Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Tagoor Laboratories Pvt. Ltd.
(b)Name of the Company / Organisation TAGOOR LABORATORIES PRIVATE LIMITED
(c)Registered Address Survey No. 29, Village - Tupakulagudem, Mandal - Tallapudi, District - West Godavari,,West Godavari,Andhra Pradesh-534341
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kasiviswanadha Raju
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Survey No. 29, Village - Tupakulagudem, Mandal - Tallapudi, District - West Godavari,,Balanagar,Rangareddi,Telangana-500072
(d)Pin code 500072
(e)E-mail tagoorlab@gmail.com
(f)STD Code. 40(f)Telephone No. 23070602
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/115117/2018
(d)Master Proposal Number(Single Window) SW/115078/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy No: 29
(b)Pincode 534341
(c)Bounded Latitudes (North)
From
Degree 17
Minutes
Second
From
Degree 17
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81
Minutes
Second
From
Degree 81
Minutes
Second
(e)Survey of India Topo Sheet No. 65 G/8, 65 G/11 and 65 G/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 82
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.80
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/416/2018-IA-II(I)
(b)Date of Apply of TOR 21 Dec 2018
(c)Date of Issue of TOR / Standard ToR 04 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0
Tagoor Laboratories Pvt. Ltd.
State :Andhra Pradesh
District :West Godavari
Tehsil :Tallapudi
Village :Tupakulagudem
58No major issues raised during Public hearing. Some people are suggested to develop greenbelt, maintain ZLD system properly etc during public hearing. All the villagers and NGOs are welcomed the proposOthersDistrict Revenue Officer
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Coal Fired/ Fuel Briquette Boiler6 TPH (Continuing)
(2.)Thermic Fluid Heater2,00,000 KCal./Hr (Continuing)
(3.)Cooling Towers5 x 200 TR & 5 x 500 TR
(4.)Coal Fired/ Fuel Briquette Boiler12 TPH
(5.)D.G.Set2 x 1000 KVA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bupropion5.00OthersMT/ MonthRoad
(2.)Carisoprodol2.00OthersMT/ MonthRoad
(3.)Cyclobenzaprine HCl5.00OthersMT/MonthRoad
(4.)Domperidone maleate2.00OthersMT/ MonthRoad
(5.)Esomeprazole Sodium3.00OthersMT/ MonthRoad
(6.)Esomeprazole Magnesium trihydrate3.00OthersMT/ MonthRoad
(7.)Fexofenadine Hydrochloride15.00OthersMT/ MonthRoad
(8.)Itraconazole10.00OthersMT/ MonthRoad
(9.)Ketrolac Tromethane2.00OthersMT/ MonthRoad
(10.)Lansoprazole10.00OthersMT/ MonthRoad
(11.)Loperamide Hydrochloride10.00OthersMT/ MonthRoad
(12.)Nebivolol HCl2.00OthersMT/ MonthRoad
(13.)Omeprazole40.00OthersMT/ MonthRoad
(14.)Omeprazole Magnesium Dihydrate2.00OthersMT/ MonthRoad
(15.)Pantoprazole Sodium Sesqui Hydrate20.00OthersMT/ MonthRoad
(16.)Quetiapine Hemifumarate2.00OthersMT/ MonthRoad
(17.)Rupatadine fumarate2.00OthersMT/ MonthRoad
(18.)1-Benzyl-4-chloropiperidine5.00OthersMT/ MonthRoad
(19.)1-Methylpiperidin-4-amine5.00OthersMT/ MonthRoad
(20.)Amitriptyline10.00OthersMT/ MonthRoad
(21.)Atrovastatin Calcium5.00OthersMT/ MonthRoad
(22.)Pimozide2.00OthersMT/ MonthRoad
(23.)Cyproheptadine HCl10.00OthersMT/ MonthRoad
(24.)Desloratadine5.00OthersMT/ MonthRoad
(25.)Nortriptyline HCl2.00OthersMT/ MonthRoad
(26.)Omeprazole Sodium2.00OthersMT/ MonthRoad
(27.)Abacavir Sulfate2.00OthersMT/ MonthRoad
(28.)Clopidogrelbisulfate5.00OthersMT/ MonthRoad
(29.)Domperidone30.00OthersMT/ MonthRoad
(30.)Ebastine5.00OthersMT/ MonthRoad
(31.)Haloperidol2.00OthersMT/ MonthRoad
(32.)Itopride Hydrochloride2.00OthersMT/ MonthRoad
(33.)Losartan Potassium15.00OthersMT/ MonthRoad
(34.)Oxatomide1.00OthersMT/ MonthRoad
(35.)Rabeprazole Sodium15.00OthersMT/ MonthRoad
(36.)Terbinafine hydrochloride15.00OthersMT/ MonthRoad
(37.)Valsartan2.00OthersMT/ MonthRoad
(38.)1-Benzy-4-piperidone5.00OthersMT/ MonthRoad
(39.)1-Benzylpiperidin-4-ol5.00OthersMT/ MonthRoad
(40.)4-Aminopiperidine5.00OthersMT/ MonthRoad
(41.)4-Hydroxy piperidine5.00OthersMT/ MonthRoad
(42.)4-Phenylpiperidine1.00OthersMT/ MonthRoad
(43.)4-piperidinopiperidine1.00OthersMT/ MonthRoad
(44.)N-tert-Butoxycarbonyl-4-hydroxy piperidine5.00OthersMT/ MonthRoad
(45.)Donepezil HCl1.00OthersMT/ MonthRoad
(46.)Pregabalin2.00OthersMT/ MonthRoad
(47.)Telmisartan2.00OthersMT/ MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 42
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.55
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.84
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.61
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8.53
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 8.53
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sodium hydroxide8.53OthersKg/ DayWithin the countryRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube15.79.215.680
(2.)NOxMicro Gram per Meter Cube23.116.623.080
(3.)OthersNH3Micro Gram per Meter Cube28.421.928.3400
(4.)PM10Micro Gram per Meter Cube70.541.570.3100
(5.)PM2.5Micro Gram per Meter Cube28.216.628.160
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l5802005002000
(2.)Chloridesmg/l374.832.482501000
(3.)pHNA8.196.426.58.5
(4.)TSSmg/l0000
(5.)Total Hardnessmg/l350112.6200600
(6.)Fluoridemg/l0.50.511.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.427.47E
(2.)DOmg/l6.85.1E
(3.)BODmg/l20.22.0E
(4.)CODmg/l724E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.345.275
(2.)Leq(Night)A-weighted decibels(dB(A))53.733.470
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.567.05
(2.)N(Nitrogen)Kilogram per hectare1.41.1
(3.)P(Phosphorus)Kilogram per hectare10.64.6
(4.)K(Potassium)Kilogram per hectare16.812.3
(5.)Electric ConductivityMillisiemens per Centimetre0.250.1603
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.82 To 12.95
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.52 To 14.96
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface525.267.8Copy of Permission LetterPipelineOthersPipelineCE/ GDS/ DWM/ OT1/ AEE1/ 61D14 Feb 2019600
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)HTDS LTDS177.36180ZLD SystemReuse within the Plant & Recycling177.360
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 177.36
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 177.36
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ash from BoilersBottom Ash6600Tons10RoadOthersWill be sent to Brick Manufacturers
(2.)MEE SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3660Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Organic Evaporative Liquid from MEE StripperHazardous Waste (as per Hazardous and Other Waste Management rules 2016)444Tons10RoadOthersWill be sent to Cement Industries
(4.)Organic waste (Process Residue)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1411.8Tons10RoadOthersWill be sent to Cement Industries
(5.)Solvent Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)642.6Tons10RoadOthersWill be sent to Cement Industries
(6.)Inorganic WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)217.5Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Spent Mixed SolventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Kilolitre10RoadAuthorized Recyclers
(8.)Used OilsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre10RoadAuthorized Recyclers
(9.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100.8Tons10RoadOthersWill be sent to Cement Industries
(10.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube28.10.750.12828.2360
(2.)PM10Microgram per Meter Cube70.30.750.18570.5100
(3.)SO2Microgram per Meter Cube15.60.852.1217.7580
(4.)NOxMicrogram per Meter Cube23.00.853.6026.6580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Coal Fired/ Fuel Briquette BoilerCoal360.6SO23.47
(2.)Coal Fired/ Fuel Briquette BoilerCoal360.6NOx7.302
(3.)Coal Fired/ Fuel Briquette BoilerCoal360.6PM100.778
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2200
(b)Source APSPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 1000 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 4.775
    Total Land (ha.) 4.775
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20158.8
(b)Waste/Barren Land (ha.) 4237.2
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3884.1
(e)Settlements (ha.) 1829.7
(f)Industrial (ha.) 609.9
(g)Forest (ha.) 1380.3
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 32100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.775
Total (ha.) 4.775
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)Wildlife CorridorsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)WLSNA0NA
(5.)ESAsNA0NA
(6.)ESZsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.775
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tallapudi Lift Canal
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.50
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.61
(b)Percentage of Total Project Area 33.72
(c)No. of Plants to be Planted 2415
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal people will get direct financial benefit by way of employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0100
(ii)Name of the EIA Consultant Rightsource Industrial Solutions Pvt. Ltd.
(iii)Address Plot No: 203, H.No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad – 500072
(iv)Mobile No. 9885560011
(v)Landline No. 0402307060
(vi)Email Id eiaemp@rightsource.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKasiviswanadha Raju
DesignationDirector
Name of Company (Applicant Name should not be given here)TAGOOR LABORATORIES PRIVATE LIMITED
AddressSurvey No. 29, Village - Tupakulagudem, Mandal - Tallapudi, District - West Godavari
Print