Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Singrauli Super Thermal Power Project, Stage-III (2x800 MW)
(b)Name of the Company / Organisation NTPC Limited
(c)Registered Address NTPC Engineering Office Complex Sector-24, Noida,NTPC Engineering Office Complex Sector-24, Noida,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vijay Prakash
(b)Designation (Owner/ Partner/ CEO) Head of Deptt Env Engg
(c)Address NTPC Engineering Office Complex Sector-24, Noida,NTPC Engineering Office Complex Sector-24, Noida,,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Pin code 201301
(e)E-mail environment.ntpc@gmail.com
(f)STD Code. 120(f)Telephone No. 2410331
(g)Fax No. 24105060
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(d) Thermal Power Plants
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/THE/117100/2016
(d)Master Proposal Number(Single Window) SW/117086/2019
(e)EAC concerned (for category A Projects only) Thermal Projects
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 10
(b)Pincode 231222
(c)Bounded Latitudes (North)
From
Degree 2654587.5934
Minutes
Second
From
Degree 2654587.5934
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 601714.5538
Minutes
Second
From
Degree 607114.5538
Minutes
Second
(e)Survey of India Topo Sheet No. 64 L/12,64 L/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 280
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-13012/09/2016-IA I (T)
(c)Date of Issue of TOR 06 Mar 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Sep 2019
(c)Date of Issue of EC 13 Jul 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Auditorium of NTPC LTD,Shaktinagar
State :Uttar Pradesh
District :Sonbhadra
Tehsil :Dudhi
Village :Shaktinagar
189Drinking water, Road and Sanitation, Electricity. JobsOthersAdditional Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 001
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 9 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Electricity Generation200016003600Mega Watt(MW)OthersTransmission line
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)2x8005x200+2x5002x80036005x200 will be decommission after commissioning of 2x800
(2.)2x8005x200+2x5002x80036005x200 will be decommission after commissioning of 2x800
(3.)2x8005x200+2x5002x80036005x200 will be decommission after commissioning of 2x800
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Mar 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 2236/UPPCB/SONEBHDRA(UPPCBRO)/CTO/AIR/SONEBHADRA/2
(vi)Application No. 137004
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 11363
(b) Funds Allocated for Environment Management (Capital) (in Crores) 11363
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 240
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8400000
(b)Existing quantity of raw material/fuel 10000000
(c)Total quantity of raw material/fuel 18400000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal8400000Tons per AnnumNCLRail0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 May 2017 To 14 May 2018
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube82.744.581.7100
(2.)PM2.5Micro Gram per Meter Cube55.616.955.460
(3.)SO2Micro Gram per Meter Cube43.88.543.680
(4.)NOxMicro Gram per Meter Cube51.910.349.980
(5.)OthersCOMicro Gram per Meter Cube7292377282000
    14.2.     No. of Ground Water monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l679.881200600
(2.)TDSmg/l8711325002000
(3.)Fluoridemg/l2.10.21.01.5
(4.)Heavy MetalsCadmiummg/l0.020.0010.0030
(5.)Heavy MetalsZincmg/l1.30.01515
(6.)OthersTotal Alkalinity ac CaCO33mg/l42648.3200600
(7.)pHOthersnot required8.316.27.58.5
(8.)Heavy MetalsLeadmg/l0.080.0090.010
(9.)Chloridesmg/l246.714.22501000
(10.)OthersIronmg/l0.2820.010.30
(11.)TSSmg/l382800
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.24.8C
(2.)BODmg/l73C
(3.)OthersTotal Hardnessmg/l298.740C
(4.)OthersTotal Coli-formsOthersMPN/100 ML219046C
(5.)pHNA8.316.61C
(6.)CODmg/l205C
    14.4.     No. of Ambient Noise monitoring locations : 20
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.2543.8365
(2.)Leq(Night)A-weighted decibels(dB(A))56.6540.2355
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.16.1
(2.)N(Nitrogen)Kilogram per hectare43027.2
(3.)P(Phosphorus)Kilogram per hectare30757.7
(4.)Electric ConductivityMillisiemens per Centimetre1003101
(5.)K(Potassium)Kilogram per hectare717.544.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 22 To 4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.10 To 20.50
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface388800.4Copy of Permission LetterPipelineOthersDischarge Channel of Singrauli STPS-II36/24/200428 Jan 200448000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DM Filter Backwash240240Recycled in to DM Clarifier inletReuse within the Plant & Recycling240
(2.)Tube settler Sludge120120ash water tankReuse within the Plant & Recycling120
(3.)Clarifier Sludge840840tube settlerReuse within the Plant & Recycling840
(4.)Boiler Blowdown24002400Recycled in to ACW make-upReuse within the Plant & Recycling2400
(5.)DM Neurtilization Pit water480480Recycled in to Ash slurry sumpReuse within the Plant & Recycling480
(6.)Domestic Sewage360360STPGreen Belt Renewal Plant360
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4440
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4440
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshBottom Ash570000Tons7OthersPipelineOthersash utilisation
(2.)Fly ashFly Ash2280000Tons7RailOthersash utilisation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube43.82.24.948.780
(2.)PM10Microgram per Meter Cube82.72.21.584.21100
(3.)NOxMicrogram per Meter Cube51.92.24.956.8180
(4.)PM2.5Microgram per Meter Cube55.62.20.1555.7660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Power plantcoal2758.8SO288.4
(2.)Power plantCoal2758.8PM1026.5
(3.)Power plantCoal2758.8NOx88.4
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6000
(b)Source captive
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3x2000 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 227.5
    Total Land (ha.) 227.5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 227.5
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Not applicable 0
    Total (ha.) 227.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant42.9including switch yard
(2.)OthersAir cooled Condenser15.3
(3.)Green belt26.30
(4.)Built Up Area143DM & PT plant area, CHP, balance facilities
Total (ha.) 227.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaSingrauli0Proposed project is located in Critically Polluted area.
(2.)NPANil10There is no National Park within 10 km radius of the project
(3.)ESAsNil10There is no Eco sensitive area within 10 km radius of the project
(4.)WLSNil10There is no Wildlife Sanctuary within 10 km radius of the project
(5.)ESZsNil10There is no eco sensitive zone within 10 km radius of the project
(6.)Wildlife CorridorsNil10Nil
(7.)CorridorsNil10There is no any corridor within 10 km radius of the project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDudichua Protected Forests4.1Protected forest
(2.)Archaeological SitesNil0Nil
(3.)Defence InstallationsNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 12000
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 562
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Python, Marsh crocodiles, Shikra
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rihand Reservoir, Ralla Kaluva River (1.0 km, NE) Swarnamukhi River (2.2 km, S)
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 250
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 1250
(d)Temporary Employment- During Operation 250
(e)No. of working days 330
(f)Total Manpower 2000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1192651257
(2.)Percentage of Total Project Area26.51238.5
(3.)No. of Plants16000001160001716000
(4.)Funds Allocated05000000050000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProposed Singrauli STPP Stage-III (2x800 MW) will have state of art Super Critical Technology which has better efficiency and less carbon emissions in comparison to sub-critical technology. Air Cooled Condensers (ACC) technology will reduce the water consumption more than 50% wet cooling tower system. These new technologies will help in conservation of natural resources like coal and water. Installation of High efficiency ESP, FGD and De-Nox System will comply the emission norms of MOEF&CC and r
(2.)SocialThe setting up of the proposed project will lead to direct and indirect benefits to the overall socio-economic development of the region.
(3.)FinancialEstablishment of large developmental projects improve the availability of the physical infrastructure (like approach roads, drainage, communication and transportation facilities etc.) and social infrastructures (like education and health care system). These will also benefit the local population. NTPC has taken up several community welfare and community development activities under Corporate Social Responsibility and this will be strengthened during commissioning of Singrauli STPP Stage-III.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed Supercritical
(b) Plant Load Factor(%) 90
(c) Station Heat Rate (Kcal/Kwh) 2447
(d) Steam Rate/Flow Rate 2660
(e) Boiler Temperature 603
(f) Boiler Pressure 270
(g) Type of Stack Bi-flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)8.82758.818.360
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)CoalLinkage
Source of Linkage :NCL
Quantity of Linkage Granted :8400000
Date of Linkage :10 Apr 2018
Duration of Linkage :25
Gross Calorific Value (Kcal/Kg) :3500
Ash Content (%) :34
Sulphur Content (%) :0.35
Moisture (%) :13.7
Mercury (mg/kg) :0
Fixed Carbon (%) :29.7
Volatile Matter (%) :23.12
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Coal
Distance :0
Quantity :8400000
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
08400000
TOTAL Distance : 0
Quantity : 8400000
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Air Cooled
(b) Type of Draft Forced Draft
(c) Type of Air Circulation Parallel Flow
(d) Cycle of Cooling (COC) 5
(e) Water Req. For Cooling (m3/day) 195
(f) Boiler Blow Down Temperature 60
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court NGT
(c)Name of the Sub Court NGT Western Zone
(d)Case No. 276 of 2013, 162 of 2015, 482 of 2015
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Nil
(f)Case Details 1. Ashwini Kumar Dubey Vs UOI & others 276 of 2013
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Directions under Section 5 of the Environment (Protection) Act, 1986 tegarding compliance of emission limit notified vide notification No.S.0.3305 (E) dated 07.12.2015
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Site visit completed
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/0957 Dated: 16th April, 2019
(ii)Name of the EIA Consultant Vimta Labs Ltd.
(iii)Address 142, IDA, Phase-II, Cherlapally, Hyderabad–500051, Telangana State
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id env@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 19 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPoint wise replies to additional information sought by MOEF&CC vide letter dated 22.10.2019 12 Feb 2020
2.NA

ok

10 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVijay Prakash
DesignationHead of Deptt Env Engg
Name of Company (Applicant Name should not be given here)NTPC Limited
AddressNTPC Engineering Office Complex Sector-24, Noida
Print