Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Urmit Chemicals Pvt. Ltd.
(b)Name of the Company / Organisation URMIT CHEMICALS PVT. LTD.
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Amit Patel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address NIL
(d)Pin code 380050
(e)E-mail urmitchem@gmail.com
(f)STD Code. 79(f)Telephone No. 26583055
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/89506/2018
(d)Master Proposal Number(Single Window) SW/116903/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 1384, Village: Rajpur, Tal: Kadi, Dist:
(b)Pincode 380050
(c)Bounded Latitudes (North)
From
Degree 23.346666
Minutes
Second
From
Degree 23.346944
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.406944
Minutes
Second
From
Degree 72.408055
Minutes
Second
(e)Survey of India Topo Sheet No. F43A7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 79
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMahesanaKadi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/418/2018-IA-II(I)
(b)Date of Apply of TOR 24 Dec 2018
(c)Date of Issue of TOR / Standard ToR 04 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :6.0
Champaben Ratilal Patel Town Hall, Near Bhimnath Talav, Kadi, Ta: Kadi, Dist. Mehsana
State :Gujarat
District :Mahesana
Tehsil :Kadi
Village :Kadi
50Priority to local employment, Green belt development, women empowerment.OthersAdditional district magistrate, Mehsana
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Agitated Notch Filter5 KL2 Nos.
(2.)Centrifuge Filter48"3 Nos.
(3.)Glass Column Scrubber002 Nos.
(4.)Alkali Scrubber002 Nos.
(5.)Spin Flash Dryer500 Liter/hr.1 Nos.
(6.)Spray Dryer1000 Liter/hr.1 Nos.
(7.)HDPE Tank20 KL2 Nos.
(8.)Ball Mill1 MT1 Nos.
(9.)Boiler2 T/hr1 Nos.
(10.)Hot Air Generator5 Lakhs Kcal/hr.1 Nos.
(11.)D.G. set500 KVA1 Nos.
(12.)RO25 m3/hr.1 Nos.
(13.)MS Rubber Lined Reactor75 KL2 Nos.
(14.)MS Glass Lined Reactor5 KL7 Nos.
(15.)MS Rubber Lined Reactor50 KL3 Nos.
(16.)Ball Mill2 MT2 Nos.
(17.)Cooling Tower200 TR1 Nos.
(18.)SS/MS/CI Reactor5 KL10 Nos.
(19.)MS Rubber Lined Reactor20 KL3 Nos.
(20.)MS Rubber Lined Reactor10 KL3 Nos.
(21.)Filter Press48" x 48"4 Nos.
(22.)HDPE Tank10 KL3 Nos.
(23.)HDPE Tank40 KL2 Nos.
(24.)MS Tank50 KL2 Nos.
(25.)MS Blender10 MT2 Nos.
(26.)MS Blender5 MT2 Nos.
(27.)Ball Mill0.5 MT1 Nos.
(28.)Ice Crusher003 Nos.
(29.)Pulverizer003 Nos.
(30.)Boiler1 T/hr.1 Nos.
(31.)Hot Air Generator10 Lakhs kcal/hr1 Nos.
(32.)Thermic Fluid Heater25 Lakhs Kcal/hr.1 Nos.
(33.)Notch Filter3 KL2 Nos.
(34.)MS Tank20 KL3 Nos.
(35.)MSRL Reactor10 KL10 Nos.
(36.)Vacuum Trey Dryer200 Trey1 Nos.
(37.)Trey Dryer600 Trey1 Nos.
(38.)Chilling Plant200 TR1 Nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Dyes Intermediates(Chloranil,Ortho Amino Phenol ,Para Amino Phenol,Meta Amino Phenol ,Ortho Amino Phenol Sulphonic Acid etc.)150OthersMT/MonthRoad
(2.)Basic Dyes Solid50OthersMT/MonthRoad
(3.)Basic Dyes Liquid100OthersMT/MonthRoad
(4.)Acid Dyes,Direct Dyes,Reactive Dyes100OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NOT APPLICABLE
(vi)Application No. NOT APPLICABLE
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.017
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 153250
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 153250
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)As per attached sheet153250Tons per AnnumLocal MarketRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2019 To 31 Mar 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube26.612.924.2180
(2.)PM10Micro Gram per Meter Cube79.655.474.11100
(3.)PM2.5Micro Gram per Meter Cube48.431.844.5860
(4.)NOxMicro Gram per Meter Cube32.316.427.5880
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH unit7.97.38.58.5
(2.)TDSmg/l147111305002000
(3.)Chloridesmg/l6615182501000
(4.)TSSmg/l1050000
(5.)Fluoridemg/l0.750.651.01.5
(6.)Total Hardnessmg/l403294300600
    14.3.     No. of Surface Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.54.9A
(2.)BODmg/l105A
(3.)pHmg/l7.817.29A
(4.)CODmg/l2010A
    14.4.     No. of Ambient Noise monitoring locations : 09
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.550.975
(2.)Leq(Night)A-weighted decibels(dB(A))43.34070
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH Unit8.77.5
(2.)Electric ConductivityMillisiemens per Centimetre1.521.38
(3.)N(Nitrogen)Milligram per Kilogram134104
(4.)P(Phosphorus)Milligram per Kilogram7339
(5.)K(Potassium)Milligram per Kilogram246178
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater10300 Not Appliacble PipelineOthersBore well21-4/5265/GJ/IND/201924 Jul 2019103
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic7.500Soak PitOthersSoak Pit007.5
(2.)Industrial12500ETP-ROReuse within the Plant & Recycling,Others007550
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 132.5
(b)Total Discharged Water (Kilolitre per Day) 57.5
(c)Total Reused Water (Kilolitre per Day) 75
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1800Tons25RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Spent Sulfuric AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)9360Tons50RoadOthersReuse with in the process or sold to actual users.
(3.)Iron SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)624Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Acetic AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1248Tons50RoadOthersReuse within the process or sold to actual users.
(5.)Sodium BisulphiteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3120Tons50RoadOthersReuse within the process or sold to actual users
(6.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons50RoadOthersreturn back to supplier for regeneration.
(7.)Fly AshFly Ash1825Tons25RoadOthersSells to brick manufacturers
(8.)Calcium Thio sulphateHazardous Waste (as per Hazardous and Other Waste Management rules 2016)936Tons25RoadOtherssell to actual users under Haz. Waste rule.
(9.)Used Lubricating OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre25RoadAuthorized Recyclers
(10.)Discarded BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons25RoadAuthorized Recyclers
(11.)Discarded bags/linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons25RoadAuthorized Recyclers
(12.)HCl (20-22%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)624Tons50RoadOthersActual users under Haz. Waste rule.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube66.851.04.16171.012100
(2.)PM2.5Microgram per Meter Cube38.801.04.16142.96260
(3.)SO2Microgram per Meter Cube18.361.03.15421.51580
(4.)NOxMicrogram per Meter Cube221.01.70223.70280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam Boiler (2 TPH)Coal - 8 TPD210.450OthersPM, SO2, NOx75 mg/Nm3, 40 mg/nm3, 25 mg/nm3
(2.)Thermic Fluid heater (25 Lakhs Kcal/Hr)Coal 15 TPD300.500OthersPM, SO2, NOx80 mg/Nm3, 40 mg/Nm3, 30 mg/nm3
(3.)Reaction vessel of multi purpose plant--210.225SO230 mg/nm3
(4.)Steam Boiler (1 TPH)Coal - 4 TPD210.375OthersPM, SO2, NOx75 mg/Nm3, 40 mg/nm3, 25 mg/nm3
(5.)Hot Air Generator (10 lakhs Kcal/Hr)Coal 6 TPD300.450OthersPM, SO2, NOx80 mg/nm3, 40 mg/nm3, 30 mg/nm3
(6.)Hot Air generator (5 lakh Kcal/Hr)Coal 3 TPD210.375OthersPM, SO2, NOx80 mg/Nm3, 40 mg/nm3, 30 mg/nm3
(7.)D G set (500 KVA)Diesel - 100 liter/hr110.300OthersPM, SO2, NOx60 mg/nm3, 40 mg/nm3, 40 mg/nm3
(8.)Spray Dryer--150.450OthersPM35 mg/Nm3
(9.)Reaction vessel of chloranil--110.225OthersHCl15 mg/nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 0.5662
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 0.5662
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.025458
(b)Waste/Barren Land (ha.) 0.001645
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 0.000444
(e)Settlements (ha.) 00
(f)Industrial (ha.) 0.001709
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Public utilities & Facility, Rural, Transportation 0.002216
    Total (ha.) 0.031472
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.1000
(2.)Green belt0.1870
(3.)OthersRoad, parking0.1192Road, parking
(4.)Built Up Area0.1600Admin + Lab, Storage area, ETP, Utility area
Total (ha.) 0.5662
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNone within 10 Km00None within 10 Km
(2.)Critically Polluted AreaNone within 10 Km00None within 10 Km
(3.)NPANone within 10 Km00None within 10 Km
(4.)ESAsNone within 10 Km00None within 10 Km
(5.)ESZsNone within 10 Km00None within 10 Km
(6.)WLSNone within 10 Km00None within 10 Km
(7.)Wildlife CorridorsNone within 10 Km00None within 10 Km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 Km00None within 10 Km
(2.)Archaeological SitesNone within 10 Km00None within 10 Km
(3.)Defence InstallationsNone within 10 Km00None within 10 Km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.5662
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Village of chandarad village
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada Canal
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 00
(d)Temporary Employment- During Operation 00
(e)No. of working days 26
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1870
(b)Percentage of Total Project Area 330271.99
(c)No. of Plants to be Planted 470
(d)Funds Allocated for Plantation 5.0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAmit Patel
DesignationDirector
Name of Company (Applicant Name should not be given here)URMIT CHEMICALS PVT. LTD.
AddressSurvey no. 1384, Village: Rajpur, Tal.: Kadi, Dist: Mehsana, Gujarat