|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Devadari iron Ore mine of M/s KIOCL Limited with a mine capacity of 2MTPA iron ore (ROM) and 500 TPA manganese ore & with 2 MTPA wet Beneficiation plant including crushing, screening, conveying in tot | (b)Name of the Company / Organisation | KIOCL LIMITED | (c)Registered Address | II BLOCK, KORAMANGALA,
BANGALORE 560034,,Bangalore Urban,Karnataka-560034 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | KV BHASKARA REDDY | (b)Designation (Owner/ Partner/ CEO) | DIRECTOR(PRODUCTION&PROJECTS) | (c)Address | KIOCL LIMITED,
II BLOCK,KORAMANGALA,
BANGALORE 560034,,Bangalore South,Bangalore Urban,Karnataka-560034 | (d)Pin code | 560034 | (e)E-mail | bmining@kioclltd.in | (f)STD Code. | 80(f)Telephone No. | 25531371 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 2(b) Mineral beneficiation
| (b)Category | A | (c)Proposal Number | IA/KA/MIN/72345/2018 | (d)Master Proposal Number(Single Window) | SW/117674/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Kumaraswamy Reserved Forest and Swamimalai Block F | (b)Pincode | 583118 | (c)Bounded Latitudes (North) | | From | | Degree | 15.021691 | Minutes | | Second | | From | | Degree | 15.062108 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.576349 | Minutes | | Second | | From | | Degree | 76.603541 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57A/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1000 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Bellary | Sandur | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/28/2018-IA-II(M) | (b)Date of Apply of TOR | 22 Mar 2018 | (c)Date of Issue of TOR / Standard ToR | 17 May 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 25 Jun 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project Site of Devadari Iron Ore Mine, Swamimalai Block Forest, Sandur Taluk, Ballari District. | State : | Karnataka | District : | Bellary | Tehsil : | Sandur | Village : | Near Renjithpura |
| 500 | Agri crops are affected - problem of water, underground water depletion, problem of grazing land, Pollution especially dust, noise & water, Employment, Education, Plantation, Infrastructure-specially | Others | Additional Deputy Commissioner and Additional District Magistrate, Ballari District. | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Drill machine | 150mm dia | For drilling | (2.) | Front end loader | 1.5-2.5 cu.m | For loading of blasted ore and waste to dumpers | (3.) | Diesel browser | 9 kl | For filling diesel to track mounted equipments | (4.) | Maintenance Van | - | For maintenance of the track mounted equipment | (5.) | Pick up van | - | - | (6.) | Mobile crane | 30 t | For maintenance of the HEMM | (7.) | Rock breaker | 4 t | For secondary breaking | (8.) | Tertiary & Quarternary Cone Crushers | 250 TPH | | (9.) | Cleaner Magnetic Separator | 125 TPH | | (10.) | Regrinding mill | 275 TPH | | (11.) | Cyclones | 438 TPH | | (12.) | Dozer | 150 hp | | (13.) | Water tanker | 9 kl | For suppression of dust | (14.) | Dumpers | 35 MT | For transportation | (15.) | Primary screen | 388 TPH | | (16.) | Rougher Spirals | 135 TPH | | (17.) | Excavator | 4.5cu.m | For excavation & Loading | (18.) | Tyre handler | - | For replacement of dumper tyres | (19.) | Primary Jaw Crusher | 350 TPH | | (20.) | Scalping Screen | 350 TPH | | (21.) | Primary Mill | 118 TPH | | (22.) | Desliming cyclone | 270 TPH | | (23.) | Rougher Spirals | 135 TPH | | (24.) | Concentrate Thickeners | 162 TPH | | (25.) | Tailing Thickener | 108 TPH | | (26.) | Cleaner Spirals | 76 TPH | | (27.) | Secondary Cone Crushers | 250 TPH | | (28.) | Sizing Screens | 350 TPH | | (29.) | Vibrating Screen (D.D.) | 350 TPH | | (30.) | Rougher Magnetic Separator | 151 TPH | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Mining of Manganese ore | 500 | Tons per Annum | | Road,Rail | | (2.) | Mining of Iron ore | 2 | Others | MILLION TONNES/ANNUM | Rail,Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 787.50 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 7.87 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3264 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 3264 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | FUEL OIL | 114 | Others | KL | Agreement will be made with Indian Oil Corporation | Road | | 120 | Others | PURCHASE ORDER | Copy of Linkage | (2.) | HSD | 2760 | Others | kl | Agreement will be made with Indian Oil Corporation | Road | | 120 | Others | PURCHASE ORDER | Copy of Linkage | (3.) | other fuels | 390 | Others | KL | Agreement will be made with Indian Oil Corporation | Road | | 120 | Others | PURCHASE ORDER | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 25.87 | 12.1 | 22.39 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 86.63 | 51.28 | 81.47 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 54.63 | 26.11 | 52.34 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 15.36 | 7 | 14.58 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.77 | 7.08 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | Total Hardness | | | mg/l | | 416 | 212 | 200 | 600 | (4.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.05 | 0.05 | (5.) | TDS | | | mg/l | | 707 | 346 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 64 | 32 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 0.55 | 0.32 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 2 | 2 | C | (2.) | COD | | mg/l | | 0 | 0 | C | (3.) | pH | | NA | | 7.54 | 7.54 | C | (4.) | DO | | mg/l | | 4.6 | 4.6 | C | (5.) | Others | FLOURIDE | mg/l | | 0.21 | 0.21 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 55.6 | 52.8 | 75-55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 47.9 | 42.5 | 70-45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.06 | 5.98 | (2.) | N(Nitrogen) | Kilogram per hectare | | 310 | 162 | (3.) | P(Phosphorus) | Kilogram per hectare | | 201 | 102 | (4.) | K(Potassium) | Kilogram per hectare | | 310 | 73 | (5.) | Electric Conductivity | Others | µ mhos/cm | 742 | 412 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 50 To 60 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 45 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3600 | 50 | Copy of Permission Letter | Pipeline | | Others | Pumping of water from Dam | 3361/CMD | 12 Oct 2018 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water | 0 | 0 | Aerobic Biological treatment (MBBR Technogy | Green Belt Renewal Plant | | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MINERAL | Others | MINERAL | 325061 | Tons | 0 | Road | | Others | DUMP 1 | (2.) | MINE WASTE | Others | MINE WASTE | 5820636 | Tons | 0 | Road | | Others | DUMP 1 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 86.63 | 3.6 | 5.80077 | 92.43977 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 54.63 | 2.4 | 1.93659 | 56.5666 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 15.36 | 2.4 | 0.10410 | 15.4642 | 80 | (4.) | NOx | | Microgram per Meter Cube | 25.87 | 2.4 | 1.14666 | 27.0167 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG SET | Diesel | 4 | 0.1628 | Others | particulate matter | 0.0680 | (2.) | DG SET | DIESEL | 4 | 0.1628 | SO2 | | 0.025 | (3.) | DG SET | DIESEL | 4 | 0.1628 | NOx | | 0.041 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1200 | (b)Source | KPTL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1000 KVA | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 485.7725 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 485.7725 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 470.4 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 470.4 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 11.5887 | | (2.) | Green belt | | 37.42295 | | (3.) | Quarry Area | | 285.23148 | | (4.) | OB Dump Area | | 91.4911 | | (5.) | Tailing Pond | | 33.6341 | | (6.) | Safety Zone | | 11.03167 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NOT APPLICABLE | 0 | NOT APPLICABLE | (2.) | WLS | NOT APPLICABLE | 0 | NOT APPLICABLE | (3.) | Wildlife Corridors | NOT APPLICABLE | 0 | NOT APPLICABLE | (4.) | ESAs | NOT APPLICABLE | 0 | NOT APPLICABLE | (5.) | NPA | NOT APPLICABLE | 0 | NOT APPLICABLE | (6.) | ESZs | NOT APPLICABLE | 0 | NOT APPLICABLE | (7.) | Corridors | NOT APPLICABLE | 0 | NOT APPLICABLE | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Kumaraswamy RF | 3.5 | NOT APPLICABLE | (2.) | Others | TALUK HOSPITAL SANDUR | TALUK HOSPITAL SANDUR | 4.7 | NOT APPLICABLE | (3.) | Archaeological Sites | | NOT APPLICABLE | 0 | NOT APPLICABLE | (4.) | Defence Installations | | NOT APPLICABLE | 0 | NOT APPLICABLE | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 470.4 | (c)Status of Land acquisition if not acquired | The Karnataka State Government has reserved an are | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narihalla | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 4.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 500 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 447.78 | (b)Percentage of Total Project Area | 92.18 | (c)No. of Plants to be Planted | 1190450 | (d)Funds Allocated for Plantation | 10000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Company will take care of Environment as per Environmental policy of the company. | (2.) | Financial | State will get revenue which can be used for development of the area. | (3.) | Social | The direct employment will be 500. Indirect employment will be about 1000. Total population expected to be benefited from this mine is around 5000. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 2 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | iron | Major | (2.) | Manganese | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 2 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 279/1096/2018/BNG/505 | (b)Date of Approval | 08 Mar 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 470.4 | (f)Approved Capacity | 2 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 7.47 | (b)Mineable Reserves (Million Ton) | 7.34 | (c)Extractable Reserves(Million Ton) | 7.21 | (d)Percent(%) of Extraction | 98.22 | (e)Grade of Coal /Ore /Mineral | 45 % Fe and above | (f)Stripping Ratio | 1 : 1.601676 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 75 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 7 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | Yes | (b)Beneficiation / Washing Technology | Iron Ore fines are further processed through feede | (c)Capacity | 2 | (d)Whether it is proposed to install crusher within the mining lease area | Yes | (e)No. of crushers | 3 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 350 | 1NO.,Primary Jaw Crusher | (2.) | 2 | 250 | 1NO.,Secondary Cone Crushers | (3.) | 3 | 250 | 1 NO.,Tertiary & Quarternary Cone Crushers | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 470.4 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 13 Feb 2017 | (iii)Validity of LOI | 7 | (iv)Reference No. of LOI | DMG/MLS/Res.KIOCL/2016-17/0301 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Lease deed shall be executed after obtaining Fores | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | NOT APPLICABLE | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 91.4911 | (iii)Height (in meter) | 10 | (iv)Quantity (in Million Cubic meter) | 6.351664 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.16 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0.16 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 35.878 | (b)Depth (in meter) | 5 | (c)Volume (in Million Cubic meter) | 14.68 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Excavator | (b)Surface to Siding/Loading | Dumpers | (c)Transportation / Conveyor Details | Mine face to crusher by shovel/dumper combination | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 470.4 | 15.3725 | 485.7725 | (2.) | GRAZING LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | AGRICULTURE LAND | | 0 | 0 | 0 | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 470.4 | 15.3725 | 485.7725 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 91.4911 | 0 | 0 | | 91.4911 | (2.) | ROADS | | 0 | 0 | 0 | | 0 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | Other | Tailing pond | 33.63410 | 0 | 0 | | 33.6341 | (5.) | EXCAVATION/QUARRY | | 285.23148 | 0 | 0 | | 285.23148 | (6.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (8.) | GREEN BELT | | 37.42295 | 0 | 0 | | 37.42295 | (9.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | |
TOTAL | 447.77963 | 0 | 0 | 0 | 447.77963 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 91.4911 | (c)Quarry(in hectare) | 285.23148 | (d)Safety Zone(in hectare) | 11.03167 | (e)Final Void of 35.878 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 1000 | (h)Total afforestation plant (in hectare) | 447.78 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2019 | 0 | 0 | 2 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA 95 Dtd:27.08.2019 | (ii)Name of the EIA Consultant | Ecomen Laboratories Pvt. Ltd. | (iii)Address | Flat No. 8, 2nd Floor , Arif Chamber –V, Sector –H, Aliganj, Lucknow-226024 | (iv)Mobile No. | 9335205453 | (v)Landline No. | 0522276188 | (vi)Email Id | ravi.bhargava@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 20 Sep 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP is requested to submit the following:
1. Upload the copy of mining plan
2. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018
3. Copy of Forest Clearance Document
4. Validity of mine lease/LOI
5. Submit the details of capacity of the crushers and screening units.
6. Complete excavation details including total waste material generation.
7. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
8. Details of demand if any raised by Department of Mining and Geology.
9. Details of payment, if any made to Department of Mines & Geology
10. Status of mine whether working or not | 07 Oct 2019 | 2. | NA | The correction have been made as per the instruction received | 28 Nov 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply to ADS generated for DEVADARI IRON ORE MINE of M/s KIOCL as per summary record of the 20th meeting of the Expert Appraisal Committee for Environmental Appraisal of Mining Projects (Non-Coal) of the Ministry of Environment, Forest and Climate Change held during August, 19, 2020 through video conference. | 28 Jun 2021 | 2. | NA | deferred | 30 Aug 2020 | 3. | ADS Reply Letter | SUB: Devadari Iron Ore Mine of M/s KIOCL Limited for mining 2 MTPA Iron Ore (ROM) & 500 TPA Manganese & Wet Beneficiation Plant including Crushing, Screening, Conveying for a capacity of 2 MTPA in a total area of 485.7725 ha (ML Area 470.40 ha and 15.3725 ha outside ML for conveyor corridor approach road, Power transmission line) in Devadari Range, Sandur Taluk, Bellary District, Karnataka State.
Ref: 1.Proposal No. IA/KA/MIN/72345/2018.
2. Email alert on 07.02.2020 from monitoring-ec@nic.in
3. ADS Letter by MoEF&CC (No. J-11015/28/2018-IA-II (M) dated 26/05/2020) | 06 Jul 2020 | 4. | NA | deferred
| 07 Feb 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | KV BHASKARA REDDY | Designation | DIRECTOR(PRODUCTION&PROJECTS) | Name of Company (Applicant Name should not be given here) | KIOCL LIMITED | Address | II BLOCK, KORAMANGALA,
BANGALORE 560034 |
|