(a)Name of the project(s) Neogen Chemicals Ltd
(b)Name of the Company / Organisation NEOGEN CHEMICALS LIMITED
(c)Registered Address 1002, 10th floor, Dev Corporate Bldg, Pokharan Road no 2Khopat, Thane -400601, Maharastra.,,Thane,Maharashtra-400601
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HARIN HARISH KANANI
(b)Designation (Owner/ Partner/ CEO) ExecutiveDirector
(c)Address 1002, 10th floor, Dev Corporate Bldg, Pokharan Road no 2Khopat, Thane -400601, Maharastra.,,Thane,Thane,Maharashtra-400601
(d)Pin code 400601
(e)E-mail zld.dahej@neogenchem.com
(f)STD Code. 22(f)Telephone No. 25497337
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/100557/2019
(d)Master Proposal Number(Single Window) SW/116499/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. Z/109, SEZ Dahej
(b)Pincode 392110
(c)Bounded Latitudes (North)
From
Degree 21.680686
Minutes
Second
From
Degree 21.682869
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.545039
Minutes
Second
From
Degree 72.547158
Minutes
Second
(e)Survey of India Topo Sheet No. F43M10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagra
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/117/2019-IA-II(I)
(b)Date of Apply of TOR 27 Mar 2019
(c)Date of Issue of TOR / Standard ToR 28 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Neogen Chemicals Ltd will be situated at Dahej-SEZ
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Cooling plant1000 TR and 600 TR2 nos
(2.)Boiler2 TPH each3 nos
(3.)D G set250 kva each3 nos
(4.)Chilling plant250 TR1 nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bromination of Organic Acids and Esterification3500Tons per AnnumRoad
(2.)Grignards Formation from Organic Halidesication1000Tons per AnnumRoad
(3.)Addition of Halogen and Halogen Acids across Double BondsO<2500Tons per AnnumRoad
(4.)Bromination and Chlorination of Alcohols3500Tons per AnnumRoad
(5.)Dehydrohalogenation of Organic Halides with or without functional Group1000Tons per AnnumRoad
(6.)2-Cyclopropyl 6-Methyl Phenol60Tons per AnnumRoad
(7.)R&D600Tons per AnnumRoad
(8.)Halogen Exchange Reactions2000Tons per AnnumRoad
(9.)Bromination or Chlorination of Cyclic and Aromatic Compounds with or Without Functional Groups2500Tons per AnnumRoad
(10.)Advance Intermediates from Category 1 to 7ation2000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 18660
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 18660
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)attached as pdf18660Tons per AnnumlocalRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube23.510.918.680
(2.)NOxMicro Gram per Meter Cube27.713.322.280
(3.)PM10Micro Gram per Meter Cube83.558.876.8100
(4.)PM2.5Micro Gram per Meter Cube45.628.339.860
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l284511612501000
(2.)TSSmg/l161000
(3.)Fluoridemg/l0.580.511.5
(4.)TDSmg/l534228305002000
(5.)pHmg/l7.97.36.58.5
(6.)Total Hardnessmg/l1207362300600
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.97.3A
(2.)DOmg/l5.94.6B
(3.)BODmg/l19.311.4D
(4.)CODmg/l40.624.2D
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.245.175
(2.)Leq(Night)A-weighted decibels(dB(A))50.539.270
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram339175
(2.)P(Phosphorus)Milligram per Kilogram6212
(3.)Electric ConductivityOthersdS/m5.34.7
(4.)N(Nitrogen)Milligram per Kilogram131116
(5.)pH8.37.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC supply5224Copy of Permission LetterPipelineOthersGIDC supplyNCL/2014/906/46412 Apr 2018522
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC4040STPGreen Belt Renewal Plant40
(2.)INDUSTRIAL173200ETPDischarge into Seawater Body173
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 213
(b)Total Discharged Water (Kilolitre per Day) 173
(c)Total Reused Water (Kilolitre per Day) 40
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons75RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Process/distillation residueantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)13200Tons75RoadOthersdisposal at CHWIF or co-processing?
(3.)Used Lubricating Oil residueantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1Kilolitre45RoadAuthorized Recyclers
(4.)Discarded containers/ barrels/ linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)906Tons55RoadAuthorized Recyclers
(5.)Spent H2SO4Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1560Tons75RoadOtherssold to actual end users under Haz Waste Rules 9.
(6.)Sodium hypochloriteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)312Tons75RoadOtherssold to actual end users under Haz Waste Rules 9.
(7.)Liquor of HBr (<30%)residueantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)8112Tons75RoadOtherssold to actual end users under Haz Waste Rules 9.
(8.)Acetic acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons75RoadOtherssold to actual end users under Haz Waste Rules 9.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.51.411.4972100
(2.)NOxMicrogram per Meter Cube18.81.410.7219.680
(3.)PM2.5Microgram per Meter Cube34.91.411.4936.460
(4.)SO2Microgram per Meter Cube15.41.411.216.780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D G set (250 KVA each x 3 nos)Diesel210.5OthersSPM, SO2, NOx00
(2.)Halogen Specific Reaction Plant (4 nos)none160.375OthersHBr, HCl, Br2, Cl200
(3.)Boiler (3 nos.) (2 TPH each)PNG/FO400.6OthersSPM, SO2, NOx00
(4.)Work place area (2 nos)none160.375OthersHBr, HCl, Br200
(5.)Common Reaction & Multi-purpose Plant (4 nos)none160.375OthersHBr, HCl, Br2, Cl2, SO200
(6.)Bromine scrubbernone160.375OthersHBr, Br200
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source Dakshin Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) (3 nos of 250 kVA each)
(e)Stack Height (in m) 21
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 5
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1296
(b)Waste/Barren Land (ha.) 3521
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 24106
(e)Settlements (ha.) 478
(f)Industrial (ha.) 1852
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Transportation 192
    Total (ha.) 31445
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.65
(2.)Main Plant0.98
(3.)Built Up Area0.81Admin, Utilities, Tanks farms, ETP etc
(4.)OthersInternal Roads, Parking & Margin1.56Internal Roads, Parking & Margin
Total (ha.) 5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNONE WITHIN 10 KM00NONE WITHIN 10 KM
(2.)ESZsNONE WITHIN 10 KM00NONE WITHIN 10 KM
(3.)WLSNONE WITHIN 10 KM00NONE WITHIN 10 KM
(4.)NPANONE WITHIN 10 KM00NONE WITHIN 10 KM
(5.)ESAsNONE WITHIN 10 KM00NONE WITHIN 10 KM
(6.)Wildlife CorridorsNONE WITHIN 10 KM00NONE WITHIN 10 KM
(7.)CorridorsNONE WITHIN 10 KM00NONE WITHIN 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNONE WITHIN 10 KM00NONE WITHIN 10 KM
(2.)Archaeological SitesNONE WITHIN 10 KM00NONE WITHIN 10 KM
(3.)Defence InstallationsNONE WITHIN 10 KM00NONE WITHIN 10 KM
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Lakhigam, Ambheta, Jageshwar ponds
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Estuary of Narmada river
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 250
(e)No. of working days 300
(f)Total Manpower 350
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.65
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 3188
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCER and Employment
(2.)FinancialTax payment to govt
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd.
(iii)Address 424, Medicine Market, Paldi Cross Road, Ahmedabad-380006, Gujarat??SWVD8????
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHARIN HARISH KANANI
DesignationExecutiveDirector
Name of Company (Applicant Name should not be given here)NEOGEN CHEMICALS LIMITED
Address1002, 10th floor, Dev Corporate Bldg, Pokharan Road no 2Khopat, Thane -400601, Maharastra.
Print