Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) 1.02 MTPA (2 x 0.51 Million TPA) Ammonium Phosphate Fertilizer-Chemical Fertilizer Complex of M/s Hindustan Zinc Limited
(b)Name of the Company / Organisation HZL FERTLIZER PROJECT
(c)Registered Address Hindustan Zinc Limited, Yashad Bhawan, Near Swaroop Sagar,,Udaipur,Rajasthan-313004
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajit Singh Head Fertilizer Project
(b)Designation (Owner/ Partner/ CEO) Chief Project Officer
(c)Address Hindustan Zinc Limited,Yashad Bhawan, Near Swaroop Sagar,,Girwa,Udaipur,Rajasthan-313004
(d)Pin code 313004
(e)E-mail ajit.singh3@vedanta.co.in
(f)STD Code. 294(f)Telephone No. 6604013
(g)Fax No. 2427734
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(a) Chemical fertilizers
Minor Activity5(a) Chemical fertilizers
(b)Category A
(c)Proposal Number IA/RJ/IND2/60077/2016
(d)Master Proposal Number(Single Window) SW/115174/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 38,40,70,272,295,296 & 307
(b)Pincode 312021
(c)Bounded Latitudes (North)
From
Degree 24.969136
Minutes
Second
From
Degree 24.975468
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.659200
Minutes
Second
From
Degree 74.667857
Minutes
Second
(e)Survey of India Topo Sheet No. 45 L/9, 45 K/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 399
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanchittorgarhChittaurgarh
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J- 11011/350/2016-IA.II(I)
(b)Date of Apply of TOR 31 Oct 2016
(c)Date of Issue of TOR / Standard ToR 13 Dec 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :1.5
Government Secondary School, Village : Biliya, Chittorgarh, Rajasthan
State :Rajasthan
District :chittorgarh
Tehsil :Chittaurgarh
Village :Biliya
1500Public hearing for the proposed new project was conducted at the Government secondary School Biliya Premises in the presence of ADM, Revenue department officials and Regional Officer of RSPCB. IssueOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Aluminium Fluoride Plant18000 TPATwo Phases
(2.)DAP/NPK/APS Plant1.02 MTPA/1.0 MTPA/0.4 MTPATwo Phases
(3.)Phosphoric Acid Plant0.48 MTPA 100% P2O5 BASISTwo Phases
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Phosphoric acid (100% P2O5 basis)480000Tons per AnnumOthersWill be consumed within the process.
(2.)DAP/NPK/APS1020000Tons per AnnumRoad,Rail
(3.)Aluminium Fluoride18000Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2700
(b) Funds Allocated for Environment Management (Capital) (in Crores) 185
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 13.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 37
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3479000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3479000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulfuric Acid1440000Tons per AnnumCaptiveOthersPipeline0.7 CaptiveCopy of Linkage
(2.)Potash64000Tons per AnnumImportRoad,Rail580 Open MarketCopy of Linkage
(3.)Aluminum hydroxide21000Tons per AnnumDomesticRoad,Rail1100 OthersGroup CompanyCopy of Linkage
(4.)ammonia240000Tons per AnnumImportRoad,Rail580 Open MarketCopy of Linkage
(5.)Rock Phosphate1580000Tons per AnnumImportRoad,Rail580 Open MarketCopy of Linkage
(6.)Urea22000Tons per AnnumImportRoad,Rail580 Open MarketCopy of Linkage
(7.)Filler112000Tons per AnnumDomesticRoad,Rail600 Open MarketMarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube21.56.821.280
(2.)PM2.5Micro Gram per Meter Cube57205560
(3.)NOxMicro Gram per Meter Cube31.68.63080
(4.)OthersCOMicro Gram per Meter Cube1.260.181.264.0
(5.)PM10Micro Gram per Meter Cube964096100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)OthersZincmg/l0.900.10515
(2.)Chloridesmg/l336712501000
(3.)pHOthers-7.926.956.58.5
(4.)TSSmg/l2.20.800
(5.)TDSmg/l13023765002000
(6.)Total Hardnessmg/l588192200600
(7.)Fluoridemg/l0.660.341.01.5
(8.)Heavy MetalsIronmg/l0.560.160.31.0
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.717.21D
(2.)DOmg/l5.64.2D
(3.)BODmg/l6.64.9D
(4.)CODmg/l24.419D
(5.)OthersZincmg/l0.480.38D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.248.955-75
(2.)Leq(Night)A-weighted decibels(dB(A))52.839.645-65
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare287.6266.8
(2.)Electric ConductivityMillisiemens per Centimetre305.5262.5
(3.)K(Potassium)Kilogram per hectare255.6222.5
(4.)P(Phosphorus)Kilogram per hectare21.516.8
(5.)pH7.727.45
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11 To 19
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 22
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGosunda Dam, Proposed STP Chittorgarh and Udaipur1010023Copy of Permission LetterPipelineIntake WellCEWR/TA(W)/F-23/HZL/98620 May 200934000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Trade Effluent42204800Physio chemical processOthersZero Liquid Discharge42200
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4220
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4220
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)PhosphogypsumIndustrial Waste2700000Tons300RoadOthersSold to cement industries
(2.)Used and waste oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons700RoadOthersSold to authorised recyclers
(3.)Dry ETP SludgeIndustrial Waste6000Tons0.5OthersInternal RoadOthersSecured Landfill at Site
(4.)Discarded containersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons700RoadOthersSold to authorised recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube57.00.150.6957.760
(2.)NOxMicrogram per Meter Cube31.60031.780
(3.)PM10Microgram per Meter Cube960.153.0599.06100
(4.)SO2Microgram per Meter Cube21.50021.680
(5.)Others(Specify)NH3Microgram per Meter Cube2800.3728.38400
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)PAP Fluorine Scrubber StackNA601.8OthersFluorine15 mg/NM3
(2.)DAP/NPK/APS Plant Scrubber StackNA503.1OthersAmmonia25 mg/NM3
(3.)AIF 3 Fluorine Scrubber StackNA300.55OthersFluorine15 mg/NM3
(4.)PAP Scrubber StackNA300.8OthersFluorine15 mg/NM3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 35
(b)Source State Grid / existing Zinc Smelter CPP
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 4 DG (2500 KVA x 4)
(e)Stack Height (in m) 16
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 101.45
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 101.45
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 163.75
(b)Waste/Barren Land (ha.) 0.63
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 8.15
(e)Settlements (ha.) 24.74
(f)Industrial (ha.) 0
(g)Forest (ha.) 100.08
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Land with Open Scrub and mining area 40.67
    Total (ha.) 338.02000000000004
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant47.73-
(2.)Green belt53.7249.31 ha greenbelt developed
Total (ha.) 101.45
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNone0-
(2.)NPANearest RF Bheeliya Khera RF and Other RF7-
(3.)ESAsNone0-
(4.)Wildlife CorridorsNone0-
(5.)Critically Polluted AreaNone0-
(6.)WLSNone0-
(7.)ESZsNone0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0-
(2.)ForestNearest RF Bheeliyakhera RF Other RF7-
(3.)Archaeological SitesChittorgarh Fort8.5South direction from the site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 101.45
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Required land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Seasonal Berach River, Seasonal Gambhiri River and Putholi Nalla
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 5.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Total Area of Green Belt 53.72
(b)Percentage of Total Project Area 52.95
(c)No. of Plants to be Planted 6000
(d)Funds Allocated for Plantation 30000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA070; July 17, 2018 Validity Exten
(ii)Name of the EIA Consultant EQMS India Pvt. Ltd.
(iii)Address 304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower, Community Centre, Karkardooma, Delhi – 110092
(iv)Mobile No. 8826191660
(v)Landline No. 0113000320
(vi)Email Id eqms@eqmsindia.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 23 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterTo, The Member Secretary, IA – Division (Industry 2) 3rd Floor, Vayu Wing, Indira Paryavaran Bhawan, Ministry of Environment, Forest & Climate Change Jorbagh Road, New Delhi-110003. Sub: Submission of status of the land conversion for Proposal No- IA/RJ/IND2/60077/2016, File Number- J- 11011/350/2016 IA.II(I) for grant the Environment Clearance for our proposed Ammonium Phosphate Fertilizer 1.02 MTPA (2 x 0.51 Million TPA) Complex. Ref: Your Office Email dated 17.02.2020 and online ADS dated 20.02.2020. Sir, With reference to the aforesaid subject, we would like to submit that Land was acquired as per Rajasthan Gazette Notification dated 17th /23rd Mar 2007. Copy of mutation released in the name of M/s Hindustan Zinc Limited and Land is in physical possession of Hindustan Zinc. All related documents were submitted to your good office with our reply vide letter dated 01.01.2020. Land Conversion application was submitted vide letter no CLZS/LH/16050 dated 18.12.2018 which is under process of approval and currently pending with State Government. However, due to outbreak of COVID-19 pandemic and imposition as well as succeeding extensions of lockdown across the state from March 2020 onwards process of approval got delayed. We would like to reiterate that on-ground project activities will be carried out only after obtaining the required permissions and Affidavit of commitment for the same is enclosed as Annexure I for your kind consideration. In view of the above, we humbly request you to please consider our submission and grant the Environment Clearance for our proposed Ammonium Phosphate Fertilizer 1.02 MTPA (2 x 0.51 Million TPA) Complex. Thanking you, For Hindustan Zinc Limited Yours faithfully, (Pradeep Singh) Head Environment & Sustainability Encl: as above 18 Dec 2020
2.NASir, This is regarding your proposal for environmental clearance to the project for Setting up Ammonium Phosphate Fertilizer Complex of 1.02 MTPA (2 x 0.51 MTPA) at Village Biliya, Tehsil & District Chittorgarh, Rajasthan by M/s Hindustan Zinc Limited. On examination of the proposal, it is noted that the public hearing for the project was conducted on 12th February, 2019. The main issues raised during public hearing are related to employment, pollution and land conversion for greenbelt to industrial use. The project proponent has informed that application for land conversion was submitted in December, 2018. In this regard, I am directed to request you to submit the status of the land conversion from the State Government of Rajasthan for taking the further action into the matter. 20 Feb 2020
3. ADS Reply LetterTo, The Member Secretary, IA – Division (Industry 2) 3rd Floor, Vayu Wing, Indira Paryavaran Bhawan, Ministry of Environment, Forest & Climate Change Jorbagh Road, New Delhi-110003. Sub: Submission of Additional documents sought (ADS) for closure of Proposal No- IA/RJ/IND2/60077/2016, File Number- J- 11011/350/2016 IA.II(I). Ref: Your Office ADS mail dated 10.11.2019 and subsequently 13th EAC (Industry 2) Minutes of Meeting dated 11.11.2019 for Agenda No 1 dated 24th Oct 2019 Sir, With reference to the aforesaid subject, we hereby submit that all Additional documents sought by MoEF&CC in 13th EAC (Industry 2) Minutes of Meeting dated 11.11.2019 for Agenda No 1 dated 24th Oct 2019 under Point ‘1’ to ‘8’ are enclosed as Appendix A. In view of the above, we humbly request you to please accept our proposal in the upcoming EAC meeting for grant of Environment Clearance for our Proposed Ammonium Phosphate Fertilizer 1.02 MTPA (2 x 0.51 Million TPA) Complex. Thanking you, Yours faithfully, Mahesh Todkar Director- Fertilizer Hindustan Zinc Limited Yashad Bhawan, Udaipur 29 Nov 2019
4.NA

Deferred

10 Nov 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjit Singh Head Fertilizer Project
DesignationChief Project Officer
Name of Company (Applicant Name should not be given here)HZL FERTLIZER PROJECT
AddressHindustan Zinc Limited, Yashad Bhawan, Near Swaroop Sagar
Print