1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | ENHANCEMENT OF CAMPHOR AND ITS DERIVATIVES PRODUCTION & INCREASE IN TOTAL LAND AREA | (b)Name of the Company / Organisation | M/S KANCHI KARPOORAM LTD | (c)Registered Address | SF No.669,672,670/2, 676/1, 674/1, Enadur Village, Parandur Road, Karaipettai Post, Kancheepuram Taluk, Kancheepuram District Tamil Nadu 631552,,Kanchipuram,Tamil Nadu-631552 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dipesh Suresh Jain | (b)Designation (Owner/ Partner/ CEO) | ExecutiveDirector | (c)Address | SF No.669, 672, 670/2, 676/1 674/1,Enadur Village, Parandur Road, Karaipettai Post, Kancheepuram Taluk, Kancheepuram District Tamil Nadu Pin code 631552,Kancheepuram,Kanchipuram,Tamil Nadu-631552 | (d)Pin code | 631552 | (e)E-mail | admin@kanchikarpooram.com | (f)STD Code. | 44(f)Telephone No. | 26401914 | (g)Fax No. | 26401919 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TN/IND2/115127/2019 | (d)Master Proposal Number(Single Window) | SW/115126/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 669, 672, 670/2, 676/1 &674/1,667/1,668/1,668/2A, | (b)Pincode | 631552 | (c)Bounded Latitudes (North) | | From | | Degree | 12.875699 | Minutes | | Second | | From | | Degree | 12.879730 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.710303 | Minutes | | Second | | From | | Degree | 79.710517 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57 P/9 and 57 P/13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 82 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.02 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/143/2019-IA-II(I) | (b)Date of Apply of TOR | 06 Apr 2019 | (c)Date of Issue of TOR / Standard ToR | 10 May 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 5.0 |
| Sri Lakshmi Narayana Mahal & Party Hall | State : | Tamil Nadu | District : | Kanchipuram | Tehsil : | Kancheepuram | Village : | Enathur |
| 84 | Nil | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Isomerisation reactor (KL) | 2 x 6 and 2 x 12 | Existing and Proposed | (2.) | Fire water Pump (m3/hr) | 150 | Existing | (3.) | Crude Isobornyl acetate fraction columns (mm) | 2 Nos | Structured packing | (4.) | Gum Turpentine/Pinene SS Column(mm) | 1 No | Structured packing | (5.) | Camphene Fractionation SS Column (mm) | 1 No | Structured packing | (6.) | Camphor Distillation SS Packed Column (Nos) | 2 Nos | Structured packing | (7.) | Saponification (Isobornyl acetate) reactor (KL) | 2 x 6 and 3 x 12 | Existing and Proposed | (8.) | Dehydrogenation reactor (KL) | 3 x 3 , 1 x 7 and 2 x 12 | Existing and Proposed | (9.) | Cooling Tower (m3/hr) | 1x400 and 1x 300 | Existing and Proposed | (10.) | Campene Esterification reactor (KL) | 3 x 6 and 1 x 12 | Existing and Proposed | (11.) | TFH (Wood Fire heater(MW/hr) | 1 x 1.74 and 1 x 4.65 | Existing and Proposed | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Camphor | 550 | Others | MT/Month | Road,Rail | | (2.) | Terpeneolene / Dipentene | 349.6 | Others | MT/Month | Road,Rail | | (3.) | Rosin Oil | 10 | Others | MT/Month | Road,Rail | | (4.) | Spent Caustic lye | 36.11 | Others | MT/Month | Road,Rail | | (5.) | Sodium Acetate Tri Hydrate | 575.5 | Others | MT/Month | Road,Rail | | (6.) | Sodium Acetate as liquor and Alternate to Solid tri hydrate | 193 | Others | MT/Month | Road,Rail | | (7.) | Camphor Oil | 2 | Others | MT/Month | Road,Rail | | (8.) | Turpentine oil(Turpentine KATEL) | 98.475 | Others | MT/Month | Road,Rail | | (9.) | Iso Bornyl Acetate | 510 | Others | MT/Month | Road,Rail | | (10.) | Esters | 15 | Others | MT/Month | Road,Rail | | (11.) | Longifoluences | 10 | Others | MT/Month | Road,Rail | | (12.) | Double Distilled Turpentine | 30 | Others | MT/Month | Road,Rail | | (13.) | Camphene | 550 | Others | MT/Month | Road,Rail | | (14.) | Rosin Size | 100 | Others | MT/Month | Road,Rail | | (15.) | Pine Oil (Terpenol) | 100 | Others | MT/Month | Road,Rail | | (16.) | Maleics | 15 | Others | MT/Month | Road,Rail | | (17.) | Phenolics | 20 | Others | MT/Month | Road,Rail | | (18.) | Pine Pitch | 36.5 | Others | MT/Month | Road,Rail | | (19.) | Gum Rosin | 295.62 | Others | MT/Month | Road,Rail | | (20.) | Phenolics | 20 | Others | MT/Month | Road,Rail | | (21.) | Other Rosin Derivatives | 20 | Others | MT/Month | Road,Rail | | (22.) | Terpenic Oil | 20 | Others | MT/Month | Road,Rail | | (23.) | Pine Tar | 60 | Others | MT/Month | Road,Rail | | (24.) | Iso Bornyl Crude | 550 | Others | MT/Month | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 23 Jul 2019 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 1908223413884 | (vi)Application No. | T2/TNPCB/F.0929SPR/RL/SPR/A/2019 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 14 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.70 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.14 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.3 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 36 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 36 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 36 raw materials | 28773.42 | Tons per Annum | | Local | Road,Rail | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Jul 2018 To 26 Sep 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 33.6 | 16.8 | 33.0 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 71.2 | 38.4 | 70.3 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 18.2 | 5.0 | 17.4 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 35.7 | 18.9 | 34.7 | 60 | |
14.2. No. of Ground Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.04 | 7.2 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 1 | 1 | 100 | 100 | (3.) | Total Hardness | | | mg/l | | 611 | 200 | 200 | 600 | (4.) | TDS | | | mg/l | | 1310 | 591 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 425.6 | 143.52 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.58 | 0.48 | 1 | 1.5 | (7.) | Heavy Metals | | Zinc | mg/l | | 0.1 | 0.1 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 12.4 | 9.4 | D | (2.) | pH | | NA | | 8.41 | 6.65 | A | (3.) | BOD | | mg/l | | 3.7 | 3 | C | (4.) | DO | | mg/l | | 6.1 | 5.2 | B | |
14.4. No. of Ambient Noise monitoring locations : 08 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.3 | 50.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.0 | 42.1 | 70 | |
14.5. No. of Soil Sample Monitored locations : 08 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 47 | 37 | (2.) | Electric Conductivity | Others | µS/cm | 330 | 192 | (3.) | pH | | | 7.24 | 6.93 | (4.) | K(Potassium) | Milligram per Kilogram | | 500 | 120 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 840.06 | 212.32 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 7 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 7 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 96 | 0.15 | Copy of Permission Letter | Pipeline | | Tube Well | | Lr. No. 105 DD(G)/AG –VI/Fresh Noc/2018 | 07 May 2018 | 120 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage | 8 | 10 | STP | Green Belt Renewal Plant,Others | Loss | 7 | 1 | (2.) | Effluent | 11.5 | 20 | ZLD | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 11.5 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 19.5 | (b)Total Discharged Water (Kilolitre per Day) | 1 | (c)Total Reused Water (Kilolitre per Day) | 18.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Organic waste | Municipal Solid Waste | | 0.5832 | Tons | 5 | Road | | Others | Municipal bin including food waste | (2.) | Inorganic waste | Municipal Solid Waste | | 0.0648 | Tons | 12 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Ash from wood | Fly Ash | | 0.192 | Tons | 6 | Road | | Others | Given to local former for agriculture purpose | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 33.6 | 0 | 0.5701 | 34.18 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 71.2 | 0 | 0.4096 | 71.61 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 35.7 | 0 | 0.4096 | 36.11 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 18.2 | 0 | 0.1964 | 18.4 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1x180 kVA DG | Diesel | 7.5 | 0.3 | PM10 | | 2.77E-05 | (2.) | 1x4.65 MW/Hr TFH | Fire wood | 30 | 0.5 | PM10 | | 0.194 | (3.) | 1.74 MW/Hr TFH | Fire wood | 30 | 0.5 | PM10 | | 0.194 | (4.) | 1x380 kVA DG | Diesel | 12 | 0.3 | PM10 | | 5.85E-05 | (5.) | 1x250 kVA DG | Diesel | 12 | 0.3 | PM10 | | 3.85E-05 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 360 | (b)Source | TANGEDCO | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 X 380 KVA and 1 X 180 KVA | (e)Stack Height (in m) | 12 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.13949 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.13949 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22285 | (b)Waste/Barren Land (ha.) | 420 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 7800 | (e)Settlements (ha.) | 1825 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Mining | 150 | Total (ha.) | 32480 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Overall plant are | 4.13949 | Ha | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | Nil | (2.) | NPA | Nil | 0 | Nil | (3.) | ESAs | Nil | 0 | Nil | (4.) | ESZs | Nil | 0 | Nil | (5.) | Corridors | Nil | 0 | Nil | (6.) | Wildlife Corridors | Nil | 0 | Nil | (7.) | Critically Polluted Area | Nil | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 0 | Nil | (2.) | Forest | | Nil | 0 | Nil | (3.) | Defence Installations | | Nil | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tamarai Tangal | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 0.02 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 140 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 160 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.37 | (b)Percentage of Total Project Area | 33.10 | (c)No. of Plants to be Planted | 2055 | (d)Funds Allocated for Plantation | 3000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0083 | (ii)Name of the EIA Consultant | HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI | (iii)Address | Hubert Enviro Care Systems (P) Ltd. A-21, (Behind Lions Club School) III Phase, Thiru Vi Ka Industrial Estate. Guindy, Chennai - 600 032. | (iv)Mobile No. | 9884390811 | (v)Landline No. | 0444363555 | (vi)Email Id | moses@hecs.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 13 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dipesh Suresh Jain | Designation | ExecutiveDirector | Name of Company (Applicant Name should not be given here) | M/S KANCHI KARPOORAM LTD | Address | SF No.669,672,670/2, 676/1, 674/1, Enadur Village, Parandur Road, Karaipettai Post, Kancheepuram Taluk, Kancheepuram District Tamil Nadu 631552 |
|