Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Tulsi Intermediates Pvt. Ltd.
(b)Name of the Company / Organisation TULSI INTERMEDIATES PVT. LTD.
(c)Registered Address S. no. 362 (Old S. No. 194/1), Opp. Ambica Chemicals, Villag: Sokhda, Ta.: Khambhat, Dist.: Anand,,Anand,Gujarat-388620
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhagyesh Bhatt
(b)Designation (Owner/ Partner/ CEO) Authorizedperson
(c)Address S.No.362/Old s.no.194/1, Opp. Ambica Chemical, Vaduchi mata road, Sokhda, Tal. Khambhat, Dist. Anand,,Khambhat,Anand,Gujarat-388620
(d)Pin code 388620
(e)E-mail sahed.shaikh@yahoo.com
(f)STD Code. 2698(f)Telephone No. 226874
(g)Fax No. 226876
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/116802/2019
(d)Master Proposal Number(Single Window) SW/116595/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No.362 (Old S. no. 194/1), Village: Sokhda,
(b)Pincode 388620
(c)Bounded Latitudes (North)
From
Degree 22.34972
Minutes
Second
From
Degree 22.35055
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.58777
Minutes
Second
From
Degree 72.58777
Minutes
Second
(e)Survey of India Topo Sheet No. F43G11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/12/2019-IA.II(I)
(c)Date of Issue of TOR 13 Feb 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 05 Sep 2019
(c)Date of Issue of EC 27 Dec 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :3.5
22 Gam Levuva Patidar Samaj ni wadi, Press road, khambhat, Anand.
State :Gujarat
District :Anand
Tehsil :Khambhat
Village :Khambhat
168Help to the nearby people, employment opportunity of local people, etc.OthersResident Additional collector & Additional district Magistrate, Anand
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. GPCB/CCA-AND-240(2)/ID-17690
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 3 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)4 Sulpho Hydrazone72330OthersMT/MonthRoad
(2.)PTPMP / PCEP / MNPT / PNBA / Sulpho OAVS / etc.006060OthersMT/MonthRoad
(3.)Para Nitro Toluene Ortho Sulphonic Acid3-30OthersMT/MonthRoad
(4.)4 Sulpho Phthalic Acid2-20OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)ScrubbersTwo stage Alkali (1 No.)Two Stage Alkali (1 No.)Two Stage Alkali (2 Nos.)
(2.)MS/RL/BL Dumping10 KL(2Nos.),12 KL(2Nos.),17KL(1No.), 6KL(1No.)10 KL(4Nos.),12 KL(6Nos.)10KL(6Nos.),12KL(8 Nos.),17KL(1No.),6KL(1No.)
(3.)Sulphonator Reactor-MS7 KL (2 Nos.), 3.5 KL (1 no.)7 KL (2 Nos.), 5 KL (1 no.)7 KL (4 Nos.), 3.5 KL (1 no.), 5 KL (1 no.)
(4.)Hydrolysis Vessels M.S.15 KL(1 No.)12 KL (1 No.)15 KL(1 No.) , 12 KL (1 No.)
(5.)Centrifuge36" (5 Nos.)36" (5 Nos.)36" (10 Nos.)
(6.)MS Tank25 KL (3 Nos.), 10KL (2 Nos.)25 KL (2 Nos.), 10KL (1 Nos.)25 KL (5 Nos.), 10KL (3 Nos.)
(7.)Blender0010 KL (2 Nos.)10 KL (2 Nos.)
(8.)Ball Mill0010 KL (2 Nos.)10 KL (2 Nos.)
(9.)Filter Nutch10 KL (2 Nos.)10 KL (4 Nos.)10 KL (6 Nos.)
(10.)Boiler0.8 THP (1 Nos.)000.8 THP (1 Nos.)
(11.)Hot Air Generator8 Lakhs Kcal/hr.(1 Nos.)008 Lakhs Kcal/hr.(1 Nos.)
(12.)Spray Dyer1000 Lit/hr. (1 Nos.)001000 Lit/hr. (1 Nos.)
(13.)HDPE Tank5 KL (4 Nos.)5 KL (4 Nos.)5 KL (8 Nos.)
(14.)Cooling Tower250 TR (1 No.)250 TR (1 No.)250 TR (2 Nos.)
(15.)Filter Press36" (1 No.)36" (1 No.)36" (2 Nos.)
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Jun 2016
(iv)Valid Upto 17 Nov 2020
(v)File No. GPCB/CCA-AND-240(2)/ID-17690
(vi)Application No. 100577
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.27
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1921.44
(b)Existing quantity of raw material/fuel 126.15
(c)Total quantity of raw material/fuel 2047.5900000000001
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)As per attached sheet2047.59Tons per AnnumLocal MarketRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2019 To 31 Mar 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube80.456.476.48100
(2.)PM2.5Micro Gram per Meter Cube51.932.846.5860
(3.)NOxMicro Gram per Meter Cube22.512.519.8680
(4.)SO2Micro Gram per Meter Cube21.210.517.8580
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l1050000
(2.)Fluoridemg/l0.70.461.01.5
(3.)pHOtherspH Unit7.757.378.58.5
(4.)Total Hardnessmg/l994507300600
(5.)Chloridesmg/l26237712501000
(6.)TDSmg/l515716195002000
    14.3.     No. of Surface Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l255A
(2.)pHmg/l7.827.36A
(3.)DOmg/l6.84.6A
(4.)BODmg/l105A
    14.4.     No. of Ambient Noise monitoring locations : 09
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))54.740.970
(2.)Leq(Day)A-weighted decibels(dB(A))57.651.875
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram161131
(2.)P(Phosphorus)Milligram per Kilogram5132
(3.)pHOtherspH Unit7.907.24
(4.)K(Potassium)Milligram per Kilogram346194
(5.)Electric ConductivityMillisiemens per Centimetre1.541.46
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3500Copy of Permission LetterPipelineOthersBore well21-4/4941/GJ/IND/201929 Mar 201935
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2.55Soak PitOthersSoak Pit02.5
(2.)Industrial35.040.0ETP-RO-SDOthersZLD2015
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 37.5
(b)Total Discharged Water (Kilolitre per Day) 17.5
(c)Total Reused Water (Kilolitre per Day) 20
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spray Dryer SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)192Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Liners / BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons25RoadAuthorized Recyclers
(3.)Spent H2SO4 (70-75%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)6000Kilolitre15RoadOthersSold to actual user
(4.)Sodium bisulfite (40-45 %)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)2184Kilolitre25RoadOthersSold to actual user
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Kilolitre50RoadAuthorized Recyclers
(7.)Discarded Drums/ BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1250Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube14.111.411.0615.1880
(2.)NOxMicrogram per Meter Cube16.261.410.66516.9380
(3.)PM10Microgram per Meter Cube69.801.411.54971.350100
(4.)PM2.5Microgram per Meter Cube41.611.411.54943.1660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Reaction Vessel 1 - Exisiting--110.300SO225 mg/nm3
(2.)Reaction vessel 2, proposed--110.300OthersSO2, NOx25 mg/nm3, 20 mg/Nm3
(3.)Boiler (0.8 TPH)Bio coal/ Coal - 4.5 TPD150.375OthersPM, SO2, Nox110 mg/nm3, 30 mg/Nm3,
(4.)Spray Dryer (1000 Liter/Hr)Bio Coal/Coal - 4.0 TPD150.450OthersPM, SO2, NOx45 mg/nm3, 20 mg/nm3, 15 mg/nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Not Applicable
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 0.3500
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 0.3500
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 0.00018
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.00090
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.00041
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Residential, crop land, etc 0.02999
    Total (ha.) 0.03148
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.080
(2.)Green belt0.1155
(3.)OthersInternal Road, Open Area0.054
(4.)Built Up Area0.1005utilities, storage area, etc
Total (ha.) 0.35
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone within 10 Km00None within 10 Km
(2.)CorridorsNone within 10 Km00None within 10 Km
(3.)Wildlife CorridorsNone within 10 Km00None within 10 Km
(4.)Critically Polluted AreaNone within 10 Km00None within 10 Km
(5.)WLSNone within 10 Km00None within 10 Km
(6.)ESAsNone within 10 Km00None within 10 Km
(7.)ESZsNone within 10 Km00None within 10 Km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 Km00None within 10 Km
(2.)Archaeological SitesNone within 10 Km00None within 10 Km
(3.)Defence InstallationsNone within 10 Km00None within 10 Km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.35
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 11
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 00
(e)No. of working days 26
(f)Total Manpower 26
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4107451155
(2.)Percentage of Total Project Area122133
(3.)No. of Plants102187289
(4.)Funds Allocated3000070000100000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation, CSR activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhagyesh Bhatt
DesignationAuthorizedperson
Name of Company (Applicant Name should not be given here)TULSI INTERMEDIATES PVT. LTD.
AddressS. no. 362 (Old S. No. 194/1), Opp. Ambica Chemicals, Villag: Sokhda, Ta.: Khambhat, Dist.: Anand
Print