Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Establishment of Synthetic Organic Chemicals (Bulk Drug and Intermediates) manufacturing unit by Nifty Labs Pvt. Ltd. Unit II
(b)Name of the Company / Organisation M/S. NIFTY LABS PRIVATE LIMITED – UNIT-II
(c)Registered Address Ramannapalem village,kakarla Gramapanchayati,Tiruvuru Mandal,krishna dist,A.p,,Krishna,Andhra Pradesh-521227
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant D Kesava Reddy
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Flat No.203,Satya sai residency,Plot No.7-1-54/1,Beside MCH Park,Dharm karan road,Ameerpet,Hyderabad,,Ameerpet,Hyderabad,Telangana-500016
(d)Pin code 500016
(e)E-mail desireddy@niftylabs.com
(f)STD Code. 40(f)Telephone No. 66464099
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/73247/2018
(d)Master Proposal Number(Single Window) SW/117635/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. Nos. 7/2, 7/3, 7/4, 138/3, 139, 216, 217, 218,
(b)Pincode 521227
(c)Bounded Latitudes (North)
From
Degree 17.032432
Minutes
Second
From
Degree 17.033723
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.372307
Minutes
Second
From
Degree 80.373798
Minutes
Second
(e)Survey of India Topo Sheet No. E44O12 E44U9 (65C12 65D9)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 102
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 100
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshKrishnaTiruvuru
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/76/2018-IA-II(I)
(b)Date of Apply of TOR 28 Feb 2018
(c)Date of Issue of TOR / Standard ToR 05 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
At Proposed Project Site
State :Andhra Pradesh
District :Krishna
Tehsil :Tiruvuru
Village :Ramannapalem
1501. Employment Generation 2. Village Development 3. Pollution Control MeasuresOthersCollector & District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Bulk Drug and Intermediates Manufacturing Unit360 TPMCampaign base products
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bulk Drug and Intermediates360OthersTPMRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 72
(b) Funds Allocated for Environment Management (Capital) (in Crores) 18.43
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.44
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 25.97
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 450
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 450
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Synthetic Organic Chemicals5400Tons per AnnumIndigenousRoad120 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube493649100
(2.)PM2.5Micro Gram per Meter Cube28182860
(3.)SO2Micro Gram per Meter Cube14101480
(4.)NOxMicro Gram per Meter Cube15101580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l1811100100
(2.)Fluoridemg/l0.360.2411
(3.)Chloridesmg/l47971250250
(4.)pHNA7.557.177
(5.)TDSmg/l1129475500500
(6.)Total Hardnessmg/l675245200200
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l1.41B
(2.)pHNA8.317.77B
(3.)DOmg/l6.55.3B
(4.)CODmg/l9.67.4B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))494255
(2.)Leq(Night)A-weighted decibels(dB(A))423845
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersdS/m1.0560.094
(2.)N(Nitrogen)Percent0.0820.02
(3.)P(Phosphorus)Milligram per Kilogram340160
(4.)pH7.376.02
(5.)K(Potassium)Milligram per Kilogram477185
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 70
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater737.30.1Copy of Permission LetterPipelineTube Well1588/Hg-II/201829 Oct 2018805
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Low TDS and Low COD Stream129550Sent to biological treatment system followed by RO. RO permeate reused for cooling towers makeup and scrubbers. RO rejects are sent to MEE.Reuse within the Plant & Recycling129
(2.)High TDS and High COD Stream336.9450Effluent is stripped in a steam stripper to remove organics and then concentrated in multiple effect evaporators (MEE) followed by drying in agitated thin film dryer (ATFD). Stripper condensate will be sent to cement plants for Co-Incineration. Salt from ATFD is sent to TSDF. Distillate from MEE and ATFD is sent for further treatment in biological treatment plantReuse within the Plant & Recycling336.9
(3.)Domestic Wastewater3040Sent to sewage treatment plant and treated wastewater is reused for on land irrigation to develop green belt.Green Belt Renewal Plant30
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 495.9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 495.9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Organic ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)8631.36Tons100RoadOthersSent to Cement plants for co-processing or TSDF
(2.)Inorganic Salts/ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6814.8Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)408Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Boiler AshBottom Ash9360Tons60RoadOthersSent to Brick Manufacturers
(5.)Spent Mixed SolventsIndustrial Waste9288Kilolitre140RoadOthersSent to authorized recovery units
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube141.711.325.3680
(2.)PM2.5Microgram per Meter Cube251.70.825.8360
(3.)NOxMicrogram per Meter Cube151.713.228.2280
(4.)PM10Microgram per Meter Cube461.71.847.88100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)20 TPH BoilerCoal401.8PM101.8 g/s
(2.)20 TPH BoilerCoal401.8SO23.2 g/s
(3.)12 TPH BoilerCoal401.3NOx1.75 g/s
(4.)20 TPH BoilerCoal401.8NOx4.6 g/s
(5.)12 TPH BoilerCoal401.3PM100.8 g/s
(6.)12 TPH BoilerCoal401.3SO20.95 g/s
(7.)4 x 2 Lac K.Cal Thermic Fluid HeaterCoal300.5PM100.06 g/s
(8.)4 x 2 Lac K.Cal Thermic Fluid HeaterCoal300.5SO20.08 g/s
(9.)4 x 2 Lac K.Cal Thermic Fluid HeaterCoal300.5NOx0.12 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9890
(b)Source AP Transco
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 6 x 1010 kVA and 3 x 500 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 20.234
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 20.234
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 20.234
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 20.234
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt7.025
(2.)OthersRoads4.046
(3.)Area for Solid Waste Management0.485
(4.)Safety Zone2.59
(5.)Main Plant6.088
Total (ha.) 20.234
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0No WLS within 10 km of Study Area
(2.)CorridorsNot Applicable0No Corridors within 10 km Study Area
(3.)Critically Polluted AreaNot Applicable0No Critically Polluted Area within 10 km of Study Area
(4.)ESAsNot Applicable0No ESAs within 10 km Study Area
(5.)ESZsNot Applicable0No ESZs within 10 km Study Area
(6.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km Study Area
(7.)NPANot Applicable0No NPA within 10 km of Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKakarla RF0.05West Direction
(2.)Archaeological SitesNot Applicable0No Archaeological Sites within 10 km Study Area
(3.)Defence InstallationsNot Applicable0No Defence Installations within 10 km Study Area
(4.)OthersReserve ForestAtlapragada and Koduru RF7.5South Direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 20.234
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Edullavagu Steam
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 700
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 100
(e)No. of working days 30
(f)Total Manpower 1050
32.
Green Belt in Ha:
(a)Total Area of Green Belt 7.025
(b)Percentage of Total Project Area 34.72
(c)No. of Plants to be Planted 14000
(d)Funds Allocated for Plantation 800000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Potential
(2.)FinancialReduce Imports of API Intermediates
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0077
(ii)Name of the EIA Consultant Team Labs and Consultants
(iii)Address TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038
(iv)Mobile No. 0402374855
(v)Landline No. 0402374855
(vi)Email Id teamlabs@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Please find the point wise response to the queries rasised in EAC meeting held on 23.10.2019 29 Jan 2020
2.NA

Defreered

11 Nov 2019
3.NA

Defreered

10 Nov 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantD Kesava Reddy
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)M/S. NIFTY LABS PRIVATE LIMITED – UNIT-II
AddressRamannapalem village,kakarla Gramapanchayati,Tiruvuru Mandal,krishna dist,A.p
Print