1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Insecticides India Limited (Unit-II) | (b)Name of the Company / Organisation | INSECTICIDES INDIA LIMITED (UNIT- II) | (c)Registered Address | Plot No. D3/1, Dahej GIDC estate, Village: Dahej, Ta.: Vagra, Dist. : Bharuch,,Bharuch,Gujarat-392130 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajesh Aggarwal | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | Plot No. D3/1, Dahej GIDC Estate, Village - Dahej, Ta-Vagra, Bharuch,,Vagra,Bharuch,Gujarat-392130 | (d)Pin code | 392130 | (e)E-mail | dr@iilindia.co.in | (f)STD Code. | 11(f)Telephone No. | 27679700 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/75306/2018 | (d)Master Proposal Number(Single Window) | SW/116010/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. D3/1, GIDC Estate, Dahej, Tehsil: Vagra, | (b)Pincode | 392130 | (c)Bounded Latitudes (North) | | From | | Degree | 21.72416 | Minutes | | Second | | From | | Degree | 21.72722 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.60250 | Minutes | | Second | | From | | Degree | 72.60611 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 10 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 25 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Bharuch | Vagra | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/192/2018-IA-II(I) | (b)Date of Apply of TOR | 05 Jun 2018 | (c)Date of Issue of TOR / Standard ToR | 09 Jul 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public Hearing is exempted in our case as our unit | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SS-316 Reactor | 15 KL | 2 nos. | (2.) | SS-316 Heat exchangers | 5 sqm | 19 nos. | (3.) | Graphite Heat exchangers | 20 sqm | 10 nos. | (4.) | SS-316 FBD | 200 Kg | 1 nos. | (5.) | SS-316 Sparkler filter | 1.5 sqm | 3 nos. | (6.) | SS-316 Centrifugal pump | 5 m3/hr | 14 nos. | (7.) | AODD pump, PP | 2 m3/hr | 2 nos. | (8.) | Stage Vac. System with 2 steam + 1 water jet | 4 torr | 5 nos. | (9.) | MS Storage tank | 25 KL | 6 nos. | (10.) | CS centrifugal pump | 5 m3/hr | 6 nos. | (11.) | HCl Scrubber | 100 kg/hr | 1 nos. | (12.) | HBr Scrubber | 100 kg/hr. | 1 nos. | (13.) | Vent gas scrubber | 500 CFM | 2 nos. | (14.) | Material Lift | 2 Tons | 2 nos. | (15.) | Boiler | 8 T/hr | 2 nos. | (16.) | Chilled brine plant with pumps | 100 TR | 2 nos. | (17.) | Boiler Feed Water softener plant | 15 TPH | 1 nos. | (18.) | RO | 7.5 m³/hr | 1 nos. | (19.) | MS Glass Lined Reactor | 3 KL | 3 Nos. | (20.) | PP Centrifugal pump | 5 m3/hr. | 6 nos. | (21.) | D.G. set | 1000 KVA | 1 nos. | (22.) | RO | 25 m³/hr | 1 nos. | (23.) | SS-316 Reactor | 3 KL | 2 Nos. | (24.) | SS-316 Falling film evaporator | 8 sqm | 2 nos. | (25.) | SS-316 Heat exchangers | 25 sqm | 2 nos. | (26.) | SS-316 Heat exchangers | 20 sqm | 5 nos. | (27.) | SS-316 Receiver | 3 KL | 8 nos. | (28.) | SS-316 Heat exchangers | 15 sqm | 10 nos. | (29.) | SS-316 Agitated Nutsch Filter | 2 KL | 8 nos | (30.) | CS centrifugal pump | 5 m3/hr. | 14 nos. | (31.) | SS-316 Receiver | 1 KL | 6 nos. | (32.) | SS-316 Receiver | 2 KL | 6 nos. | (33.) | SS-316 Receiver | 4 KL | 2 nos. | (34.) | MSGL Receiver | 1 KL | 9 nos. | (35.) | PP Centrifugal pump | 5 m3/hr. | 8 nos. | (36.) | HDPE Storage tank | 10 KL | 6 nos. | (37.) | PP Centrifugal pump | 5 m3/hr. | 3 nos. | (38.) | PP Centrifugal pump | 25 m3/hr. | 2 nos. | (39.) | SS-316 Centrifuge | 48" | 2 nos. | (40.) | Cooling tower with pumps | 750 TR | 2 nos. | (41.) | Chilled Water Plant with pumps | 150 TR | 2 nos. | (42.) | Nitrogen Plant | 200 m3/hr | 1 nos. | (43.) | Compressed Air | 100 m3/hr | 1 nos. | (44.) | MEE | 12.5 m³/hr. | 1 nos. | (45.) | ETP | 400 KL, 125 KL | 1 nos. | (46.) | SS-316 Reactor | 6.3 KL | 10 nos. | (47.) | SS-316 Reactor | 10 KL | 3 nos. | (48.) | SS-316 Heat exchangers | 10 sqm | 2 nos. | (49.) | SS-316 Agitated Nutsch filter dryer | 5 KL | 1 nos. | (50.) | SS-316 Rotary vacuum dryer | 4 KL | 2 nos. | (51.) | 2 Stage Vac. System with 1 steam + 1 water jet | 10 torr | 13 nos. | (52.) | TFH | 10 lac K Cal/hr | 1 nos. | (53.) | Cooling tower with pumps for CHW & CHBR | 350 TR | 1 nos. | (54.) | MS Glass Lined Reactor | 6.3 KL | 4 Nos. | (55.) | SS-316 Reactor | 1.5 KL | 2 nos. | (56.) | SS-316 Distillation Column | 500 mm dia x 10000 mm height | 4 nos. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Herbicides(Bispyribac sodium, Diuron, Glufosinate ammonium, Pyribenzoxim, Cyhalofop-butyl, Clordinafop-propargyl, Cloquintocet-mexyl, Tembotrione, Pinoxaden, Penoxsulam, Chlorimuron-ethyl, Fomesafe | 625 | Others | MT/Month | Road | | (2.) | Insecticides(Diafenthiuron,Thiocyclam oxalate,Dinotefuran,Pymetrozine,Chloranthraniliprole,Cyantraniliprole,Ethiprole, Flubendiamide,Flonicamid,Spirotetramat,Cyenopyrafen,Profenofos,Thiamethoxam, Fen | 625 | Others | MT/Month | Road | | (3.) | Intermediate Chemicals(Lambda acid,Bifenthrin alcohol,3-Methyl-4-nitroimino perhydro 1,3,5-oxadiazine (MNIO),2-(Nitroimino) Imidazolidine (NII),2-Chloro-5-(Chloromethyl) Thiazole (CCMT),Phenyl 4,6-dim | 1000 | Others | MT/Month | Road | | (4.) | Fungicides (Pyraclostrobin, Kresoxim methyl, Trifloxystrobin, Cyazofamid, Dimethomorph, Boscalid, Metrafenone, Carbendazim, Myclobutanil,Copper Oxychloride, Cuprus chloride,Cuprous oxide,Azoxystrobin) | 250 | Others | MT/Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 Aug 2019 | (iv)Valid Upto | 28 Aug 2019 | (v)File No. | NOT APPLICABLE | (vi)Application No. | NOT APPLICABLE | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 40 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3.50 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.80 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.4 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 54600 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 54600 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | As per attached sheet | 54600 | Tons per Annum | | Local Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 45.6 | 28.3 | 40.74 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 24.3 | 11.3 | 20.99 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 32.6 | 14.2 | 24.79 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 86.2 | 58.8 | 78.59 | 100 | |
14.2. No. of Ground Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0.81 | 0.50 | 1.0 | 1.5 | (2.) | Chlorides | | | mg/l | | 1507 | 1068 | 250 | 1000 | (3.) | Total Hardness | | | mg/l | | 755 | 610 | 300 | 600 | (4.) | pH | | | Others | pH Unit | 7.67 | 7.19 | 8.5 | 8.5 | (5.) | Heavy Metals | | Iron | mg/l | | 0.41 | 0.21 | 0.3 | 1 | (6.) | TSS | | | mg/l | | 10 | 5 | 0 | 0 | (7.) | TDS | | | mg/l | | 2975 | 2339 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 04 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 10 | 5 | A | (2.) | DO | | mg/l | | 5.1 | 4 | A | (3.) | pH | | Others | pH Unit | 8.07 | 7.79 | A | (4.) | COD | | mg/l | | 20 | 5 | A | |
14.4. No. of Ambient Noise monitoring locations : 09 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.2 | 39.3 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 57 | 49.7 | 75 | |
14.5. No. of Soil Sample Monitored locations : 08 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | pH unit | 8.17 | 7.55 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 161 | 118 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 89 | 65 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 1.52 | 1.44 | (5.) | K(Potassium) | Milligram per Kilogram | | 159 | 82 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5 To 8 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water | 253 | 2 | Not Appliacble | Pipeline | | Others | GIDC water supply | GIDC/DM/CG/ALT/1912 | 18 Nov 2014 | 253 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 503 | 550 | ETP-RO-MEE | Reuse within the Plant & Recycling,Others | ZLD | 497 | 6 | (2.) | Domestic | 12 | 20 | STP | Green Belt Renewal Plant | | 12 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 515 | (b)Total Discharged Water (Kilolitre per Day) | 6 | (c)Total Reused Water (Kilolitre per Day) | 509 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 900 | Tons | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1380 | Tons | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Discarded Container | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30000 | Tons | 25 | Road | | Authorized Recyclers | | (4.) | Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1200 | Tons | 25 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Discarded Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18 | Tons | 25 | Road | | Authorized Recyclers | | (6.) | Distillation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3300 | Tons | 25 | Road | | Co-Processing | | (7.) | Used Lubricating oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.0 | Kilolitre | 25 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 72.18 | 2.0 | 1.697 | 73.88 | 100 | (2.) | NOx | | Microgram per Meter Cube | 21.09 | 2.0 | 0.844 | 21.935 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 35.81 | 2.0 | 1.697 | 37.51 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 17.44 | 1.0 | 2.081 | 19.522 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Thermic Fluid Heater (10 Lakhs Kcal/Hr) | Furnace Oil | 21 | 0.375 | Others | SPM, SO2, NOx | 75 mg/Nm3, 40 mg/Nm3, 35 mg/nm3 | (2.) | Boiler (8 TPH)- 2 Nos. | Furnace Oil | 41 | 0.540 | Others | SPM, SO2, NOx | 75 mg/Nm3, 40 mg/Nm3, 35 mg/Nm3 | (3.) | Reaction / Process Vessels (3 sets) | -- | 15 | 0.300 | Others | HCl | 15 mg/Nm3 | (4.) | D G Set (1000 KVA) | Diesel | 11 | 0.300 | Others | SPM, SO2, NOx | 65 mg/Nm3, 30 mg/Nm3, 40 mg/Nm3 | (5.) | Reaction / Process vessel (5 sets ) | -- | 15 | 0.300 | Others | HCl, SO2 | 15 mg/Nm3, 30 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1500 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1000 KVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 5.2 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 5.2 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.00898 | (b)Waste/Barren Land (ha.) | 0.00403 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 0.00935 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 0.00331 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Mining, Mixed Urban, Public Utilities & Facility, | 0.00575 | Total (ha.) | 0.031420000000000003 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.7725 | Process plant 1 & 2 | (2.) | Green belt | | 1.7160 | | (3.) | Built Up Area | | 1.7615 | admin bldg., ETP area, RM & FG ware house, etc. | (4.) | Others | Internal Road, parking & margin | 0.9500 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None within 10 Km | 00 | None within 10 Km | (2.) | Wildlife Corridors | None within 10 Km | 00 | None within 10 Km | (3.) | WLS | None within 10 Km | 00 | None within 10 Km | (4.) | ESAs | None within 10 Km | 00 | None within 10 Km | (5.) | ESZs | None within 10 Km | 00 | None within 10 Km | (6.) | Corridors | None within 10 Km | 00 | None within 10 Km | (7.) | NPA | None within 10 Km | 00 | None within 10 Km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None within 10 Km | 00 | None within 10 Km | (2.) | Archaeological Sites | | None within 10 Km | 00 | None within 10 Km | (3.) | Forest | | None within 10 Km | 00 | None within 10 Km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 5.2 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | Not Aplicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Pond of village Vadadala, Jolva and Vav | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pond of village Galenda | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 7.3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 26 | (f)Total Manpower | 150 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.716 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 4000 | (d)Funds Allocated for Plantation | 300000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | employment opportunity | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0084 | (ii)Name of the EIA Consultant | San Envirotech Pvt. Ltd., Ahmedabad | (iii)Address | 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad | (iv)Mobile No. | 9825007201 | (v)Landline No. | 0792658307 | (vi)Email Id | mahendra.sepl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 23 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rajesh Aggarwal | Designation | MD | Name of Company (Applicant Name should not be given here) | INSECTICIDES INDIA LIMITED (UNIT- II) | Address | Plot No. D3/1, Dahej GIDC estate, Village: Dahej, Ta.: Vagra, Dist. : Bharuch |
|