1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Bajri Mining in riverbed at Tehsil Jaitaran District Pali with proposed Production Capacity of 16.50 Lakhs TPA by M/s Neetu Singh | (b)Name of the Company / Organisation | NEETU SINGH | (c)Registered Address | ADAMPURA, TEHSIL & DISTRICT- BIJNOR,,Bijnor,Uttar Pradesh-246701 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | NEETU SINGH | (b)Designation (Owner/ Partner/ CEO) | OWNER | (c)Address | ADAMPURA, TEHSIL AND DISTRICT - BIJNOR,,Bijnor,Bijnor,Uttar Pradesh-246701 | (d)Pin code | 246701 | (e)E-mail | neetusinghjaitaran@gmail.com | (f)STD Code. | 141(f)Telephone No. | 4036199 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/MIN/117185/2017 | (d)Master Proposal Number(Single Window) | SW/117179/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 205, 77,1640, 1705, 1706, 1708, 1709, 1838,1,61, 6 | (b)Pincode | 306302 | (c)Bounded Latitudes (North) | | From | | Degree | 23 | Minutes | 06 | Second | 30.1 | From | | Degree | 26 | Minutes | 27 | Second | 94 | (d)Bounded Longitudes (East) | | From | | Degree | 73 | Minutes | 48 | Second | 43.88 | From | | Degree | 74 | Minutes | 17 | Second | 34.52 | (e)Survey of India Topo Sheet No. | G43H/10,G43H/11,G43H/12,G43H/14, G43H/15,G43H/1G43 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 278 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Pali | Jaitaran | Agewa to Sinla | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/03/2017-IA.II(M) | (b)Date of Apply of TOR | 27 Apr 2017 | (c)Date of Issue of TOR / Standard ToR | 06 Jun 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 26 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Block office Jaitara | State : | Rajasthan | District : | Pali | Tehsil : | Jaitaran | Village : | jaitaran |
| 55 | about environment and employment | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Excavator | 6 | As per availability on hire basis | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 4365.64 ha | 1650000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 25 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.62 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.450 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 10 | Kilo Litre per Day | | nearby market | Road | | 5 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 27.6 | 12.3 | 26.82 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 90.9 | 68.3 | 90.6 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 55.3 | 34.2 | 51.9 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 13.3 | 5.2 | 12.94 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.31 | 7.48 | 8.0 | 8.5 | (2.) | Fluoride | | | mg/l | | 1.20 | 0.78 | 0 | 1.5 | (3.) | Heavy Metals | | ZN | mg/l | | 2.45 | 1.53 | 0 | 15 | (4.) | Chlorides | | | mg/l | | 215.73 | 135.75 | 0 | 100 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | TDS | | | mg/l | | 1348 | 796 | 0 | 2000 | (7.) | Total Hardness | | | mg/l | | 786.47 | 382.51 | 0 | 600 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.4 | 6.3 | E | (2.) | BOD | | mg/l | | 10.50 | 8.50 | E | (3.) | COD | | mg/l | | 38.60 | 33.50 | E | (4.) | pH | | NA | | 8.32 | 8.14 | E | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.51 | 41.27 | 75 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.34 | 50.77 | 75 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 280 | 172 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.342 | 0.288 | (3.) | pH | | | 8.34 | 7.80 | (4.) | P(Phosphorus) | Kilogram per hectare | | 26.81 | 17.52 | (5.) | N(Nitrogen) | Kilogram per hectare | | 273 | 218 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 19 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16 To 17 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 148.50 | 6 | Not Appliacble | modeOthers | Tankers | Others | Borewell | 0 | 03 Jun 2019 | 148.50 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic and workshop | 0 | 0 | septic tank | Others | soak pit | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | NA | Others | There will be no waste generation | 0 | Tons | 0 | Others | no waste generate | Others | dustbin | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 13.2 | 5 | 2.03 | 15.23 | 80 | (2.) | NOx | | Microgram per Meter Cube | 27.61 | 5 | 5.02 | 32.63 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 55.30 | 3 | 0.9 | 56.2 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 90.5 | 5 | 4.95 | 95.49 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | 0 | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NA | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 4365.64 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4365.64 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.0 | (b)Waste/Barren Land (ha.) | 0.0 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 4365.64 | (e)Settlements (ha.) | 0.0 | (f)Industrial (ha.) | 0.0 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : others | 0.0 | Total (ha.) | 4365.6400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 25.71 | | (2.) | Quarry Area | | 392 | | (3.) | Built Up Area | | 42.61 | | (4.) | Others | Undisturbed area | 3905.32 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NA | 0 | not applicable | (2.) | WLS | NA | 0 | there are no WLS with in 10.0 km of lease area | (3.) | ESAs | NA | 0 | not applicable | (4.) | Critically Polluted Area | NA | 0 | not applicable | (5.) | NPA | NA | 0 | the mining lease area is not under NPA | (6.) | Corridors | NA | 0 | not applicable | (7.) | Wildlife Corridors | NA | 0 | not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Jod PF | 7.2 | SE direction from Luni nadi | (2.) | Archaeological Sites | | NA | 0 | not applicable | (3.) | Defence Installations | | NA | 0 | not applicable | (4.) | Others | NA | NA | 0 | not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo cristatus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 15.0 lakh | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Project is lies on Lilri, Luni, Sukri, Raipur Luni river | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | near Ras | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.25 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 46 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 300 | (f)Total Manpower | 66 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 25.71 | (b)Percentage of Total Project Area | 0.59 | (c)No. of Plants to be Planted | 25000 | (d)Funds Allocated for Plantation | 2500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | About Rs. 45.0 lakh/annum will be spent by project proponent to environment management plan. Green belt development along the roads and villages will improve the environment condition of surrounding area | (2.) | Social | The project will contribute additional revenue to the State and Central Govt. in the form of royalty and other taxes etc. The people in area will be able to utilize improved facilities with regard to education, health care, hygiene, recreational opportunities, small business opportunities etc | (3.) | Financial | Proposed Bajari Mine by Smt Neetu Singh supply to the various consumers in the state and outside the state that will encourage the industries to enhance or improve their capacity for the end users which will support the economic growth and industrial improvement | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Bajari | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1650000 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | SME/JO/CC/ sojat/Minor/ M.L./33/2014/7303 | (b)Date of Approval | 06 Feb 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | State | (e)Approved Mining Lease Area | 4365.64 | (f)Approved Capacity | 1650000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 131 | (b)Mineable Reserves (Million Ton) | 80.5 | (c)Extractable Reserves(Million Ton) | 1.65 | (d)Percent(%) of Extraction | 1.25 | (e)Grade of Coal /Ore /Mineral | mineral | (f)Stripping Ratio | 1 : 1 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 1 in 10 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 48 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 4365.64 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 10 Nov 2016 | (iii)Validity of LOI | 5 | (iv)Reference No. of LOI | ADM/JODH/MM/SOJAT/ML/BAJARI/2016/1970 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Not required | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | not required | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 0 | (b)Depth (in meter) | 0 | (c)Volume (in Million Cubic meter) | 0 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Not applicable | (b)Surface to Siding/Loading | not applicable | (c)Transportation / Conveyor Details | by truks | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 0 | 0 | 0 | (2.) | GRAZING LAND | | 0 | 0 | 0 | (3.) | SETTLEMENTS | | 0 | 0 | 0 | (4.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (5.) | OTHERS(Specify) | Riverbed | 4365.64 | 0 | 4365.64 | (6.) | FOREST LAND | | 0 | 0 | 0 | (7.) | AGRICULTURE LAND | | 0 | 0 | 0 | |
TOTAL | 4365.64 | 0 | 4365.64 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | EXCAVATION/QUARRY | | 0 | 392 | 0 | | 392 | (3.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (4.) | GREEN BELT | | 25.71 | 0 | 0 | | 25.71 | (5.) | ROADS | | 0 | 0 | 42.61 | | 42.61 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (7.) | VIRGIN AREA | | 0 | 3905.32 | 0 | | 3905.32 | (8.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | |
TOTAL | 25.71 | 4297.32 | 42.61 | 0 | 4365.64 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 873.12 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 972 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 25.71 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0091 | (ii)Name of the EIA Consultant | Overseas Min-Tech Consultant | (iii)Address | 501, 5th floor, Apex Tower, Tonk Road, Jaipur | (iv)Mobile No. | 9460221084 | (v)Landline No. | 0141274450 | (vi)Email Id | arun.omtc@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 31 Jul 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Authorization is in the name of consultant which is not acceptable without Power of Attorney in the name of consultant.
ToR granted on 6.06.2016 but in the form-II it has mentioned 6.06.2017. The ToR was valid till 5.06.2019 thus please submit the letter for extension of ToR. Conservation plan is not approved by Chief Wildlife Warden and proof of submission of the same is not uploaded, Cluster certificate is not opening, LOI was issued on 10.12.2014 and was valid for one year, thus PP needs to submit the valid LOI, actual replenishment study report and other information sought from State Government in EAC meeting held on Jan-2018 and May-2018 needs to be submitted, DSR as per S.O. 141(E) dated 25.07.2018 needs to be submitted. Pleas ensure that all the ToR points needs to be complied, NOC from pervious ACO and intimation for change of consultant needs to be submitted. | 07 Oct 2019 | 2. | NA | The correction have been made as per the instruction received | 10 Oct 2019 | 3. | NA | PP is requested to submit the following:
(i)To upload all the information as sought by EAC in its meeting held on 8-9 January, 2018 and 30 May 2018 for sand mining proposal of Rajasthan. | 13 Feb 2020 | 4. | Eds Reply Letter | Dear Sir, we would like to bring into your kind notice our final EIA/EMP report submitted dtd. 09.09.2019 and some EDS were sought by Hon'ble EAC , Point wise reply of the same is enclosed herewith along with all requisite annexure for your record and ready reference. Therefore, we request your goodself to kindly proceed our project further for issuance of EC at the earliest. | 17 Mar 2022 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply of ADS | 03 Apr 2024 | 2. | NA | Sir,
This is to inform you that the instant proposal was considered in the 23rd EAC (Non-Coal Mining) meeting held during 5-7 December, 2023 wherein the EAC noted your requisition letter dated 14.11.2023 regarding the change in scope of the proposal. Accordingly, the EAC recommended to return the proposal in present form. | 01 Jan 2024 | 3. | ADS Reply Letter | Reply of ADS Letter | 15 Nov 2023 | 4. | NA | Sir,
The Project Proponent is requested to submit the valid LoI and District Survey Report (DSR) as per Ministry’s Notification S.O.3611(E) dated 25.07.2018 and in accordance with the order of Hon’ble Supreme Court dated 10.11.2021 in Civil Appeal Nos. 3661-3662 of 2020 titled as State of Bihar V/s Pawan Kumar. It is kindly requested to provide the copy of approved DSR by SEIAA. | 19 May 2023 | 5. | ADS Reply Letter | We request you to Kindly consider our proposal in next agenda and grant us Environmental Clearance at your earliest. | 07 Feb 2023 | 6. | NA | Sir,
Pl. provide the following documents:
• PP has submitted that the LOI issued on 10.11.2016 and it was valid for a period of 5 years only. status of validity of LOI and copy is required.
• Cluster Certificate
• DSR approved by the SEIAA.
• The recent Replenishment Study report.
• Authenticated English Translation of Public hearing minutes
• Letter for no forest land, National Park, Wildlife Sanctuary etc. within 10 km radius of the study area.
• Authenticated List of Flora and Fauna
• Authenticated Baseline test reports.
• Latest valid NABET Accreditation Certificate | 22 Nov 2022 | 7. | ADS Reply Letter | Uploaded EDS Reply | 28 Oct 2022 | 8. | NA | The proposal for Environmental Clearance was considered in the 49th EAC meeting held during 19th – 21st April, 2022. The Member Secretary informed the Committee that the project proponent vide letter dated 14.04.2022 requested to defer the proposal due to unforeseen circumstances. Therefore, the Committee deferred the proposal.
Further, a decision is pending in the Ministry that deferred cases of minor mineral to be handle at central or state level. Accordingly Ministry may take appropriate action. | 12 Sep 2022 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | NEETU SINGH | Designation | OWNER | Name of Company (Applicant Name should not be given here) | NEETU SINGH | Address | ADAMPURA, TEHSIL & DISTRICT- BIJNOR |
|