Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Capacity Expansion of Existing Chlor Alkali Plant and establishment of New Flaker Plant, Stable Bleaching Powder Plant, Hydrogen Peroxide Plant & Captive Power Plant at Naya Nangal, Dist. Rup
(b)Name of the Company / Organisation PUNJAB ALKALIES AND CHEMICALS LIMITED
(c)Registered Address S.C.O. 125-127, Sector 17-B, Chandigarh,,Chandigarh,Chandigarh-160017
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant MPS Walia DGM
(b)Designation (Owner/ Partner/ CEO) DGM Works
(c)Address Nangal-Una Road, Naya Nangal, Dist. Rupnangar,,Rupnagar,Rupnagar,Punjab-140126
(d)Pin code 140126
(e)E-mail environment@punjabalkalies.com
(f)STD Code. 1887(f)Telephone No. 220552
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(d) Chlor-alkali industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/PB/IND2/115253/2018
(d)Master Proposal Number(Single Window) SW/114860/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. As mentioned in Additional document-"Khasra number
(b)Pincode 140126
(c)Bounded Latitudes (North)
From
Degree 31.3654
Minutes
Second
From
Degree 31.3715
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.34402
Minutes
Second
From
Degree 76.3443
Minutes
Second
(e)Survey of India Topo Sheet No. F43E3, F43E7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 352
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.73
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number No.IA-J-11011/332/2018-IA-II(I)
(b)Date of Apply of TOR 17 Oct 2018
(c)Date of Issue of TOR / Standard ToR 18 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0
Punjab Alkalies & Chemicals Ltd., Nangal-Una Road, Naya Nangal, Dist.: Rupnagar, Punjab
State :Punjab
District :Rupnagar
Tehsil :Rupnagar
Village :-
379Give priority to and ensure adequate safety measures in proposed plant; Installation of alarms system in case of emergency; Provide training and educate the people in case of any gas leakage &OthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Captive Power Plant75 MWGreenfield Captive Power plant proposed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Caustic Soda Lye264000Tons per AnnumRoad
(2.)Hydrogen739.2Otherslakh/Nm3Road
(3.)Hydrochloric Acid105600Tons per AnnumRoad
(4.)Dilute Sulphuric Acid5600Tons per AnnumRoad
(5.)Caustic Soda Flakes66000Tons per AnnumRoad
(6.)Stable Bleaching Power33000Tons per AnnumRoad
(7.)Chlorine (Liquid)239733Tons per AnnumOthers-
(8.)Hydrogen Peroxide (on 100% concentration basis)16500Tons per AnnumRoad
(9.)Chlorine (Gas)233904Tons per AnnumRoad,Pipe Conveyor
(10.)Sodium Hypo Chlorite6000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Feb 2019
(iv)Valid Upto 31 Mar 2023
(v)File No. CTOA/Renewal/RPN/2019/9025800, CTOW/Renewal/RPN/20
(vi)Application No. 9025800, 9026007
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1240
(b) Funds Allocated for Environment Management (Capital) (in Crores) 29.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10.47
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 307611
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 307611
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Hydrogen232000OthersNm3/dayIn houseOthers-0 Others-Copy of Linkage
(2.)Furnace Oil16000OthersLPDLocal DepotRoad0 OthersNearby areasCopy of Linkage
(3.)HSD Fuel1333OthersLPDLocal DepotRoad0 OthersNearby areasCopy of Linkage
(4.)Coal367500Tons per AnnumLocal depotRoad1250 Fuel Supply AgreementCopy of Linkage
(5.)bio fuel as rice husk/bagasse88000Tons per AnnumLocal MarketsRoad78 OthersRoparCopy of Linkage
(6.)limestone/hydrated lime36750Tons per AnnumLocal MarketRoad145 Othersfrom himachal PradeshCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 27 Oct 2018 To 20 Jan 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube11759115100
(2.)PM2.5Micro Gram per Meter Cube4474160
(3.)OthersCl2Micro Gram per Meter Cube18.30.916.3-
(4.)SO2Micro Gram per Meter Cube10.75.610.580
(5.)NOxMicro Gram per Meter Cube24.413.123.480
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.336.858.50
(2.)TDSmg/l4681605002000
(3.)Chloridesmg/l137332501000
(4.)TSSmg/l0000
(5.)Total Hardnessmg/l410130200600
(6.)Fluoridemg/l0.040.0411.5
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.636.79A
(2.)BODmg/l111A
(3.)DOmg/l4.33.3B
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))79.341.770 (Industrial); 45 (Residential)
(2.)Leq(Day)A-weighted decibels(dB(A))78.956.275 (Industrial); 55 (Residential)
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµmhos/cm1144265
(2.)P(Phosphorus)00
(3.)pH6.856.04
(4.)N(Nitrogen)00
(5.)K(Potassium)Othersgm/kg0.360.02
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 6.5 To 7.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface119362Copy of Permission LetterPipelineOthersPumping from Nangal reservoir2478/50-R23 Jul 201912967
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial14281450RO & MEE resulting in ZLDOthersUsed in DM Plant14280
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1428
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1428
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Metallic and wooden scrapsIndustrial Waste151.130Tons0RoadOthersTo scrap dealers approved by the company
(2.)Plastic WastePlastic Waste3.2Tons0RoadCo-Processing
(3.)Used or Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.7Tons20RoadAuthorized Recyclers
(4.)Brine SludgeOthersSolid Waste6133Tons0RoadOthersLandfill Facility in premises
(5.)Municipal Solid WasteMunicipal Solid Waste6.407Tons3.4RoadOthersNangal Municipal Council System
(6.)Used lead acid batteriesOthersBatteries waste0Tons0RoadOthersBuyback against purchase of new batteries
(7.)MEE SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1750Tons130RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Fly AshFly Ash55005Tons30RoadOthersCement & Brick manufacturing Unit
(9.)Biomedical wasteBio-Medical Waste0.02Tons90RoadOthersAuthorised common BMW disposal facility
(10.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4267Tons20RoadOthersTo Actual Reusers
(11.)Electronic Waste 97 in nos.E Waste0Tons0RoadOthersTo Certified E Waste Recycler
(12.)PVC FRP WasteIndustrial Waste4.850Tons0RoadOthersTo Scrap dealers approved by the company
(13.)Waste Glass woolIndustrial Waste3.304Tons0RoadOthersTo Scrap dealers approved by company
(14.)Biomedical wasteBio-Medical Waste0.2Tons90RoadOthersAuthorised Biomedical waste disposal facility
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube01.800.0010
(2.)PM10Microgram per Meter Cube901.81.4191.5100
(3.)NOxMicrogram per Meter Cube18.91.82.5721.4880
(4.)Others(Specify)Cl2Microgram per Meter Cube7.81.80.0027.8030
(5.)SO2Microgram per Meter Cube9.11.81.9911.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set-1, Existing flue gas stackHSD90.15PM10350 mg/Nm3
(2.)Boiler 2 (Thermax), Existing flue gas stackHydrogen gas400.55PM10350 mg/Nm3
(3.)CPP Boiler stack-1, Proposed fluegas stack(90 TPH)Coal / Biomass602.2PM1030 mg/Nm3
(4.)CPP Boiler stack-2, Proposed fluegas stack(90 TPH)Coal / Biomass602.2SO2100 mg/Nm3
(5.)CPP Boiler stack-4, Proposed fluegas stack(90 TPH)Coal / Bbiomass602.2PM1030 mg/Nm3
(6.)HCl plant furnace-2, Existing process ventHydrogen250.15OthersHCl Acid mist35 mg/Nm3
(7.)DG Set-2, Existing flue gas stackHSD90.15PM10350 mg/Nm3
(8.)DG Set-4, Proposed flue gas stackHSD90.15PM10350 mg/Nm3
(9.)Rice husk boiler (Standby), Existing fluegas stackRice husk300.8PM10350 mg/Nm3
(10.)CPP Boiler stack-3, Proposed fluegas stack(90 TPH)Coal / Biomass602.2NOx100 mg/Nm3
(11.)Sodium Hypo-1, Existing process vent-150.15OthersCl215 mg/Nm3
(12.)Sodium Hypo-2, Existing process vent-150.15OthersCl215 mg/Nm3
(13.)Sodium Hypo-3, Proposed process vent-150.15OthersCl215 mg/Nm3
(14.)HCl plant furnace-1, Existing process ventHydrogen250.15OthersHCl Acid mist35 mg/Nm3
(15.)HCl plant furnace-3, Proposed process ventHydrogen250.15OthersHCl Acid mist35 mg/Nm3
(16.)H2O2 plant Solvent recovery, Proposed process vent-320.4OthersHC15 mg/Nm3
(17.)DG Set-5, Proposed flue gas stackHSD90.15PM10350 mg/Nm3
(18.)DG Set-3, Existing flue gas stackHSD90.15PM10350 mg/Nm3
(19.)Boiler 1 (Thermax), Existing flue gas stackHydrogen gas400.55PM10350 mg/Nm3
(20.)Flaker stack, Proposed flue gas stack-300.2PM10350 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 75000
(b)Source Captive Power Plant / Power Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 DG Set of 1.5 MW (Existing) & 1 DG set of 1 MW (
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 35.96
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 35.96
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 12480.75
(b)Waste/Barren Land (ha.) 1210.78
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1091.39
(e)Settlements (ha.) 2076.91
(f)Industrial (ha.) 363.81
(g)Forest (ha.) 734.02
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation cover and Grasslands 15723.47
    Total (ha.) 33681.13
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant7.2069Power Plant H2O2 Plant SBP Plant Flaker Plant
(2.)Built Up Area4.3047Administrative Building
(3.)OthersStorage Area CPW Open space Flowtech chemical13Storage Area CPW Open space Flowtech chemical
(4.)Green belt11.4
Total (ha.) 35.9116
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNangal Wildlife sanctuary2.6Ecologically sensitive area - WLS present in study area
(2.)ESAsNone0Not present in study area
(3.)ESZsEco Sensitive Zone of Nangal WLS2.6Ecologically sensitive area - ESZ of Nangal WLS present in study area
(4.)NPANangal Wildlife sanctuary2.6Ecologically sensitive area - NPA present in study area
(5.)Critically Polluted AreaNone0Not present in study area
(6.)CorridorsNone0Not present in study area
(7.)Wildlife CorridorsNone0Not present in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersWetlandNangal Wetland / Reservoir2.6Present in study area
(2.)ForestBoru Reserved Forest9Present in study area in NNE direction
(3.)Defence Installations-0-
(4.)Archaeological Sites-0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 200
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 35.96
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable as land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species (IWPA, 1972) faunal species i.e. Peacock or Indian peafowl (Pavo cristatus), Python (Python Molurus), Pangolin (Manis crassicaudata) and Leopard (Panthera pardus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 45 lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 6536
(iii)Date of issue 30 Jan 2019
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sutlej River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 350
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 11.3846
(b)Percentage of Total Project Area 31.66
(c)No. of Plants to be Planted 17207
(d)Funds Allocated for Plantation 1720500
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financial• Increased state and central taxes and revenues accruing to the state and central exchequers; • 200 persons will be required for operating Power Plant. Local skilled and semi-skilled workers will be preferentially hired for the purpose • Increase in business opportunities for local people as there will be scope of hiring vehicle like tractors and trolleys, bulldozers, JCB, excavators during construction and operation phase of the project; • Increase in small-scale businesses like tea stalls, ca
(2.)Environmental• Preventive health, Sanitation and safe, clean drinking water; • Education and Skill development; • Rural Development; • Environmental Sustainability including village pond rejuvenation
(3.)SocialThere shall be employment generation for the local people during the construction and operational phase of the proposed facility. The existing manpower deployed at PACL’s Naya Nangal site is 400 persons direct and about 500 indirect. The existing manpower will be sufficient to operate the plants after expansion in Caustic Soda Plant. However, 200 person will be required for operating Power Plant. Local skilled and semi-skilled workers will be preferentially hired for the purpose
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0138
(ii)Name of the EIA Consultant Kadam Environmental
(iii)Address 871/B/3, GIDC Makarpura, Vadodara, India – 390 010
(iv)Mobile No. 9714861611
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMPS Walia DGM
DesignationDGM Works
Name of Company (Applicant Name should not be given here)PUNJAB ALKALIES AND CHEMICALS LIMITED
AddressS.C.O. 125-127, Sector 17-B, Chandigarh