Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Cosmic Pigments & Intermediates (Unit-1)
(b)Name of the Company / Organisation COSMIC PIGMENTS AND INTERMEDIATES
(c)Registered Address Survey No. 202/6/p, sokhda, khambhat,, anand, gujarat,,Anand,Gujarat-388620
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jyantikumar Patel
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Ekta farm, at post sokhda, Tal. Khambhat, Anand, Gujrat,,Khambhat,Anand,Gujarat-388620
(d)Pin code 388620
(e)E-mail cosmic.ec2019@gmail.com
(f)STD Code. 261(f)Telephone No. 2413801
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/91048/2019
(d)Master Proposal Number(Single Window) SW/116874/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 202/6, paiky sokhada, khambhat, Anand
(b)Pincode 388620
(c)Bounded Latitudes (North)
From
Degree 22211155
Minutes
Second
From
Degree 22211219
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72352309
Minutes
Second
From
Degree 72352742
Minutes
Second
(e)Survey of India Topo Sheet No. F43G11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 22
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAnandKhambhat
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/24/2019-IA-II(I)
(b)Date of Apply of TOR 21 Jan 2019
(c)Date of Issue of TOR / Standard ToR 26 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :7
Khambhat Nagarpalika hall, 3rd floor, Stambhtirth complex, opp. tower, Khambhat, Ta: Khambhat, Di: Anand, Gujarat
State :Gujarat
District :Anand
Tehsil :Khambhat
Village :Khambhat
161No major issues were raised during public hearing instead the people had a welcoming attitude towards the proposed plant and the rise in local employment was addressed as the major reasonOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)DG set250 kVA * 2 nos.
(2.)steam boiler5 ton/hr.
(3.)Hot air generator200000 kcal
(4.)thermopack boiler200000 kcal
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Category - B: Solvent dyes200OthersTons per monthRoad
(2.)Category - A: Pigments1000OthersTons per monthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 100000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 100000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)H c l1000OthersTons per monthOPEN MARKETRoad60 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube78.8369.3578.83100
(2.)PM2.5Micro Gram per Meter Cube47.2841.3647.2860
(3.)SO2Micro Gram per Meter Cube12.678.5712.6780
(4.)NOxMicro Gram per Meter Cube17.5211.9417.5280
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l617.641102501000
(2.)Fluoridemg/l0.050.0511.5
(3.)TDSmg/l19204225002000
(4.)pHNA9.078.1068
(5.)TSSmg/l52250100
(6.)Total Hardnessmg/l976.9858.06300600
(7.)Heavy MetalsZincmg/l0.150.02515
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.517.89A
(2.)DOmg/l6.330.41A
(3.)BODmg/l1.01.0A
(4.)CODmg/l13.8911.24A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))754755
(2.)Leq(Night)A-weighted decibels(dB(A))693945
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram254
(2.)pH8.717.69
(3.)P(Phosphorus)Milligram per Kilogram4.451.26
(4.)K(Potassium)Milligram per Kilogram27.59.01
(5.)Electric ConductivityMillisiemens per Centimetre176
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 120 To 80
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 110 To 70
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3930Copy of Permission LetterPipelineTube Well21-4/4963/GJ/IND/201930 Mar 2019393
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial275275ETP, RO, MEE & ATFDOthersRe-use and losses2696
(2.)Domestic66Septic Tank & Soak pitOthersSoak pit06
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 281
(b)Total Discharged Water (Kilolitre per Day) 12
(c)Total Reused Water (Kilolitre per Day) 269
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used oilsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.600Kilolitre30RoadAuthorized Recyclers
(2.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)900Tons133RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)HCLHazardous Waste (as per Hazardous and Other Waste Management rules 2016)9600Tons0Pipe ConveyorOthersRe-use within premises
(4.)Sodium hypochlorideHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3840Tons0Pipe ConveyorOthersRe-use within premises
(5.)Fly ash from boilerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1440Tons60RoadCo-Processing
(6.)ETP dry sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)180Tons133RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Ammonium carbonateHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3600Tons0Pipe ConveyorOthersRe-use within premises
(8.)Discarded bad/ drums/ drumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1296Tons0RoadOthersRe-use within premises
(9.)Spent acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons0Pipe ConveyorOthersRe-use within premises
(10.)Spent solventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)96Tons0Pipe ConveyorOthersRe-use within premises
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube12.472.490.2312.7180
(2.)NOxMicrogram per Meter Cube16.852.490.0816.9480
(3.)PM10Microgram per Meter Cube78.832.490.4579.3100
(4.)PM2.5Microgram per Meter Cube47.282.490.4547.7460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam boilerBriquettes/coal320.3PM10150
(2.)Thermopack boilerBriquettes300.3PM10150
(3.)Hot air generatorPNG320.3PM10150
(4.)DG setHSD110.1PM10150
(5.)Spray dryerPNG150.2PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1200
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 kVA* 2 nos.
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.2
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 93.68
(b)Waste/Barren Land (ha.) 7.75
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1.58
(e)Settlements (ha.) 10
(f)Industrial (ha.) 0.75
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 14.6
(j)Others (ha.) : Scrubs, creek, railway etc 185.71
    Total (ha.) 314.07000000000005
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.369
(2.)Built Up Area0.5727
(3.)OthersRoads, Parking & open space0.2583
Total (ha.) 1.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area--0--
(2.)WLS--0--
(3.)NPA--0--
(4.)ESAs--0--
(5.)ESZs--0--
(6.)Corridors--0--
(7.)Wildlife Corridors--0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest--0--
(2.)Archaeological Sites--0--
(3.)Defence Installations--0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 45
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 5
(e)No. of working days 325
(f)Total Manpower 65
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.396
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 800
(d)Funds Allocated for Plantation 1200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCSR & CER
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay order against NABET/QCI
(ii)Name of the EIA Consultant M/s. Aqua-Air Environmental Engineers Pvt. Ltd.
(iii)Address M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJARAT)
(iv)Mobile No. 8155016995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Apr 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly peruse the observation made earlier. No reply is found, therefore, You are requested to submit the reply to the observations made. 30 Sep 2019
2.NAThe correction have been made as per the instruction received 01 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJyantikumar Patel
DesignationPartner
Name of Company (Applicant Name should not be given here)COSMIC PIGMENTS AND INTERMEDIATES
AddressSurvey No. 202/6/p, sokhda, khambhat,, anand, gujarat
Print