1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Onshore Oil and Gas Exploration and Appraisal in RJ-ONHP-2017/3 Block, Jalore District, Rajasthan | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | (c)Registered Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Kumar Bera | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | (c)Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002 | (d)Pin code | 122002 | (e)E-mail | dilipkumar.bera@cairnindia.com | (f)STD Code. | 124(f)Telephone No. | 4594176 | (g)Fax No. | 4145612 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/RJ/IND2/99919/2019 | (d)Master Proposal Number(Single Window) | SW/115969/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 45 C/4, 45 D/1, 40 P/14, 40 P/13, 40 O/16 | (b)Pincode | 343001 | (c)Bounded Latitudes (North) | | From | | Degree | 2731358.53 | Minutes | | Second | | From | | Degree | 2786513.38 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 196368.21 | Minutes | | Second | | From | | Degree | 790641.46 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 45 C/4, 45 D/1, 40P/14, 40 P/13, 40)/16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 175 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.39 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Jalore | Bhinmal | | (2.) | Rajasthan | Jalore | Bagora | | (3.) | Rajasthan | Jalore | Sanchore | | (4.) | Rajasthan | Jalore | Raniwara | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/102/2019-IA-II(I) | (b)Date of Apply of TOR | 20 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 25 Apr 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 46 |
| Collectorate Meeting Hall Jalore | State : | Rajasthan | District : | Jalore | Tehsil : | Jalor | Village : | Jalore |
| 54 | CSR Implementation, Employment Generation, Noise Pollution, Land Requirement | Others | Aditional District Magistrate Jalore | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Well Pad | 90 days | For exploitation of hydrocarbons. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Crude OIl | 32000 | Others | BOPD | Others | Oil Tanker | (2.) | Natural Gas | 4.8 | Others | MMFCSD | Others | Used as fuel in GEG and flaring | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2142 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.08 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.08 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Water | 102 | Cubic Meter per Day | | Tanker Supply | Road | | 0 | Others | Approved Supplier | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 10 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 15 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 19.80 | 5.3 | 18.61 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 44.9 | 21.1 | 44.5 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 1.98 | 0.33 | 1.75 | 4 | (4.) | PM10 | | Micro Gram per Meter Cube | 94.32 | 41.78 | 92.68 | 100 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 36 | 10 | 32.62 | 60 | |
14.2. No. of Ground Water monitoring locations : 15 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | Fluoride | | | mg/l | | 1.18 | 0.05 | 1 | 1.5 | (3.) | TDS | | | mg/l | | 4524 | 1002 | 500 | 2000 | (4.) | pH | | | NA | | 7.6 | 7.2 | 6.5 | 8.5 | (5.) | Total Hardness | | | mg/l | | 810 | 120 | 300 | 600 | (6.) | Heavy Metals | | Arsenic | mg/l | | 0.001 | 0.001 | 0.01 | 0.05 | (7.) | Chlorides | | | mg/l | | 1728 | 32 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 0 | 0 | C | (2.) | DO | | mg/l | | 0 | 0 | C | (3.) | BOD | | mg/l | | 0 | 0 | C | (4.) | COD | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 15 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 61.8 | 42.4 | 55 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 62 | 56.2 | 65 | |
14.5. No. of Soil Sample Monitored locations : 15 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 14.50 | 3.97 | (2.) | N(Nitrogen) | Percent | | 1.49 | 0.62 | (3.) | pH | | | 8.8 | 6.7 | (4.) | K(Potassium) | Kilogram per hectare | | 525.22 | 323.3 | (5.) | Electric Conductivity | Others | µS/cm | 627.7 | 70.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 102 | 0 | Not Appliacble | modeOthers | Road | Others | Tanker Supply | Not Applicable | 26 Aug 2019 | 102 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent From Drill Site | 40 | 50 | Mobile ETP | Others | Discharge as per CPCB Standerd | 10 | 30 | (2.) | Domestic Wsate water Generetion | 25 | 30 | MObile STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 25 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 65 | (b)Total Discharged Water (Kilolitre per Day) | 30 | (c)Total Reused Water (Kilolitre per Day) | 35 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Domestic Waste | Municipal Solid Waste | | 0.03 | Tons | 0 | Road | | Others | Compost Pit | (2.) | Drill Cuttings with WBM | Industrial Waste | | 750 | Tons | 0 | Road | | Others | HDPE Lined Pit | (3.) | Drill Cutting with SBM | Industrial Waste | | 1500 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 94.32 | 5 | 0.48 | 95 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 36 | 5 | 0 | 36.1 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 19.03 | 5 | 0.06 | 20 | 80 | (4.) | NOx | | Microgram per Meter Cube | 44.9 | 5 | 20 | 65 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG | HSD | 7 | 0.2 | NOx | | 0.714 | (2.) | DG | HSD | 30 | 0.305 | NOx | | 2.04 | (3.) | GEG | Gas | 30 | 0.3 | NOx | | 0.093 | (4.) | Flareing | Gas | 30 | 0.078 | NOx | | 0.023 | (5.) | DG | HSD | 7 | 0.2 | NOx | | 0.51 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2450 | (b)Source | DG | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 x 350 KVA DG Sets (camp site) 2 x 1000 KVA DG Se | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 702 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 702 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 121270 | (b)Waste/Barren Land (ha.) | 4800 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 4588 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 4020 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow Land | 7302 | Total (ha.) | 141980 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Well Pad | 9 | Well Pad with EPU | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | Not Present | (2.) | Corridors | NA | 0 | Not Present | (3.) | Wildlife Corridors | NA | 0 | Not Present | (4.) | WLS | NA | 0 | Not Present | (5.) | NPA | NA | 0 | Not Present | (6.) | ESAs | NA | 0 | Not Present | (7.) | ESZs | NA | 0 | Not Present | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Reserve Forest | 0 | Within Block | (2.) | Archaeological Sites | | NA | 0 | Not Present | (3.) | Defence Installations | | NA | 0 | Not Present | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Will decided in later stage | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Seven schedule I species has been recorded but only 1 Schedule I species has been spotted during faunal sampling, Indian Gazelle (Gazella bennettii) and ten avian schedule I species has been recorded | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Sukri River, Sagi River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 80 | (e)No. of working days | 90 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 0 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue will be generated for both State and country during production phase | (2.) | Social | Community will be benefited through induced socio-economic development, employment generation and CSR activity. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA0108 | (ii)Name of the EIA Consultant | AECOM India Private Limited | (iii)Address | ?AECOM India Private Limited 19th Floor, Building No.5 Tower C, Cyber City Gurgaon 122002 Haryana, India | (iv)Mobile No. | 9819068877 | (v)Landline No. | 8240771980 | (vi)Email Id | chetan.zaveri@aecom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 13 Jan 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The clarification/inputs asked by EAC was submitted on 23rd Oct 2019. Please find the attached document. | 11 Nov 2019 | 2. | NA | The EAC, after deliberations, asked for
clarification/inputs in respect of the following:-