1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Capacity Expansion of Existing Chlor Alkali Plant and establishment of New Flaker Plant, Stable Bleaching Powder Plant, Hydrogen Peroxide Plant & Captive Power Plant at Naya Nangal, Dist. Rup | (b)Name of the Company / Organisation | PUNJAB ALKALIES AND CHEMICALS LIMITED | (c)Registered Address | S.C.O. 125-127,
Sector 17-B, Chandigarh,,Chandigarh,Chandigarh-160017 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | MPS Walia DGM | (b)Designation (Owner/ Partner/ CEO) | DGM Works | (c)Address | Nangal-Una Road, Naya Nangal, Dist. Rupnangar,,Rupnagar,Rupnagar,Punjab-140126 | (d)Pin code | 140126 | (e)E-mail | environment@punjabalkalies.com | (f)STD Code. | 1887(f)Telephone No. | 220552 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(d) Chlor-alkali industry
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/PB/IND2/115253/2018 | (d)Master Proposal Number(Single Window) | SW/114860/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | As mentioned in Additional document-"Khasra number | (b)Pincode | 140126 | (c)Bounded Latitudes (North) | | From | | Degree | 31.3654 | Minutes | | Second | | From | | Degree | 31.3715 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.34402 | Minutes | | Second | | From | | Degree | 76.3443 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43E3, F43E7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 352 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.73 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Punjab | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | No.IA-J-11011/332/2018-IA-II(I) | (b)Date of Apply of TOR | 17 Oct 2018 | (c)Date of Issue of TOR / Standard ToR | 18 Nov 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 05 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Punjab Alkalies & Chemicals Ltd., Nangal-Una Road, Naya Nangal, Dist.: Rupnagar, Punjab | State : | Punjab | District : | Rupnagar | Tehsil : | Rupnagar | Village : | - |
| 379 | Give priority to and ensure
adequate safety measures
in proposed plant; Installation of alarms
system in case of emergency; Provide
training and educate
the people in case of
any gas leakage & | Others | Additional Deputy Commissioner | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Captive Power Plant | 75 MW | Greenfield Captive Power plant proposed | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Caustic Soda Lye | 264000 | Tons per Annum | | Road | | (2.) | Hydrogen | 739.2 | Others | lakh/Nm3 | Road | | (3.) | Hydrochloric Acid | 105600 | Tons per Annum | | Road | | (4.) | Dilute Sulphuric Acid | 5600 | Tons per Annum | | Road | | (5.) | Caustic Soda Flakes | 66000 | Tons per Annum | | Road | | (6.) | Stable Bleaching Power | 33000 | Tons per Annum | | Road | | (7.) | Chlorine (Liquid) | 239733 | Tons per Annum | | Others | - | (8.) | Hydrogen Peroxide (on 100% concentration basis) | 16500 | Tons per Annum | | Road | | (9.) | Chlorine (Gas) | 233904 | Tons per Annum | | Road,Pipe Conveyor | | (10.) | Sodium Hypo Chlorite | 6000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 Feb 2019 | (iv)Valid Upto | 31 Mar 2023 | (v)File No. | CTOA/Renewal/RPN/2019/9025800, CTOW/Renewal/RPN/20 | (vi)Application No. | 9025800, 9026007 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1240 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 29.70 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.10 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 10.47 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | c)Notified Eco-sensitive areas | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 307611 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 307611 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Hydrogen | 232000 | Others | Nm3/day | In house | Others | - | 0 | Others | - | Copy of Linkage | (2.) | Furnace Oil | 16000 | Others | LPD | Local Depot | Road | | 0 | Others | Nearby areas | Copy of Linkage | (3.) | HSD Fuel | 1333 | Others | LPD | Local Depot | Road | | 0 | Others | Nearby areas | Copy of Linkage | (4.) | Coal | 367500 | Tons per Annum | | Local depot | Road | | 1250 | Fuel Supply Agreement | | Copy of Linkage | (5.) | bio fuel as rice husk/bagasse | 88000 | Tons per Annum | | Local Markets | Road | | 78 | Others | Ropar | Copy of Linkage | (6.) | limestone/hydrated lime | 36750 | Tons per Annum | | Local Market | Road | | 145 | Others | from himachal Pradesh | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 27 Oct 2018 To 20 Jan 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 117 | 59 | 115 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 44 | 7 | 41 | 60 | (3.) | Others | Cl2 | Micro Gram per Meter Cube | 18.3 | 0.9 | 16.3 | - | (4.) | SO2 | | Micro Gram per Meter Cube | 10.7 | 5.6 | 10.5 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 24.4 | 13.1 | 23.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.33 | 6.85 | 8.5 | 0 | (2.) | TDS | | | mg/l | | 468 | 160 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 137 | 33 | 250 | 1000 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | Total Hardness | | | mg/l | | 410 | 130 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 0.04 | 0.04 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.63 | 6.79 | A | (2.) | BOD | | mg/l | | 11 | 1 | A | (3.) | DO | | mg/l | | 4.3 | 3.3 | B | (4.) | COD | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 79.3 | 41.7 | 70 (Industrial); 45 (Residential) | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 78.9 | 56.2 | 75 (Industrial); 55 (Residential) | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | µmhos/cm | 1144 | 265 | (2.) | P(Phosphorus) | | | 0 | 0 | (3.) | pH | | | 6.85 | 6.04 | (4.) | N(Nitrogen) | | | 0 | 0 | (5.) | K(Potassium) | Others | gm/kg | 0.36 | 0.02 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12 To 15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 6.5 To 7.0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 11936 | 2 | Copy of Permission Letter | Pipeline | | Others | Pumping from Nangal reservoir | 2478/50-R | 23 Jul 2019 | 12967 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 1428 | 1450 | RO & MEE resulting in ZLD | Others | Used in DM Plant | 1428 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1428 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1428 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Metallic and wooden scraps | Industrial Waste | | 151.130 | Tons | 0 | Road | | Others | To scrap dealers approved by the company | (2.) | Plastic Waste | Plastic Waste | | 3.2 | Tons | 0 | Road | | Co-Processing | | (3.) | Used or Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.7 | Tons | 20 | Road | | Authorized Recyclers | | (4.) | Brine Sludge | Others | Solid Waste | 6133 | Tons | 0 | Road | | Others | Landfill Facility in premises | (5.) | Municipal Solid Waste | Municipal Solid Waste | | 6.407 | Tons | 3.4 | Road | | Others | Nangal Municipal Council System | (6.) | Used lead acid batteries | Others | Batteries waste | 0 | Tons | 0 | Road | | Others | Buyback against purchase of new batteries | (7.) | MEE Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1750 | Tons | 130 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | Fly Ash | Fly Ash | | 55005 | Tons | 30 | Road | | Others | Cement & Brick manufacturing Unit | (9.) | Biomedical waste | Bio-Medical Waste | | 0.02 | Tons | 90 | Road | | Others | Authorised common BMW disposal facility | (10.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4267 | Tons | 20 | Road | | Others | To Actual Reusers | (11.) | Electronic Waste 97 in nos. | E Waste | | 0 | Tons | 0 | Road | | Others | To Certified E Waste Recycler | (12.) | PVC FRP Waste | Industrial Waste | | 4.850 | Tons | 0 | Road | | Others | To Scrap dealers approved by the company | (13.) | Waste Glass wool | Industrial Waste | | 3.304 | Tons | 0 | Road | | Others | To Scrap dealers approved by company | (14.) | Biomedical waste | Bio-Medical Waste | | 0.2 | Tons | 90 | Road | | Others | Authorised Biomedical waste disposal facility | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 0 | 1.8 | 0 | 0.001 | 0 | (2.) | PM10 | | Microgram per Meter Cube | 90 | 1.8 | 1.41 | 91.5 | 100 | (3.) | NOx | | Microgram per Meter Cube | 18.9 | 1.8 | 2.57 | 21.48 | 80 | (4.) | Others(Specify) | Cl2 | Microgram per Meter Cube | 7.8 | 1.8 | 0.002 | 7.803 | 0 | (5.) | SO2 | | Microgram per Meter Cube | 9.1 | 1.8 | 1.99 | 11.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set-1, Existing flue gas stack | HSD | 9 | 0.15 | PM10 | | 350 mg/Nm3 | (2.) | Boiler 2 (Thermax), Existing flue gas stack | Hydrogen gas | 40 | 0.55 | PM10 | | 350 mg/Nm3 | (3.) | CPP Boiler stack-1, Proposed fluegas stack(90 TPH) | Coal / Biomass | 60 | 2.2 | PM10 | | 30 mg/Nm3 | (4.) | CPP Boiler stack-2, Proposed fluegas stack(90 TPH) | Coal / Biomass | 60 | 2.2 | SO2 | | 100 mg/Nm3 | (5.) | CPP Boiler stack-4, Proposed fluegas stack(90 TPH) | Coal / Bbiomass | 60 | 2.2 | PM10 | | 30 mg/Nm3 | (6.) | HCl plant furnace-2, Existing process vent | Hydrogen | 25 | 0.15 | Others | HCl Acid mist | 35 mg/Nm3 | (7.) | DG Set-2, Existing flue gas stack | HSD | 9 | 0.15 | PM10 | | 350 mg/Nm3 | (8.) | DG Set-4, Proposed flue gas stack | HSD | 9 | 0.15 | PM10 | | 350 mg/Nm3 | (9.) | Rice husk boiler (Standby), Existing fluegas stack | Rice husk | 30 | 0.8 | PM10 | | 350 mg/Nm3 | (10.) | CPP Boiler stack-3, Proposed fluegas stack(90 TPH) | Coal / Biomass | 60 | 2.2 | NOx | | 100 mg/Nm3 | (11.) | Sodium Hypo-1, Existing process vent | - | 15 | 0.15 | Others | Cl2 | 15 mg/Nm3 | (12.) | Sodium Hypo-2, Existing process vent | - | 15 | 0.15 | Others | Cl2 | 15 mg/Nm3 | (13.) | Sodium Hypo-3, Proposed process vent | - | 15 | 0.15 | Others | Cl2 | 15 mg/Nm3 | (14.) | HCl plant furnace-1, Existing process vent | Hydrogen | 25 | 0.15 | Others | HCl Acid mist | 35 mg/Nm3 | (15.) | HCl plant furnace-3, Proposed process vent | Hydrogen | 25 | 0.15 | Others | HCl Acid mist | 35 mg/Nm3 | (16.) | H2O2 plant Solvent recovery, Proposed process vent | - | 32 | 0.4 | Others | HC | 15 mg/Nm3 | (17.) | DG Set-5, Proposed flue gas stack | HSD | 9 | 0.15 | PM10 | | 350 mg/Nm3 | (18.) | DG Set-3, Existing flue gas stack | HSD | 9 | 0.15 | PM10 | | 350 mg/Nm3 | (19.) | Boiler 1 (Thermax), Existing flue gas stack | Hydrogen gas | 40 | 0.55 | PM10 | | 350 mg/Nm3 | (20.) | Flaker stack, Proposed flue gas stack | - | 30 | 0.2 | PM10 | | 350 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 75000 | (b)Source | Captive Power Plant / Power Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 DG Set of 1.5 MW (Existing) & 1 DG set of 1 MW ( | (e)Stack Height (in m) | 9 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 35.96 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 35.96 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 12480.75 | (b)Waste/Barren Land (ha.) | 1210.78 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1091.39 | (e)Settlements (ha.) | 2076.91 | (f)Industrial (ha.) | 363.81 | (g)Forest (ha.) | 734.02 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Vegetation cover and Grasslands | 15723.47 | Total (ha.) | 33681.13 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 7.2069 | Power Plant H2O2 Plant SBP Plant Flaker Plant | (2.) | Built Up Area | | 4.3047 | Administrative Building | (3.) | Others | Storage Area CPW Open space Flowtech chemical | 13 | Storage Area CPW Open space Flowtech chemical | (4.) | Green belt | | 11.4 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nangal Wildlife sanctuary | 2.6 | Ecologically sensitive area - WLS present in study area | (2.) | ESAs | None | 0 | Not present in study area | (3.) | ESZs | Eco Sensitive Zone of Nangal WLS | 2.6 | Ecologically sensitive area - ESZ of Nangal WLS present in study area | (4.) | NPA | Nangal Wildlife sanctuary | 2.6 | Ecologically sensitive area - NPA present in study area | (5.) | Critically Polluted Area | None | 0 | Not present in study area | (6.) | Corridors | None | 0 | Not present in study area | (7.) | Wildlife Corridors | None | 0 | Not present in study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | Wetland | Nangal Wetland / Reservoir | 2.6 | Present in study area | (2.) | Forest | | Boru Reserved Forest | 9 | Present in study area in NNE direction | (3.) | Defence Installations | | - | 0 | - | (4.) | Archaeological Sites | | - | 0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 35.96 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable as land is already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | (IWPA, 1972) faunal species i.e. Peacock or Indian peafowl (Pavo cristatus), Python (Python Molurus), Pangolin (Manis crassicaudata) and Leopard (Panthera pardus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Rs. 45 lakhs | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 6536 | (iii)Date of issue | 30 Jan 2019 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sutlej River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 1.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 350 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 11.3846 | (b)Percentage of Total Project Area | 31.66 | (c)No. of Plants to be Planted | 17207 | (d)Funds Allocated for Plantation | 1720500 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | • Increased state and central taxes and revenues accruing to the state and central exchequers;
• 200 persons will be required for operating Power Plant. Local skilled and semi-skilled workers will be preferentially hired for the purpose
• Increase in business opportunities for local people as there will be scope of hiring vehicle like tractors and trolleys, bulldozers, JCB, excavators during construction and operation phase of the project;
• Increase in small-scale businesses like tea stalls, ca | (2.) | Environmental | • Preventive health, Sanitation and safe, clean drinking water;
• Education and Skill development;
• Rural Development;
• Environmental Sustainability including village pond rejuvenation | (3.) | Social | There shall be employment generation for the local people during the construction and operational phase of the proposed facility.
The existing manpower deployed at PACL’s Naya Nangal site is 400 persons direct and about 500 indirect. The existing manpower will be sufficient to operate the plants after expansion in Caustic Soda Plant. However, 200 person will be required for operating Power Plant. Local skilled and semi-skilled workers will be preferentially hired for the purpose | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0138 | (ii)Name of the EIA Consultant | Kadam Environmental | (iii)Address | 871/B/3, GIDC Makarpura, Vadodara, India – 390 010 | (iv)Mobile No. | 9714861611 | (v)Landline No. | 0265613100 | (vi)Email Id | kadam@kadamenviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | MPS Walia DGM | Designation | DGM Works | Name of Company (Applicant Name should not be given here) | PUNJAB ALKALIES AND CHEMICALS LIMITED | Address | S.C.O. 125-127,
Sector 17-B, Chandigarh |
|