Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed LNG & LPG Import Facilities With Captive Jetty and Breakwaters at T. Challapalli (V), Uppalaguptam Mandal, East Godavari District, Andhra Pradesh, India by M/s. Hindustan LNG Ltd
(b)Name of the Company / Organisation HINDUSTAN LNG LIMITED
(c)Registered Address 6-2-913/914,2nd Floor Progressive Towers, Khairtabad, Hyderabad,,Hyderabad,Telangana-500004
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bharat Mathukumilli
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Hindustan LNG Limited,Kakinada,,,kakinada,Andhra Pradesh-533101
(d)Pin code 533101
(e)E-mail hindustanlng@gmail.com
(f)STD Code. 40(f)Telephone No. 23326095
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
(b)Category A
(c)Proposal Number IA/AP/MIS/64642/2017
(d)Master Proposal Number(Single Window) SW/115156/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 725/783,725/784 & 721 156, 157, 158, 255, 256, 257
(b)Pincode 533213
(c)Bounded Latitudes (North)
From
Degree 162811.79
Minutes
Second
From
Degree 162823.67
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82455.12
Minutes
Second
From
Degree 82514.37
Minutes
Second
(e)Survey of India Topo Sheet No. E44W3/65L3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 8
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.05
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshEast GodavariUppalaguptam
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-32/2017-IA-III
(c)Date of Apply of TOR 11 May 2017
(d)Date of Issue of TOR / Standard ToR 17 Aug 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :2
Zilla Parishad High School ground
State :Andhra Pradesh
District :East Godavari
Tehsil :Uppalaguptam
Village :Challapalli
400People requested to provide employment of local educated youth and also provide drinking water facilitiesOthersAddl. District Megistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)LNG FSU173000 m3no
(2.)LPG FSU20000 m3no
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LNG11OthersMMTPAPipe Conveyor
(2.)LPG4OthersMMTPAPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2800
(b) Funds Allocated for Environment Management (Capital) (in Crores) 56.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 56
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.8
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000Tons per AnnumindiaPipe Conveyor0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube5.01.04.22
(2.)PM10Micro Gram per Meter Cube57.548.357.3100
(3.)PM2.5Micro Gram per Meter Cube28.321.428.160
(4.)SO2Micro Gram per Meter Cube14.08.613.580
(5.)NOxMicro Gram per Meter Cube16.09.715.280
    14.2.     No. of Ground Water monitoring locations : 07
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.80.21.01.5
(2.)Heavy MetalsHgmg/l0.0010.0010.0010
(3.)OthersSulphatemg/l122425.2200400
(4.)pHNA8.137.376.58.5
(5.)TDSmg/l163806765002000
(6.)Total Hardnessmg/l3583.8145.9200600
(7.)Heavy MetalsTotal Arsenicmg/l0.010.0100
(8.)TSSmg/l0000
(9.)Chloridesmg/l79641252501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.917.38A
(2.)BODmg/l205B
(3.)CODmg/l6516B
(4.)DOmg/l7.26.3A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.339.575
(2.)Leq(Night)A-weighted decibels(dB(A))55.831.870
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare3.920.73
(2.)P(Phosphorus)Kilogram per hectare29095
(3.)Electric ConductivityMillisiemens per Centimetre26.60.2
(4.)pH7.046.33
(5.)K(Potassium)Kilogram per hectare1803230.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 3.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherscanal705Copy of Permission LettermodeOthersTankersOthersMotors018 Jun 201970
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)LNG Carrier13Sea Water DIschargeDischarge into Seawater Body1
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1
(b)Total Discharged Water (Kilolitre per Day) 1
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste0.008Tons5RoadAuthorized Recyclers
(2.)Hazardous wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.006Tons5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube0101100
(2.)SO2Microgram per Meter Cube010180
(3.)PM2.5Microgram per Meter Cube010160
(4.)NOxMicrogram per Meter Cube36.510.8337.5380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)StackLNG43.21.66PM100
(2.)stackLNG43.21.66SO20
(3.)StackLNG43.21.66NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 25
(b)Source Boil Off Gas
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 119.41
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 119.41
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 12155
(b)Waste/Barren Land (ha.) 71.59
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 26607
(e)Settlements (ha.) 1178
(f)Industrial (ha.) 203.92
(g)Forest (ha.) 0
(h)Mangroves (ha.) 222.47
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 8633
    Total (ha.) 49070.979999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant59.75none
(2.)Township0none
(3.)Green belt39.40None
(4.)Ash Pond0Not Required
(5.)Quarry Area0Not Required
(6.)OB Dump Area0None
(7.)Safety Zone2.3Safety Zone Area
(8.)Tailing Pond0Not Required
(9.)Area for Solid Waste Management10
(10.)Built Up Area7.96None
Total (ha.) 119.41
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnot applicable0none
(2.)ESAsnot applicable0none
(3.)NPAnot applicable0none
(4.)Critically Polluted Areanot applicabl0none
(5.)ESZsnot applicable0none
(6.)Corridorsnot applicable0none
(7.)Wildlife Corridorsnot applicable0none
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnot applicable0none
(2.)Defence Installationsnot applicable0none
(3.)Archaeological Sitesnot applicable0none
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 119.41
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 2350
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 2500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 39.4
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 100000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSafe, cost effective and environment friendly as compared to other fuels . Combustion of re-gasified LNG emits negligible or no sulphur dioxide, thereby will lead to clean burning. Because of its clean burning, it doesn’t leave behind any unpleasant soot, ash, or odors.
(2.)FinancialIt will help to spur additional industrial and commercial growth that would benefit from the availability of Natural Gas and lower energy prices, as it is comparatively cheaper than alternative fuels.
(3.)SocialThe quality of life in the region is likely to improve due to the creation of limited direct but more indirect jobs for the local people. This will result in more than one earning member in the family, reduce the dependency on a single earner, and enable them with better economic freedom. HLNG can provide vocational training for enhancement in skills to the unemployed youths in the study area in order to develop their skills, knowledge and appropriate qualifications which will lead the way to de
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking not applicable
5.
Energy Saving Measures:
(a)Source/Mode Not applicable
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area not applicable
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0049
(ii)Name of the EIA Consultant M/s. Bhagavathi Ana Labs Pvt Ltd
(iii)Address M/s. Bhagavathi Ana Labs PVT LTD, 7-2-C14, industrial area,, Sanath Nagar
(iv)Mobile No. 9866185534
(v)Landline No. 0406816090
(vi)Email Id environmental.hyderabad@in.bureauveritas.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 01 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAKindly submit/upload the following documents for further consideration: 1. As per ToR condition No. iii, submit recommendations of Coastal Zone Management Authority (CZMA) for the proposed EC&CRZ clearance. 2. Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. 3. Submit point wise issues raised by local residents during public hearing along with submission/action plan of project proponent. 09 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBharat Mathukumilli
DesignationCEO
Name of Company (Applicant Name should not be given here)HINDUSTAN LNG LIMITED
Address6-2-913/914,2nd Floor Progressive Towers, Khairtabad, Hyderabad
Print