1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed LNG & LPG Import Facilities With Captive Jetty and Breakwaters at T. Challapalli (V), Uppalaguptam Mandal, East Godavari District, Andhra Pradesh, India by M/s. Hindustan LNG Ltd | (b)Name of the Company / Organisation | HINDUSTAN LNG LIMITED | (c)Registered Address | 6-2-913/914,2nd Floor Progressive Towers, Khairtabad, Hyderabad,,Hyderabad,Telangana-500004 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Bharat Mathukumilli | (b)Designation (Owner/ Partner/ CEO) | CEO | (c)Address | Hindustan LNG Limited,Kakinada,,,kakinada,Andhra Pradesh-533101 | (d)Pin code | 533101 | (e)E-mail | hindustanlng@gmail.com | (f)STD Code. | 40(f)Telephone No. | 23326095 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | 6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
| (b)Category | A | (c)Proposal Number | IA/AP/MIS/64642/2017 | (d)Master Proposal Number(Single Window) | SW/115156/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 725/783,725/784 & 721 156, 157, 158, 255, 256, 257 | (b)Pincode | 533213 | (c)Bounded Latitudes (North) | | From | | Degree | 162811.79 | Minutes | | Second | | From | | Degree | 162823.67 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82455.12 | Minutes | | Second | | From | | Degree | 82514.37 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E44W3/65L3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 8 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.05 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Andhra Pradesh | East Godavari | Uppalaguptam | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-32/2017-IA-III | (c)Date of Apply of TOR | 11 May 2017 | (d)Date of Issue of TOR / Standard ToR | 17 Aug 2017 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Jun 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| Zilla Parishad High School ground | State : | Andhra Pradesh | District : | East Godavari | Tehsil : | Uppalaguptam | Village : | Challapalli |
| 400 | People requested to provide employment of local educated youth and also provide drinking water facilities | Others | Addl. District Megistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | LNG FSU | 173000 m3 | no | (2.) | LPG FSU | 20000 m3 | no | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | LNG | 11 | Others | MMTPA | Pipe Conveyor | | (2.) | LPG | 4 | Others | MMTPA | Pipe Conveyor | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2800 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 56.35 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 56 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.8 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 00 | 0 | Tons per Annum | | india | Pipe Conveyor | | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Mili Gram per Meter Cube | 5.0 | 1.0 | 4.2 | 2 | (2.) | PM10 | | Micro Gram per Meter Cube | 57.5 | 48.3 | 57.3 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 28.3 | 21.4 | 28.1 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 14.0 | 8.6 | 13.5 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 16.0 | 9.7 | 15.2 | 80 | |
14.2. No. of Ground Water monitoring locations : 07 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0.8 | 0.2 | 1.0 | 1.5 | (2.) | Heavy Metals | | Hg | mg/l | | 0.001 | 0.001 | 0.001 | 0 | (3.) | Others | Sulphate | | mg/l | | 1224 | 25.2 | 200 | 400 | (4.) | pH | | | NA | | 8.13 | 7.37 | 6.5 | 8.5 | (5.) | TDS | | | mg/l | | 16380 | 676 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 3583.8 | 145.9 | 200 | 600 | (7.) | Heavy Metals | | Total Arsenic | mg/l | | 0.01 | 0.01 | 0 | 0 | (8.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (9.) | Chlorides | | | mg/l | | 7964 | 125 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.91 | 7.38 | A | (2.) | BOD | | mg/l | | 20 | 5 | B | (3.) | COD | | mg/l | | 65 | 16 | B | (4.) | DO | | mg/l | | 7.2 | 6.3 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.3 | 39.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.8 | 31.8 | 70 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 3.92 | 0.73 | (2.) | P(Phosphorus) | Kilogram per hectare | | 2909 | 5 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 26.6 | 0.2 | (4.) | pH | | | 7.04 | 6.33 | (5.) | K(Potassium) | Kilogram per hectare | | 1803 | 230.3 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 3 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 3.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | canal | 70 | 5 | Copy of Permission Letter | modeOthers | Tankers | Others | Motors | 0 | 18 Jun 2019 | 70 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | LNG Carrier | 1 | 3 | Sea Water DIscharge | Discharge into Seawater Body | | | 1 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1 | (b)Total Discharged Water (Kilolitre per Day) | 1 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 0.008 | Tons | 5 | Road | | Authorized Recyclers | | (2.) | Hazardous waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.006 | Tons | 5 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 0 | 1 | 0 | 1 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 0 | 1 | 0 | 1 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 1 | 0 | 1 | 60 | (4.) | NOx | | Microgram per Meter Cube | 36.5 | 1 | 0.83 | 37.53 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Stack | LNG | 43.2 | 1.66 | PM10 | | 0 | (2.) | stack | LNG | 43.2 | 1.66 | SO2 | | 0 | (3.) | Stack | LNG | 43.2 | 1.66 | NOx | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 25 | (b)Source | Boil Off Gas | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 119.41 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 119.41 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 12155 | (b)Waste/Barren Land (ha.) | 71.59 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 26607 | (e)Settlements (ha.) | 1178 | (f)Industrial (ha.) | 203.92 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 222.47 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 8633 | Total (ha.) | 49070.979999999996 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 59.75 | none | (2.) | Township | | 0 | none | (3.) | Green belt | | 39.40 | None | (4.) | Ash Pond | | 0 | Not Required | (5.) | Quarry Area | | 0 | Not Required | (6.) | OB Dump Area | | 0 | None | (7.) | Safety Zone | | 2.3 | Safety Zone Area | (8.) | Tailing Pond | | 0 | Not Required | (9.) | Area for Solid Waste Management | | 10 | | (10.) | Built Up Area | | 7.96 | None | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | not applicable | 0 | none | (2.) | ESAs | not applicable | 0 | none | (3.) | NPA | not applicable | 0 | none | (4.) | Critically Polluted Area | not applicabl | 0 | none | (5.) | ESZs | not applicable | 0 | none | (6.) | Corridors | not applicable | 0 | none | (7.) | Wildlife Corridors | not applicable | 0 | none | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | not applicable | 0 | none | (2.) | Defence Installations | | not applicable | 0 | none | (3.) | Archaeological Sites | | not applicable | 0 | none | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 119.41 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 2350 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 2500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 39.4 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 100000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Safe, cost effective and environment friendly as compared to other fuels . Combustion of re-gasified LNG emits negligible or no sulphur dioxide, thereby will lead to clean burning. Because of its clean burning, it doesn’t leave behind any unpleasant soot, ash, or odors. | (2.) | Financial | It will help to spur additional industrial and commercial growth that would benefit from the availability of Natural Gas and lower energy prices, as it is comparatively cheaper than alternative fuels. | (3.) | Social | The quality of life in the region is likely to improve due to the creation of limited direct but more indirect jobs for the local people. This will result in more than one earning member in the family, reduce the dependency on a single earner, and enable them with better economic freedom. HLNG can provide vocational training for enhancement in skills to the unemployed youths in the study area in order to develop their skills, knowledge and appropriate qualifications which will lead the way to de | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | not applicable | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Not applicable | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0049 | (ii)Name of the EIA Consultant | M/s. Bhagavathi Ana Labs Pvt Ltd | (iii)Address | M/s. Bhagavathi Ana Labs PVT LTD, 7-2-C14, industrial area,, Sanath Nagar | (iv)Mobile No. | 9866185534 | (v)Landline No. | 0406816090 | (vi)Email Id | environmental.hyderabad@in.bureauveritas.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 01 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Kindly submit/upload the following documents for further consideration:
1. As per ToR condition No. iii, submit recommendations of Coastal Zone Management Authority (CZMA) for the proposed EC&CRZ clearance.
2. Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018.
3. Submit point wise issues raised by local residents during public hearing along with submission/action plan of project proponent. | 09 Sep 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Bharat Mathukumilli | Designation | CEO | Name of Company (Applicant Name should not be given here) | HINDUSTAN LNG LIMITED | Address | 6-2-913/914,2nd Floor Progressive Towers, Khairtabad, Hyderabad |
|