Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil and Gas Exploration and Appraisal in RJ-ONHP-2017/3 Block, Jalore District, Rajasthan
(b)Name of the Company / Organisation M/s Vedanta Limited(Division Cairn Oil & Gas)
(c)Registered Address Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dilip Kumar Bera
(b)Designation (Owner/ Partner/ CEO) Sr. Manager - Environment
(c)Address Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002
(d)Pin code 122002
(e)E-mail dilipkumar.bera@cairnindia.com
(f)STD Code. 124(f)Telephone No. 4594176
(g)Fax No. 4145612
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/RJ/IND2/99919/2019
(d)Master Proposal Number(Single Window) SW/115969/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 45 C/4, 45 D/1, 40 P/14, 40 P/13, 40 O/16
(b)Pincode 343001
(c)Bounded Latitudes (North)
From
Degree 2731358.53
Minutes
Second
From
Degree 2786513.38
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 196368.21
Minutes
Second
From
Degree 790641.46
Minutes
Second
(e)Survey of India Topo Sheet No. 45 C/4, 45 D/1, 40P/14, 40 P/13, 40)/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 175
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.39
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanJaloreBhinmal
(2.)RajasthanJaloreBagora
(3.)RajasthanJaloreSanchore
(4.)RajasthanJaloreRaniwara
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/102/2019-IA-II(I)
(b)Date of Apply of TOR 20 Mar 2019
(c)Date of Issue of TOR / Standard ToR 25 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :46
Collectorate Meeting Hall Jalore
State :Rajasthan
District :Jalore
Tehsil :Jalor
Village :Jalore
54CSR Implementation, Employment Generation, Noise Pollution, Land RequirementOthersAditional District Magistrate Jalore
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Well Pad90 daysFor exploitation of hydrocarbons.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Crude OIl32000OthersBOPDOthersOil Tanker
(2.)Natural Gas4.8OthersMMFCSDOthersUsed as fuel in GEG and flaring
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2142
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.08
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.08
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water102Cubic Meter per DayTanker SupplyRoad0 OthersApproved SupplierCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 10 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube19.805.318.6180
(2.)NOxMicro Gram per Meter Cube44.921.144.580
(3.)OthersCOMili Gram per Meter Cube1.980.331.754
(4.)PM10Micro Gram per Meter Cube94.3241.7892.68100
(5.)PM2.5Micro Gram per Meter Cube361032.6260
    14.2.     No. of Ground Water monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Fluoridemg/l1.180.0511.5
(3.)TDSmg/l452410025002000
(4.)pHNA7.67.26.58.5
(5.)Total Hardnessmg/l810120300600
(6.)Heavy MetalsArsenicmg/l0.0010.0010.010.05
(7.)Chloridesmg/l1728322501000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00C
(2.)DOmg/l00C
(3.)BODmg/l00C
(4.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 15
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))61.842.455
(2.)Leq(Day)A-weighted decibels(dB(A))6256.265
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare14.503.97
(2.)N(Nitrogen)Percent1.490.62
(3.)pH8.86.7
(4.)K(Potassium)Kilogram per hectare525.22323.3
(5.)Electric ConductivityOthersµS/cm627.770.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1020 Not Appliacble modeOthersRoadOthersTanker SupplyNot Applicable26 Aug 2019102
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent From Drill Site4050Mobile ETPOthersDischarge as per CPCB Standerd1030
(2.)Domestic Wsate water Generetion2530MObile STPReuse within the Plant & Recycling,Green Belt Renewal Plant25
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 65
(b)Total Discharged Water (Kilolitre per Day) 30
(c)Total Reused Water (Kilolitre per Day) 35
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic WasteMunicipal Solid Waste0.03Tons0RoadOthersCompost Pit
(2.)Drill Cuttings with WBMIndustrial Waste750Tons0RoadOthersHDPE Lined Pit
(3.)Drill Cutting with SBMIndustrial Waste1500Tons0RoadOthersAs per Hazardous Waste Rule 2016
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube94.3250.4895100
(2.)PM2.5Microgram per Meter Cube365036.160
(3.)SO2Microgram per Meter Cube19.0350.062080
(4.)NOxMicrogram per Meter Cube44.95206580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGHSD70.2NOx0.714
(2.)DGHSD300.305NOx2.04
(3.)GEGGas300.3NOx0.093
(4.)FlareingGas300.078NOx0.023
(5.)DGHSD70.2NOx0.51
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2450
(b)Source DG
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 x 350 KVA DG Sets (camp site) 2 x 1000 KVA DG Se
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 702
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 702
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 121270
(b)Waste/Barren Land (ha.) 4800
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 4588
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 4020
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land 7302
    Total (ha.) 141980
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersWell Pad9Well Pad with EPU
Total (ha.) 9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Not Present
(2.)CorridorsNA0Not Present
(3.)Wildlife CorridorsNA0Not Present
(4.)WLSNA0Not Present
(5.)NPANA0Not Present
(6.)ESAsNA0Not Present
(7.)ESZsNA0Not Present
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve Forest0Within Block
(2.)Archaeological SitesNA0Not Present
(3.)Defence InstallationsNA0Not Present
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Will decided in later stage
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Seven schedule I species has been recorded but only 1 Schedule I species has been spotted during faunal sampling, Indian Gazelle (Gazella bennettii) and ten avian schedule I species has been recorded
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sukri River, Sagi River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 80
(e)No. of working days 90
(f)Total Manpower 80
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue will be generated for both State and country during production phase
(2.)SocialCommunity will be benefited through induced socio-economic development, employment generation and CSR activity.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0108
(ii)Name of the EIA Consultant AECOM India Private Limited
(iii)Address ?AECOM India Private Limited 19th Floor, Building No.5 Tower C, Cyber City Gurgaon 122002 Haryana, India
(iv)Mobile No. 9819068877
(v)Landline No. 8240771980
(vi)Email Id chetan.zaveri@aecom.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 13 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe clarification/inputs asked by EAC was submitted on 23rd Oct 2019. Please find the attached document. 11 Nov 2019
2.NA

The EAC, after deliberations, asked for clarification/inputs in respect of the following:-

 

Print