Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity Expansion of Sri Jayalakshmi Ferro Alloys (P) Limited from 31,320 to 1,30,320 TPA Ferro alloys production by installation of additional 3x9 MVA+ 1X24 MVA Submerged Arc Furnace (SAF) along wit
(b)Name of the Company / Organisation SHRI JAYALAKSHMI FERRO ALLOYS PVT LTD
(c)Registered Address P.O. Chirkunda, District- Dhanbad,,Dhanbad,Jharkhand-828202
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Amit Agarwalla
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address P.O. Chirkunda, District - Dhanbad,,Nirsa-Cum-Chirkunda,Dhanbad,Jharkhand-828202
(d)Pin code 828202
(e)E-mail shrijayalakshmiferroalloy@gmail.com
(f)STD Code. 124(f)Telephone No. 4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND/117330/2008
(d)Master Proposal Number(Single Window) SW/117327/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy.No. 12 to 16, 18, 20, 33, 34 & 49
(b)Pincode 535101
(c)Bounded Latitudes (North)
From
Degree 18.3214
Minutes
Second
From
Degree 18.3269
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.47644
Minutes
Second
From
Degree 85.48219
Minutes
Second
(e)Survey of India Topo Sheet No. E44L7, E44L8, E44L11 & E44L12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 116
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 27
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/331/2008-IA.II(I)
(c)Date of Issue of TOR 10 Jun 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 15 Oct 2019
(c)Date of Issue of EC 25 Feb 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0.2
Near the existing plant of M/s Sri Jayalakshmi Ferro Alloys Pvt. Ltd
State :Andhra Pradesh
District :Vizianagaram
Tehsil :Gurla
Village :Pedabantupalli
60During Public Hearing, Issues regarding the Environment Protection, CER activities and employment generation were raised.OthersDistrict Joint Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/802/AP/1479
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 29 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ferro Alloys3132099000130320Tons per Annum(TPA)Road
(2.)Sinter01800018000Tons per Annum(TPA)Conveyor Belt
(3.)Briquettes0150000150000Tons per Annum(TPA)Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sinter Plant01800018000Sinter
(2.)Submerged Arc Furnace2x9 MVA3x9 MVA & 1x24 MVA5x9 MVA & 1x24 MVAFerro Manganese /Silico Manganese/Ferro silicon/Ferro Chrome
(3.)Briquette Plant0150000150000Briquettes
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Apr 2019
(iv)Valid Upto 30 Apr 2020
(v)File No. APPCB/VSP/VZN/18930-1/CFO/HO/2017
(vi)Application No. APPCB/VSP/VSP/32/CFO/HO/2019
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 182.13
(b) Funds Allocated for Environment Management (Capital) (in Crores) 11.43
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.62
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 402230
(b)Existing quantity of raw material/fuel 112770
(c)Total quantity of raw material/fuel 515000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Mn ore339000Tons per AnnumBrazil, Singapore, Australia through Vizag PortRoad90 LinkageCopy of Linkage
(2.)Coke118000Tons per AnnumCountry : China, Port: Gangavaram Port & RINL CokeRoad100 Open MarketCopy of Linkage
(3.)Chrome Ore Fines150000Tons per AnnumOdishaRoad400 LinkageCopy of Linkage
(4.)Chrome Ore Lumps33000Tons per AnnumDomestic, OdishaRoad400 Open MarketCopy of Linkage
(5.)Char/Charcoal170000Tons per AnnumVisakhapatnam, Andhra PradeshRoad100 Open MarketCopy of Linkage
(6.)Dolomite26000Tons per AnnumKhammam TelanganaRoad470 LinkageCopy of Linkage
(7.)Magnesite52000Tons per AnnumSalem, Tamil NaduRoad710 Open MarketPurchase OrderCopy of Linkage
(8.)Quartz234600Tons per AnnumDattirajeru Mandal, VizianagaramRoad17 LinkageCopy of Linkage
(9.)Mill Scale6500Tons per AnnumVisakhapatnam, Andhra PradeshRoad100 Open MarketCopy of Linkage
(10.)Coal78000Tons per AnnumCountry : South Africa, Port:Gangavaram PortRoad100 OthersPurchase OrderCopy of Linkage
(11.)Manganese Slag63000Tons per AnnumJapan through Vizag PortRoad90 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube91.448.290.9100
(2.)PM2.5Micro Gram per Meter Cube55.435.255.260
(3.)SO2Micro Gram per Meter Cube22.39.421.480
(4.)OthersCOMili Gram per Meter Cube0.960.550.962
(5.)NOxMicro Gram per Meter Cube43.817.343.180
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l320.52184.52200600
(3.)Heavy MetalsZnmg/l1.951.24515
(4.)Chloridesmg/l126.4562.152501000
(5.)pHNA7.937.346.58.5
(6.)TDSmg/l5753805002000
(7.)Fluoridemg/l1.030.521.01.5
    14.3.     No. of Surface Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.337.41C
(2.)DOmg/l6.75.3C
(3.)BODmg/l21.5612.50C
(4.)CODmg/l63.1538.10C
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.550.875
(2.)Leq(Night)A-weighted decibels(dB(A))56.838.970
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.206.97
(2.)N(Nitrogen)Kilogram per hectare272.0243.0
(3.)K(Potassium)Kilogram per hectare331.0295.0
(4.)P(Phosphorus)Kilogram per hectare45.1626.84
(5.)Electric ConductivityMillisiemens per Centimetre0.4520.297
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.41 To 12.20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.75 To 11.26
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1650Copy of Permission LettermodeOthersBOREWELLTube Well1633/Hg-II/201819 Sep 2019170
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Softening Plant Backwash2022Neutralisation PitReuse within the Plant & Recycling20
(2.)Sewage56Septic Tank & Soak PitOthersGardening50
(3.)Cooling Tower Blowdown from SMS & Power Plant1517Neutralisation PitReuse within the Plant & Recycling15
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 40
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 40
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Si-Mn SlagOthersSi-Mn Slag65000Tons0RoadOthersWill be used in road development
(2.)Bag Filter DustOthersDust3000Tons0Conveyor BeltOthersWill Be used in Sinter Plant or Briquette Plant
(3.)Fe-Mn SlagOthersFe-Mn Slag78000Tons0Conveyor BeltOthersReused in Si-Mn Production
(4.)Fe-Cr SlagOthersFe-Cr Slag65000Tons0RoadOthersWill be used in road development
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube91.40.52.5793.98100
(2.)PM2.5Microgram per Meter Cube55.40.51.5456.9560
(3.)SO2Microgram per Meter Cube21.50.51.1222.6380
(4.)NOxMicrogram per Meter Cube40.10.50.8040.9180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Briquette Plant-301.0PM100.25
(2.)SAF 1-302PM100.32
(3.)SAF 2-302PM100.29
(4.)SAF 3,4 & 5-301.5PM100.30
(5.)SAF 6-301.5PM100.36
(6.)Sinter Plant-301.6PM100.28
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 56000
(b)Source APEPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1x250KVA and 1x125KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 17.53
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 17.53
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 19841
(b)Waste/Barren Land (ha.) 1731
(c)Grazing/ Community Land (ha.) 7836
(d)Surface Water Bodies (ha.) 747
(e)Settlements (ha.) 1027
(f)Industrial (ha.) 247
(g)Forest (ha.) 944
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : No other land type 0
    Total (ha.) 32373
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.64
(2.)Green belt5.79
(3.)OthersStorage Area & Internal Roads7.10
Total (ha.) 17.53
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNo ESZ0No ESZ within 10 km radius of Project site
(2.)ESAsNo ESA0No ESA within 10 km radius of Project site
(3.)Critically Polluted AreaNo CPA0No CPA within 10 km radius of Project site
(4.)WLSNo WLS0No WLS within 10 km radius of Project site
(5.)CorridorsNo Corridors0No Corridors within 10 km radius of Project site
(6.)Wildlife CorridorsNo Wildlife Corridors0No Wildlife Corridors within 10 km radius of Project site
(7.)NPANo NPA0No NPA within 10 km radius of Project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNo Forest0No Forest within 10 km radius of Project site
(2.)Defence InstallationsNo Defence Installation0No Defence Installation within 10 km radius of Project site
(3.)Archaeological SitesNo Archaeological site0No Archaeological site within 10 km radius of Project site
(4.)OthersReligious PlaceShiv Temple0.9In South of project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 17.53
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gadigedda Reservoir
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 3.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 150
(b)Permanent Employment-During Operation 1000
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 1200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.52.295.79
(2.)Percentage of Total Project Area201333
(3.)No. of Plants500040009000
(4.)Funds Allocated250000020000004500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe region shall also be benefited from the project as there will be direct and indirect employment of people in the Ferro Alloy plant. Preference will be given to the people of the state possessing requisite skill and qualification criteria. Also there will be lot of scope for indirect employment of the people of the state in and around the project site.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 077
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address Plot no.82A, Sector-5, IMT Manesar, Gurugram, Haryana-122052
(iv)Mobile No. 9953147268
(v)Landline No. 0124429103
(vi)Email Id metallurgy@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following shortcomings: • Permission for the ground water drawl of 165 KLD from the Competent Authority shall be furnished. • Plant lay out is not scaled and no legends are mentioned. Engineering layout shall be furnished. • Existing PM10 level in ambient air is reported as 91 mg/Nm3. Reason for such higher level of particulate matter shall be furnished. 13 Sep 2019
2.NAThe correction have been made as per the instruction received 28 Sep 2019
3.NAProposal is returned due to followings: • EIA report does not have signature of the coordinators and functional area experts. • Engineering plant lay out shall be furnished. • Social impact assessment has not been carried out. 15 Oct 2019
4.NAProposal is returned due to followings: • EIA report does not have signature of the coordinators and functional area experts. • Engineering plant lay out shall be furnished. • Social impact assessment has not been carried out. 15 Oct 2019
5.NAThe correction have been made as per the instruction received 15 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAmit Agarwalla
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)SHRI JAYALAKSHMI FERRO ALLOYS PVT LTD
AddressP.O. Chirkunda, District- Dhanbad