|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Bulk drug and Intermediates manufacturing unit by M/s. Dasami Lab Pvt. Ltd. | (b)Name of the Company / Organisation | DASAMI LAB PVT LTD | (c)Registered Address | Dasami Lab Pvt. Ltd.,Sy. No. 404, 405, 407, 408, 409 and 410, Veliminedu Village, Chityal Mandal, Nalgonda District, Telangana,Nalgonda,Telangana-508114 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vasudeva Reddy M | (b)Designation (Owner/ Partner/ CEO) | GMCorporateEHS | (c)Address | Dasami Lab Pvt. Ltd.,Sy. No.s 404, 405, 407, 408, 409 and 410, Veliminedu Village, Chityal Mandal, Nalgonda District, Telangana,Chityala,Nalgonda,Telangana-508114 | (d)Pin code | 508114 | (e)E-mail | vasudevareddy.m@heterodrugs.com | (f)STD Code. | 40(f)Telephone No. | 23710405 | (g)Fax No. | 23700405 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TG/IND2/115224/2016 | (d)Master Proposal Number(Single Window) | SW/115222/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy. No. 404, 405, 407, 408, 409 and 410 | (b)Pincode | 508114 | (c)Bounded Latitudes (North) | | From | | Degree | 17.132105 | Minutes | | Second | | From | | Degree | 17.133794 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.025114 | Minutes | | Second | | From | | Degree | 79.025935 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | EaaM15, E44M16, E44N3 and E44N4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 334 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 220 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/57/2016-IA II (I) | (b)Date of Apply of TOR | 27 Jan 2016 | (c)Date of Issue of TOR / Standard ToR | 08 Jun 2017 | (d)Date of Apply of EC | 06 Jun 2007 | (e)Date of Issue of EC | 21 Feb 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.1 |
| Near the existing plant area | State : | Telangana | District : | Nalgonda | Tehsil : | Chityala | Village : | Veliminedu |
| 450 | Employement Generatin
Pollution control measures
Village development | Others | Joint Collector & Addl. District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/2017-18/1/TE/1131 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 6 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Clopidogrel Hydrogen Sulfate | 5 | 5 | 10 | Others | TPM | Road | | (2.) | Drotaverine HCl | 2.5 | 0.5 | 3 | Others | TPM | Road | | (3.) | Omeprazole | 5 | 0 | 5 | Others | TPM | Road | | (4.) | Rampril | 5 | 2 | 7 | Others | TPM | Road | | (5.) | Sparfloxacin | 4 | 16 | 20 | Others | TPM | Road | | (6.) | Tramadol HCl | 5 | 7 | 12 | Others | TPM | Road | | (7.) | Amlodipine Besylate | 0 | 20 | 20 | Others | TPM | Road | | (8.) | Bocepravir | 0 | 6 | 6 | Others | TPM | Road | | (9.) | Bupropion HCl | 0 | 20 | 20 | Others | TPM | Road | | (10.) | Dexlansoprazole | 0 | 5 | 5 | Others | TPM | Road | | (11.) | Eslicarbazapine | 0 | 2 | 2 | Others | TPM | Road | | (12.) | Glimepride | 0 | 3 | 3 | Others | TPM | Road | | (13.) | Mesalamine | 0 | 7 | 7 | Others | TPM | Road | | (14.) | Sevelamir HCl | 0 | 29 | 29 | Others | TPM | Road | | (15.) | Ticagrelor | 0 | 1 | 1 | Others | TPM | Road | | (16.) | Valagancyclovir HCl | 0 | 2 | 2 | Others | TPM | Road | | (17.) | Anastrozole | 0 | 2 | 2 | Others | TPM | Road | | (18.) | Bendamustine HCl | 0 | 2.5 | 2.5 | Others | TPM | Road | | (19.) | Bexarotene | 0 | 3 | 3 | Others | TPM | Road | | (20.) | Bicalutamide | 0 | 5 | 5 | Others | TPM | Road | | (21.) | Cyclophosphamide | 0 | 2 | 2 | Others | TPM | Road | | (22.) | Emtricitabine | 0 | 30 | 30 | Others | TPM | Road | | (23.) | Erlotinib HCl | 0 | 4 | 4 | Others | TPM | Road | | (24.) | Lansoprazole | 0 | 8 | 8 | Others | TPM | Road | | (25.) | Lomitapide | 0 | 2 | 2 | Others | TPM | Road | | (26.) | Nebumitone | 0 | 10 | 10 | Others | TPM | Road | | (27.) | Posaconazole | 0 | 7 | 7 | Others | TPM | Road | | (28.) | Abiraterone Acetate | 0 | 1 | 1 | Others | TPM | Road | | (29.) | Capecitabine | 0 | 2 | 2 | Others | TPM | Road | | (30.) | Irinotrcan HCl | 0 | 14 | 14 | Others | TPM | Road | | (31.) | Letrozole | 0 | 2.5 | 2.5 | Others | TPM | Road | | (32.) | Nilotinib HCl | 0 | 2 | 2 | Others | TPM | Road | | (33.) | Pazopanib HCl | 0 | 2 | 2 | Others | TPM | Road | | (34.) | Pemetrexed Disodium | 0 | 0.5 | 0.5 | Others | TPM | Road | | (35.) | Sorafenib Tosylate | 0 | 6 | 6 | Others | TOM | Road | | (36.) | Sunitinib Malate | 0 | 6 | 6 | Others | TPM | Road | | (37.) | Dalfampridine | 0 | 17 | 17 | Others | TPM | Road | | (38.) | Telapravir | 0 | 5 | 5 | Others | TPM | Road | | (39.) | Bortezomib | 0 | 0.5 | 0.5 | Others | TPM | Road | | (40.) | Dasatinib | 0 | 2 | 2 | Others | TPM | Road | | (41.) | Gefitinib | 0 | 2 | 2 | Others | TPM | Road | | (42.) | Carvedilol | 5 | 25 | 30 | Others | TPM | Road | | (43.) | Duloxetine HCl | 3 | 12 | 15 | Others | TPM | Road | | (44.) | Aprimilast | 0 | 3 | 3 | Others | TPM | Road | | (45.) | Colisevelam | 0 | 6 | 6 | Others | TPM | Road | | (46.) | Divalproex Sodium | 0 | 15 | 15 | Others | TPM | Road | | (47.) | Fexofenadine HCl | 0 | 10 | 10 | Others | TPM | Road | | (48.) | Piperquine Phosphate | 0 | 5 | 5 | Others | TPM | Road | | (49.) | Ranolazine | 0 | 10 | 10 | Others | TPM | Road | | (50.) | Valacyclovir | 0 | 6 | 6 | Others | TPM | Road | | (51.) | Carboplatin | 0 | 5 | 5 | Others | TPM | Road | | (52.) | Cisplatin | 0 | 2 | 2 | Others | TPM | Road | | (53.) | Gemacitabine HCl | 0 | 1 | 1 | Others | TPM | Road | | (54.) | Imatinib Mesylate | 0 | 16 | 16 | Others | TPM | Road | | (55.) | Lapatinib Ditosylate Monohydrate | 0 | 2 | 2 | Others | TPM | Road | | (56.) | Oxaliplatin | 0 | 4 | 4 | Others | TPM | Road | | (57.) | Temozolomide | 0 | 1 | 1 | Others | TPM | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | API Bulk Drug and Intermediates | 15 | 406 | 421 | Tons Per Month | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Mar 2016 | (iv)Valid Upto | 30 Apr 2020 | (v)File No. | TSPCB/RCP/NLG/HO/CFO/2016 02 | (vi)Application No. | TSPCB/RCP/NLG/HO/CFO/2016 02 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 45 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 11.854 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.11 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 15.475 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 506 | (b)Existing quantity of raw material/fuel | 18 | (c)Total quantity of raw material/fuel | 524 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Synthetic Organic and Inorganic Chemicals | 6312 | Tons per Annum | | Indigenous | Road | | 200 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 01 Jun 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 24 | 11 | 23 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 12 | 9 | 12 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 12 | 9 | 11 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 56 | 32 | 54 | 100 | (5.) | Others | VOC in PPM | NA | 1.2 | 0.3 | 1.1 | NA | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 790 | 130 | 200 | 200 | (2.) | Fluoride | | | mg/l | | 0.87 | 0.4 | 1 | 1 | (3.) | Chlorides | | | mg/l | | 365 | 74 | 250 | 250 | (4.) | pH | | | NA | | 7.8 | 7 | 7 | 7 | (5.) | TSS | | | mg/l | | 13 | 10 | 100 | 100 | (6.) | TDS | | | mg/l | | 1081 | 327 | 500 | 500 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 6.67 | 6 | E | (2.) | BOD | | mg/l | | 4 | 3.7 | B | (3.) | COD | | mg/l | | 13 | 11 | B | (4.) | DO | | mg/l | | 4.4 | 4.3 | B | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53 | 44 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 40 | 34 | 45 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | ds/m | 0.3 | 0.04 | (2.) | N(Nitrogen) | Percent | | 0.29 | 0.017 | (3.) | K(Potassium) | Milligram per Kilogram | | 338 | 239 | (4.) | P(Phosphorus) | Percent | | 0.76 | 0.32 | (5.) | pH | | | 8 | 6.8 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.3 To 26 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.54 To 16 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mission Bhagiratha | 272.73 | 100 | Copy of Permission Letter | Pipeline | | Others | Pipeline | T1/DEE2/MB Grid/Bulk Water Connections/2017-18 | 07 Feb 2019 | 300 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | High TDS and High COD Stream | 171.07 | 250 | Sent to Stripper. Stripper condensate shall be disposed to cement industries for co-processing/TSDF. Stripper bottom is sent to MEE followed by AFTD. Condensate from MEE shall be sent to biological treatment plant followed by RO. RO rejects are sent to MEE and permeate is reused in cooling towers, boiler make-up and scrubbers | Others | Sent to ZLD System | 155 | 16.07 | (2.) | Low TDS and Low COD Stream | 66 | 250 | Sent to biological treatment system followed by RO. RO permeate reused for cooling towers, boiler make-up and scrubbers. RO rejects are sent to MEE. | Others | Sent to ZLD System | 60 | 6 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 237.07 | (b)Total Discharged Water (Kilolitre per Day) | 22.07 | (c)Total Reused Water (Kilolitre per Day) | 215 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solvent Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2332.8 | Tons | 36 | Road | | Others | Sent to Cement plants for co-processing or TSDF | (2.) | Stripper Distillate | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 972 | Tons | 36 | Road | | Others | Sent to Cement plants for co-processing or TSDF | (3.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 356.4 | Tons | 36 | Road | | Others | Sent to Cement plants for co-processing or TSDF | (4.) | Evaporation Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2592 | Tons | 42 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Inorganic residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1245.6 | Tons | 42 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Catalyst and Hyflow | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 67.5 | Tons | 42 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | Mixed Spent Solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5400 | Tons | 42 | Road | | Others | Sent to authorized recovery units | (8.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 126 | Tons | 42 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (9.) | Organic residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2235.6 | Tons | 36 | Road | | Others | Sent to Cement plants for co-processing or TSDF | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 23 | 1.6 | 0.5 | 23.52 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 12 | 1.6 | 3.3 | 15.36 | 80 | (3.) | NOx | | Microgram per Meter Cube | 12 | 1.6 | 4.2 | 16.28 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 54 | 1.6 | 1.1 | 55.16 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1 x 5 TPH | Coal | 30 | 1.3 | NOx | | 1.2 g/s | (2.) | 2 x10TPH Boiler | Coal | 35 | 1.5 | PM10 | | 0.85 g/s | (3.) | 2 x 10 TPH Boiler | Coal | 35 | 1.5 | SO2 | | 1.8 g/s | (4.) | 2 x 10 TPH Boiler | Coal | 35 | 1.5 | NOx | | 2.1 g/s | (5.) | 1 x 5 TPH Boiler | Coal | 30 | 1.3 | SO2 | | 0.87 g/s | (6.) | 1 x 5 TPH Boiler | Coal | 30 | 1.3 | PM10 | | 0.5 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4000 | (b)Source | TSSPDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 x 1000 kVA and 1 x 380 kVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 20.64 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 20.64 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 20.64 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 20.64 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 7.28 | 35.3% of Total site area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | No Corridors within 10 km Study Area | (2.) | WLS | NA | 0 | No WLS within 10 km of Study Area | (3.) | ESAs | NA | 0 | No ESAs within 10 km Study Area | (4.) | ESZs | NA | 0 | No ESZs within 10 km Study Area | (5.) | Critically Polluted Area | Patancheru and Bollaram | 79 | Critically Polluted Area | (6.) | NPA | NA | 0 | No NPA within 10 km of Study Area | (7.) | Wildlife Corridors | NA | 0 | No Wildlife Corridors within 10 km Study Area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | No Archaeological Sites within 10 km Study Area | (2.) | Defence Installations | | NA | 0 | No Defence Installations within 10 km Study Area | (3.) | Forest | | Chityal RF | 6 | in East | (4.) | Others | Reserve Forest | Shivanenigudem RF | 9 | in Northeast | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 20.64 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Completed | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Seasonal nala Chinna Vagu | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 6.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 350 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 360 | (f)Total Manpower | 450 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.97 | 6.31 | 7.279999999999999 | (2.) | Percentage of Total Project Area | 33 | 2.3 | 35.3 | (3.) | No. of Plants | 850 | 3550 | 4400 | (4.) | Funds Allocated | 6 | 12 | 18 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employement Potential | (2.) | Financial | Reduce imports of intermediates | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA/0077 | (ii)Name of the EIA Consultant | Team Labs and Consultants | (iii)Address | TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038 | (iv)Mobile No. | 0402374855 | (v)Landline No. | 0402374855 | (vi)Email Id | teamlabs@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 01 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | |
|