1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | 1.02 MTPA (2 x 0.51 Million TPA) Ammonium Phosphate Fertilizer-Chemical Fertilizer Complex of M/s Hindustan Zinc Limited | (b)Name of the Company / Organisation | HZL FERTLIZER PROJECT | (c)Registered Address | Hindustan Zinc Limited, Yashad Bhawan, Near Swaroop Sagar,,Udaipur,Rajasthan-313004 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ajit Singh Head Fertilizer Project | (b)Designation (Owner/ Partner/ CEO) | Chief Project Officer | (c)Address | Hindustan Zinc Limited,Yashad Bhawan, Near Swaroop Sagar,,Girwa,Udaipur,Rajasthan-313004 | (d)Pin code | 313004 | (e)E-mail | ajit.singh3@vedanta.co.in | (f)STD Code. | 294(f)Telephone No. | 6604013 | (g)Fax No. | 2427734 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(a) Chemical fertilizers
| Minor Activity | 5(a) Chemical fertilizers
| (b)Category | A | (c)Proposal Number | IA/RJ/IND2/60077/2016 | (d)Master Proposal Number(Single Window) | SW/115174/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 38,40,70,272,295,296 & 307 | (b)Pincode | 312021 | (c)Bounded Latitudes (North) | | From | | Degree | 24.969136 | Minutes | | Second | | From | | Degree | 24.975468 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74.659200 | Minutes | | Second | | From | | Degree | 74.667857 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 45 L/9, 45 K/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 399 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | chittorgarh | Chittaurgarh | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J- 11011/350/2016-IA.II(I) | (b)Date of Apply of TOR | 31 Oct 2016 | (c)Date of Issue of TOR / Standard ToR | 13 Dec 2016 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.5 |
| Government Secondary School, Village : Biliya, Chittorgarh, Rajasthan | State : | Rajasthan | District : | chittorgarh | Tehsil : | Chittaurgarh | Village : | Biliya |
| 1500 | Public hearing for the proposed new project was conducted at the Government secondary School Biliya Premises in the presence of ADM, Revenue department officials and Regional Officer of RSPCB.
Issue | Others | ADM | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Aluminium Fluoride Plant | 18000 TPA | Two Phases | (2.) | DAP/NPK/APS Plant | 1.02 MTPA/1.0 MTPA/0.4 MTPA | Two Phases | (3.) | Phosphoric Acid Plant | 0.48 MTPA 100% P2O5 BASIS | Two Phases | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Phosphoric acid (100% P2O5 basis) | 480000 | Tons per Annum | | Others | Will be consumed within the process. | (2.) | DAP/NPK/APS | 1020000 | Tons per Annum | | Road,Rail | | (3.) | Aluminium Fluoride | 18000 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2700 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 185 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 13.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 37 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3479000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 3479000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sulfuric Acid | 1440000 | Tons per Annum | | Captive | Others | Pipeline | 0.7 | Captive | | Copy of Linkage | (2.) | Potash | 64000 | Tons per Annum | | Import | Road,Rail | | 580 | Open Market | | Copy of Linkage | (3.) | Aluminum hydroxide | 21000 | Tons per Annum | | Domestic | Road,Rail | | 1100 | Others | Group Company | Copy of Linkage | (4.) | ammonia | 240000 | Tons per Annum | | Import | Road,Rail | | 580 | Open Market | | Copy of Linkage | (5.) | Rock Phosphate | 1580000 | Tons per Annum | | Import | Road,Rail | | 580 | Open Market | | Copy of Linkage | (6.) | Urea | 22000 | Tons per Annum | | Import | Road,Rail | | 580 | Open Market | | Copy of Linkage | (7.) | Filler | 112000 | Tons per Annum | | Domestic | Road,Rail | | 600 | Open Market | Market | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 21.5 | 6.8 | 21.2 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 57 | 20 | 55 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 31.6 | 8.6 | 30 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 1.26 | 0.18 | 1.26 | 4.0 | (5.) | PM10 | | Micro Gram per Meter Cube | 96 | 40 | 96 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Others | Zinc | | mg/l | | 0.90 | 0.10 | 5 | 15 | (2.) | Chlorides | | | mg/l | | 336 | 71 | 250 | 1000 | (3.) | pH | | | Others | - | 7.92 | 6.95 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 2.2 | 0.8 | 0 | 0 | (5.) | TDS | | | mg/l | | 1302 | 376 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 588 | 192 | 200 | 600 | (7.) | Fluoride | | | mg/l | | 0.66 | 0.34 | 1.0 | 1.5 | (8.) | Heavy Metals | | Iron | mg/l | | 0.56 | 0.16 | 0.3 | 1.0 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.71 | 7.21 | D | (2.) | DO | | mg/l | | 5.6 | 4.2 | D | (3.) | BOD | | mg/l | | 6.6 | 4.9 | D | (4.) | COD | | mg/l | | 24.4 | 19 | D | (5.) | Others | Zinc | mg/l | | 0.48 | 0.38 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.2 | 48.9 | 55-75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.8 | 39.6 | 45-65 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 287.6 | 266.8 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 305.5 | 262.5 | (3.) | K(Potassium) | Kilogram per hectare | | 255.6 | 222.5 | (4.) | P(Phosphorus) | Kilogram per hectare | | 21.5 | 16.8 | (5.) | pH | | | 7.72 | 7.45 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 11 To 19 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5 To 22 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Gosunda Dam, Proposed STP Chittorgarh and Udaipur | 10100 | 23 | Copy of Permission Letter | Pipeline | | Intake Well | | CEWR/TA(W)/F-23/HZL/986 | 20 May 2009 | 34000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Trade Effluent | 4220 | 4800 | Physio chemical process | Others | Zero Liquid Discharge | 4220 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4220 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 4220 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Phosphogypsum | Industrial Waste | | 2700000 | Tons | 300 | Road | | Others | Sold to cement industries | (2.) | Used and waste oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 300 | Tons | 700 | Road | | Others | Sold to authorised recyclers | (3.) | Dry ETP Sludge | Industrial Waste | | 6000 | Tons | 0.5 | Others | Internal Road | Others | Secured Landfill at Site | (4.) | Discarded containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 700 | Road | | Others | Sold to authorised recyclers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 57.0 | 0.15 | 0.69 | 57.7 | 60 | (2.) | NOx | | Microgram per Meter Cube | 31.6 | 0 | 0 | 31.7 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 96 | 0.15 | 3.05 | 99.06 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 21.5 | 0 | 0 | 21.6 | 80 | (5.) | Others(Specify) | NH3 | Microgram per Meter Cube | 28 | 0 | 0.37 | 28.38 | 400 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | PAP Fluorine Scrubber Stack | NA | 60 | 1.8 | Others | Fluorine | 15 mg/NM3 | (2.) | DAP/NPK/APS Plant Scrubber Stack | NA | 50 | 3.1 | Others | Ammonia | 25 mg/NM3 | (3.) | AIF 3 Fluorine Scrubber Stack | NA | 30 | 0.55 | Others | Fluorine | 15 mg/NM3 | (4.) | PAP Scrubber Stack | NA | 30 | 0.8 | Others | Fluorine | 15 mg/NM3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 35 | (b)Source | State Grid / existing Zinc Smelter CPP | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 4 DG (2500 KVA x 4) | (e)Stack Height (in m) | 16 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 101.45 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 101.45 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 163.75 | (b)Waste/Barren Land (ha.) | 0.63 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 8.15 | (e)Settlements (ha.) | 24.74 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 100.08 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Land with Open Scrub and mining area | 40.67 | Total (ha.) | 338.02000000000004 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 47.73 | - | (2.) | Green belt | | 53.72 | 49.31 ha greenbelt developed | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | None | 0 | - | (2.) | NPA | Nearest RF Bheeliya Khera RF and Other RF | 7 | - | (3.) | ESAs | None | 0 | - | (4.) | Wildlife Corridors | None | 0 | - | (5.) | Critically Polluted Area | None | 0 | - | (6.) | WLS | None | 0 | - | (7.) | ESZs | None | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None | 0 | - | (2.) | Forest | | Nearest RF Bheeliyakhera RF Other RF | 7 | - | (3.) | Archaeological Sites | | Chittorgarh Fort | 8.5 | South direction from the site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 101.45 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Required land is already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Seasonal Berach River, Seasonal Gambhiri River and Putholi Nalla | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 5.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 250 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 53.72 | (b)Percentage of Total Project Area | 52.95 | (c)No. of Plants to be Planted | 6000 | (d)Funds Allocated for Plantation | 30000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA070; July 17, 2018 Validity Exten | (ii)Name of the EIA Consultant | EQMS India Pvt. Ltd. | (iii)Address | 304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower, Community Centre, Karkardooma, Delhi – 110092 | (iv)Mobile No. | 8826191660 | (v)Landline No. | 0113000320 | (vi)Email Id | eqms@eqmsindia.org | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 23 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | To,
The Member Secretary,
IA – Division (Industry 2)
3rd Floor, Vayu Wing, Indira Paryavaran Bhawan,
Ministry of Environment, Forest & Climate Change
Jorbagh Road, New Delhi-110003.
Sub: Submission of status of the land conversion for Proposal No- IA/RJ/IND2/60077/2016, File Number- J- 11011/350/2016 IA.II(I) for grant the Environment Clearance for our proposed Ammonium Phosphate Fertilizer 1.02 MTPA (2 x 0.51 Million TPA) Complex.
Ref: Your Office Email dated 17.02.2020 and online ADS dated 20.02.2020.
Sir,
With reference to the aforesaid subject, we would like to submit that Land was acquired as per Rajasthan Gazette Notification dated 17th /23rd Mar 2007. Copy of mutation released in the name of M/s Hindustan Zinc Limited and Land is in physical possession of Hindustan Zinc. All related documents were submitted to your good office with our reply vide letter dated 01.01.2020.
Land Conversion application was submitted vide letter no CLZS/LH/16050 dated 18.12.2018 which is under process of approval and currently pending with State Government. However, due to outbreak of COVID-19 pandemic and imposition as well as succeeding extensions of lockdown across the state from March 2020 onwards process of approval got delayed.
We would like to reiterate that on-ground project activities will be carried out only after obtaining the required permissions and Affidavit of commitment for the same is enclosed as Annexure I for your kind consideration.
In view of the above, we humbly request you to please consider our submission and grant the Environment Clearance for our proposed Ammonium Phosphate Fertilizer 1.02 MTPA (2 x 0.51 Million TPA) Complex.
Thanking you,
For Hindustan Zinc Limited
Yours faithfully,
(Pradeep Singh)
Head Environment & Sustainability
Encl: as above | 18 Dec 2020 | 2. | NA | Sir,
This is regarding your proposal for environmental clearance to the project for Setting up Ammonium Phosphate Fertilizer Complex of 1.02 MTPA (2 x 0.51 MTPA) at Village Biliya, Tehsil & District Chittorgarh, Rajasthan by M/s Hindustan Zinc Limited.
On examination of the proposal, it is noted that the public hearing for the project was conducted on 12th February, 2019. The main issues raised during public hearing are related to employment, pollution and land conversion for greenbelt to industrial use. The project proponent has informed that application for land conversion was submitted in December, 2018.
In this regard, I am directed to request you to submit the status of the land conversion from the State Government of Rajasthan for taking the further action into the matter. | 20 Feb 2020 | 3. | ADS Reply Letter | To,
The Member Secretary,
IA – Division (Industry 2)
3rd Floor, Vayu Wing, Indira Paryavaran Bhawan,
Ministry of Environment, Forest & Climate Change
Jorbagh Road, New Delhi-110003.
Sub: Submission of Additional documents sought (ADS) for closure of Proposal No- IA/RJ/IND2/60077/2016, File Number- J- 11011/350/2016 IA.II(I).
Ref: Your Office ADS mail dated 10.11.2019 and subsequently 13th EAC (Industry 2) Minutes of Meeting dated 11.11.2019 for Agenda No 1 dated 24th Oct 2019
Sir,
With reference to the aforesaid subject, we hereby submit that all Additional documents sought by MoEF&CC in 13th EAC (Industry 2) Minutes of Meeting dated 11.11.2019 for Agenda No 1 dated 24th Oct 2019 under Point ‘1’ to ‘8’ are enclosed as Appendix A.
In view of the above, we humbly request you to please accept our proposal in the upcoming EAC meeting for grant of Environment Clearance for our Proposed Ammonium Phosphate Fertilizer 1.02 MTPA (2 x 0.51 Million TPA) Complex.
Thanking you,
Yours faithfully,
Mahesh Todkar
Director- Fertilizer
Hindustan Zinc Limited
Yashad Bhawan, Udaipur | 29 Nov 2019 | 4. | NA | Deferred
| 10 Nov 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ajit Singh Head Fertilizer Project | Designation | Chief Project Officer | Name of Company (Applicant Name should not be given here) | HZL FERTLIZER PROJECT | Address | Hindustan Zinc Limited, Yashad Bhawan, Near Swaroop Sagar |
|