1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Insecticides India Limited | (b)Name of the Company / Organisation | INSECTICIDES INDIA LIMITED | (c)Registered Address | E-442,443 & 444, RIICO Industrial Area, Chopanki, Tal: Bhiwadi, Dist: Alwar,,Alwar,Rajasthan-301707 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mukesh Kumar | (b)Designation (Owner/ Partner/ CEO) | GeneralManager | (c)Address | E-442,443,444, RIICO Industrial Area, Chopanki, Bhiwadi, Alwar, Rajasthan,,Alwar,Alwar,Rajasthan-301707 | (d)Pin code | 301707 | (e)E-mail | mukeshiilindia@gmail.com | (f)STD Code. | 1493(f)Telephone No. | 298189 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/IND2/116690/2019 | (d)Master Proposal Number(Single Window) | SW/116684/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. E-442, 443 & 444 | (b)Pincode | 301707 | (c)Bounded Latitudes (North) | | From | | Degree | 28.152 | Minutes | | Second | | From | | Degree | 28.153 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.877 | Minutes | | Second | | From | | Degree | 76.878 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53 D/12, 53 D/15 & 53 D/16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 283 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 30 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/63/2009-IA-11(1) | (c)Date of Issue of TOR | 18 Feb 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 30 Sep 2019 | (c)Date of Issue of EC | 17 Aug 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Located in Notified Industrial area of RIICO, Chop | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | IV/ENV/R/Ind-107/740/2005/322 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 29 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Capacity | 1800 | 7550 | 9350 | Tons per Annum(TPA) | | Road | | (2.) | Area | 1.1958 | 0 | 1.1958 | Hectares(ha) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Nutsche Filter | 2 | 2 | 4 | 5 KL | (2.) | Pulverizer | 1 | 0 | 1 | 100 Kg/hr | (3.) | S. S. Reactor | 8 | 9 | 17 | Capacity 10 KL | (4.) | Glass line reactor | 3 | 5 | 8 | Capacity 5 KL | (5.) | M S Reactor | 1 | 1 | 2 | Capacity 5 KL | (6.) | Centrifuge SS Basket | 2 | 2 | 4 | 48" Dia | (7.) | SS tanks | 42 | 30 | 72 | Capacity 2-5 KL | (8.) | Glass lined tanks | 15 | 20 | 35 | Capacity 2-5 KL | (9.) | Ejectors | 11 | 10 | 21 | NA | (10.) | Sparkle filter | 3 | 5 | 8 | NA | (11.) | Glass line reactor | 5 | 9 | 14 | Capacity 6.3 KL | (12.) | Agitated nutsche filter drier | 4 | 6 | 10 | Capacity 5 KL | (13.) | RVD | 3 | 6 | 9 | Capacity 1 to 5 KL | (14.) | S. S. Reactor | 13 | 13 | 26 | Capacity 6 KL | (15.) | S. S. Reactor | 6 | 6 | 12 | Capacity 5 KL | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 Jan 2016 | (iv)Valid Upto | 31 May 2018 | (v)File No. | F(PLG)/Alwar(Alwar)/36(1)/2015-2016/6316-6318 | (vi)Application No. | 2015-2016/PDF/21 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 45.6708 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 9.4337 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.2010 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 9.4337 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 9250 | (b)Existing quantity of raw material/fuel | 22500 | (c)Total quantity of raw material/fuel | 31750 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Toluene | 369.3 | Tons per Annum | | Nearby area | Road | | 8 | Others | Raw material | Copy of Linkage | (2.) | Methanol | 738.9 | Tons per Annum | | Nearby area | Road | | 9 | Others | Raw material | Copy of Linkage | (3.) | Wood | 3 | Others | MT/hr | Nearby area | Road | | 7 | Fuel Supply Agreement | | Copy of Linkage | (4.) | diesel | 85 | Others | Lit./hr | Nearby area | Road | | 8 | Fuel Supply Agreement | | Copy of Linkage | (5.) | Briquettes | 12 | Others | MT/Day | Nearby area | Road | | 8 | Fuel Supply Agreement | | Copy of Linkage | (6.) | ethyl alcohol | 756 | Tons per Annum | | Nearby area | Road | | 8 | Others | Raw material | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 11.09 | 1.4 | 10.04 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58.33 | 36.92 | 45.18 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 15.59 | 6.09 | 12.08 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 99.18 | 62.12 | 72.15 | 100 | (5.) | Others | O3 | Micro Gram per Meter Cube | 21.95 | 12.34 | 18.42 | 100 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 25 | 2 | 50 | 100 | (2.) | Total Hardness | | | mg/l | | 428 | 120 | 300 | 600 | (3.) | Fluoride | | | mg/l | | 1.49 | 0.31 | 1 | 1.5 | (4.) | Others | Sulfates | | mg/l | | 30.39 | 5.78 | 200 | 400 | (5.) | pH | | | NA | | 7.69 | 6.93 | 6.5 | 8.5 | (6.) | TDS | | | mg/l | | 946 | 480 | 500 | 2000 | (7.) | Chlorides | | | mg/l | | 234 | 18 | 250 | 1000 | (8.) | Heavy Metals | | Zinc | mg/l | | 6.02 | 0.11 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 0 | 0 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | DO | | mg/l | | 0 | 0 | A | (4.) | COD | | mg/l | | 0 | 0 | A | (5.) | Others | Chlorides | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 74.9 | 46.7 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 64.8 | 31.1 | 65 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.66 | 7.32 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 23 | 2.3 | (3.) | K(Potassium) | Milligram per Kilogram | | 1 | 0.01 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 51 | 42 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 1.1 | 0.02 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 50 To 75 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 60 To 85 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | RIICO Water Supply | 188 | 8 | Copy of Permission Letter | Pipeline | | Others | Pipeline | R.M./(WS)/BWD/5338 | 14 Oct 2005 | 188 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial & Domestic | 136 | 136 | ETP & MEE | Reuse within the Plant & Recycling,Others | Re-use in plant premises | 132 | 4 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 136 | (b)Total Discharged Water (Kilolitre per Day) | 4 | (c)Total Reused Water (Kilolitre per Day) | 132 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1080 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Incineration Ash | Industrial Waste | | 16 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Drums & Containers, Bags & Liners | Industrial Waste | | 21 | Tons | 18 | Road | | Authorized Recyclers | | (4.) | Process Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 399.3 | Tons | 8 | Road | | Others | Incineration or CHWIF of UCCI, Udaipur | (5.) | Used Lubrication Oil | Industrial Waste | | 1.45 | Tons | 15 | Road | | Authorized Recyclers | | (6.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 47.5 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 13.76 | 0.38 | 0.0 | 13.77 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 69.4 | 0.38 | 0.75 | 70.2 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 38.7 | 0.38 | 0.4 | 39.11 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 8.35 | 0.38 | 0.009 | 8.4 | 80 | (5.) | Others(Specify) | HBr | Microgram per Meter Cube | 0.000 | 0.38 | 0.007 | 0.008 | -- | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set (3 Nos.) | Diesel | 6 | 0.15 | SO2 | | 262 | (2.) | DG Set (3 Nos.) | Diesel | 6 | 0.15 | NOx | | 94 | (3.) | Boiler (2 TPH) | Wood | 30 | 1 | PM10 | | 150 | (4.) | Boiler (2 TPH) | Wood | 30 | 1 | SO2 | | 262 | (5.) | Boiler (2 TPH) | Wood | 30 | 1 | NOx | | 94 | (6.) | DG Set (3 Nos.) | Diesel | 6 | 0.15 | PM10 | | 150 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 860 | (b)Source | JVVNL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | DG Set * 3 Nos. | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.1958 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.1958 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 18810.22 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 89.28 | (e)Settlements (ha.) | 6996.04 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 5146.36 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Scrubland | 373.6 | Total (ha.) | 31415.5 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.4260 | | (2.) | Green belt | | 0.4 | | (3.) | Others | Open Area | 0.24 | | (4.) | Built Up Area | | 0.1298 | ETP & Utility area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | NA | (2.) | Critically Polluted Area | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | NPA | NA | 0 | NA | (5.) | WLS | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Others | NA | NA | 0 | NA | (4.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.1958 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 160 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 160 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 4000 | 0 | 4000 | (2.) | Percentage of Total Project Area | 33.45 | 0 | 33.45 | (3.) | No. of Plants | 1000 | 0 | 1000 | (4.) | Funds Allocated | 2000000 | 0 | 2000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Provision of employment to nearby people | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against QCI NABET | (ii)Name of the EIA Consultant | Aqua-Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat- 395002 | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 12 Feb 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | May kindly peruse the certified compliance report submitted by regional office. There are certain non-compliance and observations pointed out by the regional office. You are requested to to submit action taken report on the observations of the Regional officer | 30 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 30 Sep 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Report from SPCB, Rajasthan regarding factual status of the project is obtained and is attached as Additional Document. | 28 Jul 2020 | 2. | ADS Reply Letter | Report from SPCB, Rajasthan regarding factual status of the project is obtained and is attached as Additional Document. | 28 Jul 2020 | 3. | NA | The Proposal of EC was considered by the EAC in its meeting held during November 20-22, 2019 & January 21-23, 2020. The matter was examined in the Ministry and it is noted that the CPCB has visited the unit on January 11th 2020 and verified all the relevant documents along
with EMS compliance. The Committee deliberated the CPCB repot and found in order. However the
report from SPCB is still awaited. In view of the above, SPCB, Rajasthan is kindly requested to provide the report for further necessary action by the Ministry. | 05 Apr 2020 | 4. | NA | The Proposal of EC was considered by the EAC in its meeting held during November 20-22, 2019 & January 21-23, 2020. The matter was examined in the Ministry and it is noted that the CPCB has visited the unit on January 11th 2020 and verified all the relevant documents along
with EMS compliance. The Committee deliberated the CPCB repot and found in order. However the
report from SPCB is still awaited. In view of the above, SPCB, Rajasthan is kindly requested to provide the report for further necessary action by the Ministry. | 05 Apr 2020 | 5. | ADS Reply Letter | Additional Details Sought, Revised Form-2 & EIA Report which conforms to Appendix-III of the EIA Notification, 2006 is attached as additional document. | 06 Jan 2020 | 6. | NA | The EAC, during deliberations noted that the project details mentioned in the EIA
report were not consistent with that presented during the meeting. The EAC, after detailed
deliberations has asked for clarification/inputs, in respect of the following:-
(i) EIA report to be revised as per the terms of reference granted for the project, and shall
conform to Appendix III of the EIA Notification, 2006.
(ii) EAC noted that PP has not submitted adequately TOR compliance and PP needs to be
resubmit the TOR compliance adequately.
(iii) Action plan in view of the project site being in Critically Polluted Area.
(iv) PP needs to prepare the species specific conservation plan for schedule-I species along
with budgetary allocation and PP to take approval for the Wildlife conservation and
management plan from CWLW State Government.
(v) Details of courts/NGT cases, if any, on the project area or against the project
proponent.
(vi) Details of existing production with supporting documents.
(vii) Considering complaint against the project proponent regarding production without prior
permission, pollution etc, report from SPCB and CPCB on the factual status.
(viii) Revised water balance with details of total water and fresh water requirement, and
permission from concerned regulatory authority.
(ix) Effluent treatment mechanism with plan for Zero Liquid Discharge.
(x) Onsite emergency plan as per MSIHC Rules.
The proposal was accordingly deferred for the needful. | 10 Dec 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mukesh Kumar | Designation | GeneralManager | Name of Company (Applicant Name should not be given here) | INSECTICIDES INDIA LIMITED | Address | E-442,443 & 444, RIICO Industrial Area, Chopanki, Tal: Bhiwadi, Dist: Alwar |
|