)NOxMicrogram per Meter Cube141.713.228.2280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2 x 8 TPH BoilerCoal300.9NOx0.25 g/s
(2.)2 x 2 Lac K.Cal Thermic Fluid HeaterCoal300.5SO20.08 g/s
(3.)2 x 2 Lac K.Cal Thermic Fluid HeaterCoal300.5NOx0.12 g/s
(4.)2 x 8 TPH BoilerCoal300.9PM100.6 g/s
(5.)2 x 8 TPH BoilerCoal300.9SO20.7 g/s
(6.)2 x 2 Lac K.Cal Thermic Fluid HeaterCoal300.5PM100.06 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3520
(b)Source AP Transco
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 1010 kVA and 2 x 500 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 4.05
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4.05
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4.05
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 4.05
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.38
(2.)OthersRoads0.77
(3.)Safety Zone0.5
(4.)Area for Solid Waste Management0.1
(5.)Main Plant1.3
Total (ha.) 4.05
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0No Critically Polluted Area within 10 km of Study Area
(2.)CorridorsNot Applicable0No Corridors within 10 km Study Area
(3.)WLSNot Applicable0No WLS within 10 km of Study Area
(4.)ESAsNot Applicable0No ESAs within 10 km Study Area
(5.)ESZsNot Applicable0No ESZs within 10 km Study Area
(6.)NPANot Applicable0No NPA within 10 km of Study Area
(7.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersReserve ForestAtlapragada and Koduru RF8South Direction
(2.)Archaeological SitesNot Applicable0No Archaeological Sites within 10 km Study Area
(3.)ForestKakarla RF0.04West Direction
(4.)Defence InstallationsNot Applicable0No Defence Installations within 10 km Study Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.05
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Edullavagu Stream
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 160
(c)Temporary Employment- During Construction 60
(d)Temporary Employment- During Operation 40
(e)No. of working days 30
(f)Total Manpower 280
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.38
(b)Percentage of Total Project Area 34.07
(c)No. of Plants to be Planted 3400
(d)Funds Allocated for Plantation 300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0077
(ii)Name of the EIA Consultant Team Labs and Consultants
(iii)Address TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038
(iv)Mobile No. 0402374855
(v)Landline No. 0402374855
(vi)Email Id teamlabs@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA