Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mill Development Plan (MDP) Comprising of augmentation of pulp mill and existing paper machines, installation of Multi-layer Coated Board Machine and installation of 35 MW steam turbine with 135 TPH F
(b)Name of the Company / Organisation THE WEST COAST PAPER MILLS LIMITED
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajendra Jain
(b)Designation (Owner/ Partner/ CEO) ED
(c)Address M/s.West Coast Paper Mills Ltd, Bangur Nagar, Dandeli, Post Box No.5, Uttar Kannada, Karnataka,,Haliyal,Uttara Kannada,Karnataka-581325
(d)Pin code 581325
(e)E-mail bhrathi@westcoastpaper.com
(f)STD Code. 8284(f)Telephone No. 231391
(g)Fax No. 08284231249
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/KA/IND/117479/2018
(d)Master Proposal Number(Single Window) SW/117118/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 3-A (Dandeli), 21- Ambewadi, 22- Kerwad Village
(b)Pincode 581325
(c)Bounded Latitudes (North)
From
Degree 15.249603
Minutes
Second
From
Degree 15.28836
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.621392
Minutes
Second
From
Degree 74.64375
Minutes
Second
(e)Survey of India Topo Sheet No. 48 I11, 48I12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 452
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/408/2006-IA-II(I)
(b)Date of Apply of TOR 01 Aug 2018
(c)Date of Issue of TOR / Standard ToR 09 Oct 2018
(d)Date of Apply of EC 13 Nov 2006
(e)Date of Issue of EC 19 Jul 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0.6
Dr. B.R.Ambedkar Bhavan, Township Dandeli
State :Karnataka
District :Uttara Kannada
Tehsil :Haliyal
Village :Dandeli
12161. Discharge of treated wastewater 2. Air and odour emissions 3. employment opportunities to locals 4. Implementation of CSR programsOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/478/Kar
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 11 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)paper/board production320000130000450000Tons per Annum(TPA)Road
(2.)bleached chemical wood pulp mill725119844OthersBD tpdOthersCaptive
(3.)De-Inking plant0200200OthersBD tpdOthersCaptive
(4.)Captive power plant74.835109.8Mega Watt(MW)OthersCaptive
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Paper Machines3,20,000 TPA25,000 TPA3,45,000 TPAModernization/upgradation
(2.)Board Machines01,05,000 TPA1,05,000 TPAInstallation of new board machine
(3.)Bleached Chemical Wood Pulp Mill725 BD TPD119 BD TPD844 BD TPDUpgradation
(4.)De-Inking Plant0 BD TPD200 BD TPD200 BD TPDNew DIP will be installed.
(5.)Captive Power Plant74.8 MW35 MW109.8 MWNew TG of 35 MW will be installed
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Dec 2016
(iv)Valid Upto 30 Jun 2021
(v)File No. AWH-301773
(vi)Application No. 3514-29/12/2016
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 750
(b) Funds Allocated for Environment Management (Capital) (in Crores) 20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 243400
(b)Existing quantity of raw material/fuel 986500
(c)Total quantity of raw material/fuel 1229900
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Waste Paper24000OthersAD TPAMumbai, Vapi, PuneRoad600 Open MarketCopy of Linkage
(2.)Coal445000Tons per AnnumImport and local marketRoad600 Open MarketCopy of Linkage
(3.)Market pulp (HWP)29600Tons per AnnumImportRoad100 Open MarketCopy of Linkage
(4.)Wood1139000Tons per AnnumProcuring from nearby statesRoad250 OthersSocial and farm forestryCopy of Linkage
(5.)market pulp (SWP)14800Tons per AnnumImportRoad100 Open MarketCopy of Linkage
(6.)BCTMP22500Tons per AnnumImportRoad100 Open MarketCopy of Linkage
(7.)Furnace oil17700OthersKL/annumlocalRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Apr 2017 To 03 Jul 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube15.23.114.680
(2.)PM2.5Micro Gram per Meter Cube36.212.635.960
(3.)PM10Micro Gram per Meter Cube74.930.173.9100
(4.)NOxMicro Gram per Meter Cube27.803.6018.2580
(5.)OthersozoneMicro Gram per Meter Cube27.605.2025.68180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.310.140.30.3
(2.)pHNA8.27.27.58.5
(3.)TSSmg/l26000
(4.)TDSmg/l13842865002000
(5.)Chloridesmg/l357412501000
(6.)Total Hardnessmg/l1030192200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.57.2C
(2.)DOmg/l76.9C
(3.)BODmg/l22C
(4.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))57.249.755
(2.)Leq(Night)A-weighted decibels(dB(A))44.339.345
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.46
(2.)N(Nitrogen)Milligram per Kilogram10468
(3.)Electric ConductivityOthersmicrosiemens per centimeter480190
(4.)P(Phosphorus)Milligram per Kilogram164102
(5.)K(Potassium)Milligram per Kilogram420140
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.6 To 11.8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.4 To 8.4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface758001Copy of Permission LetterPipelineJack WellWRD 98 MBI 200702 Jun 2008100000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Miscellaneous100085885Biological TreatmentReuse within the Plant & Recycling1000
(2.)Wastewater from the mill6330085885Biological TreatmentDischarge into Surface Water Body63300
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 64300
(b)Total Discharged Water (Kilolitre per Day) 63300
(c)Total Reused Water (Kilolitre per Day) 1000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Lime mudIndustrial Waste149600Tons0RoadOthersRecycled using lime kiln with make-up lime
(2.)Saw DustIndustrial Waste27200Tons0OthersNAOthersFired in boiler
(3.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)27200Tons100RoadOthersSent to card board /egg tray manufacturer
(4.)Plastic wastePlastic Waste1700Tons100RoadAuthorized Recyclers
(5.)De-Inking Plant sludgeIndustrial Waste10200Tons100RoadOtherssent to authorized dealers/fired in boilers
(6.)Fly ashFly Ash200600Tons100RoadCo-Processing
(7.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20.4Kilolitre400RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube28.5520.3728.9360
(2.)SO2Microgram per Meter Cube9.5429.619.1580
(3.)NOxMicrogram per Meter Cube18.2524.522.7680
(4.)PM10Microgram per Meter Cube59.6620.9460.60100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Proposed FBC boilerMix of imported and Indian coals853NOx5.83
(2.)Proposed FBC BoilerMix of imported and Indian coals853PM101.38
(3.)Proposed FBC BoilerMix of imported and Indian coals853SO240.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 63100
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 152.05
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 152.05
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 152.05
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 152.05
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.22Plant and Building
(2.)OthersMaterial storage1.61
(3.)Area for Solid Waste Management0.20
(4.)Green belt0.80
Total (ha.) 4.83
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)CorridorsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)ESZsDandeli-Anshi Tiger Reserve/Kali Tiger Reserve2ESZ draft notification is published
(5.)WLSDandeli Wildlife Sanctuary9East
(6.)NPANA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDandeli Reserve Forest0.5NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 152.05
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Entire land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Kali River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 175
(c)Temporary Employment- During Construction 375
(d)Temporary Employment- During Operation 125
(e)No. of working days 340
(f)Total Manpower 675
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt41.60.80942.409
(2.)Percentage of Total Project Area27128
(3.)No. of Plants1130003000116000
(4.)Funds Allocated50100150
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental• Up gradation of Environmental Management Systems. • Maximizing the internal recycling • Reduction in specific freshwater consumption. • Reduction in specific wastewater generation
(2.)SocialRs. 375 Lakhs has been embarked for the local community development within the vicinity of the project area for 5 years under CER The proposed project will create direct employment to about 175 persons and indirect employment to about 125 persons
(3.)FinancialThe project is likely to generate income to the state by way of Goods and Service Tax (GST) to the tune of Rs 50 crores per annum.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 076
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Parry House, 3rd Floor, No.2, NSC Bose Road, Chennai- 600001
(iv)Mobile No. 9677003778
(v)Landline No. 0443044562
(vi)Email Id bhaskarvs@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following shortcomings: • RO certified report is of January, 2017 which is more than two years old. Recent report of RO shall be furnished. • Plant lay out is not legible, not scaled and no legends are mentioned. Revised layout shall be furnished. • Water consumption per ton of paper production is reported as 56 m3 which appears to be on higher side. Water consumption may be reworked out. • Total wastewater generation is 64,300 KLD. Only 1000 KLD is reused and remaining 63,300 is discharged in to surface water body. Reuse of wastewater may be reworked out. • Project site is located at about 2 km from the Eco sensitive zone boundary of DandeliAnshi Tiger Reserve & Hornbill Conservation Reserve boundary as per draft ESZ MoEF&CC Notification. Dandeli Wildlife Sanctuary is located at 9 km (E). Permission obtained from Standing Committee of National Board for Wildlife (SCNBWL) for the existing unit shall be furnished. 13 Sep 2019
2.NAThe correction have been made as per the instruction received 29 Apr 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajendra Jain
DesignationED
Name of Company (Applicant Name should not be given here)THE WEST COAST PAPER MILLS LIMITED
AddressBANGURNAGAR DANDELI