Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of LPG and Liquid Storage Terminal within Port area at Village Chhara-Sarkhadi
(b)Name of the Company / Organisation WEST COAST LIQUID TERMINAL PRIVATE LIMITED
(c)Registered Address SP Centre, 41/44, Minoo Desai Marg, Colaba,,Mumbai City,Maharashtra-400005
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajesh Avashia
(b)Designation (Owner/ Partner/ CEO) General Manager - Projects
(c)Address C/o WeWork Management India Pvt. Ltd., Oberoi Commerz II, 2nd Floor, 1 Mohan Gokhale Road, Colony no. 2, Aarey Colony, Goregaon (East) Mumbai,,,Mumbai City,Maharashtra-400063
(d)Pin code 400063
(e)E-mail nitin.bondre@shapoorji.com
(f)STD Code. 22(f)Telephone No. 67490406
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Category A
(c)Proposal Number IA/GJ/MIS/115006/2016
(d)Master Proposal Number(Single Window) SW/114856/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 833, 835/p1/p2, 835/p2, 836/p1/p1, 836/p1/p2, 836/
(b)Pincode 362720
(c)Bounded Latitudes (North)
From
Degree 2292224.98
Minutes
Second
From
Degree 2292694.05
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 681218.93
Minutes
Second
From
Degree 682098.99
Minutes
Second
(e)Survey of India Topo Sheet No. F42 W9, F42 W10, F42 W13, F42 W14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 8
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number F.No.10-69/2016-IA-III
(c)Date of Apply of TOR 30 Sep 2016
(d)Date of Issue of TOR / Standard ToR 24 Nov 2016
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :2.0
Near Proposed Project Site
State :Gujarat
District :Gir Somnath
Tehsil :Kodinar
Village :Chhara and Sarkhadi
400Issues raised was regarding Job opportunities, Compensation or Salary issues, CER, Land related issues, Forest related issuesDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)LPG, POL, Veg oil storage terminal with JettyTotal storage capacity of 10 MMTANot a processing unit. Transit storage terminal
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG, POL, Veg oil10OthersMillion Metric Tonne per AnnumRoad,OthersPipeline and Sea
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1426
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.3525
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 10
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Liquefied Petroleum Gas5.0OthersMillion Metric Tonne per AnnumArabian GulfOthersSea0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 14 Oct 2016 To 30 May 2017
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.78.418.7NAAQM
(2.)OthersO3Micro Gram per Meter Cube211020.2NAAQM
(3.)PM10Micro Gram per Meter Cube996399NAAQM
(4.)PM2.5Micro Gram per Meter Cube502549NAAQM
(5.)NOxMicro Gram per Meter Cube32.713.831.8NAAQM
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsIronmg/l0.790.050.31
(2.)Chloridesmg/l20731592501000
(3.)TDSmg/l43884225002000
(4.)pHOtherspH scale7.857.238.58.5
(5.)Total Hardnessmg/l1000200300600
(6.)Fluoridemg/l1.740.441.01.5
(7.)Heavy MetalsCoppermg/l0.030.030.051.5
(8.)Heavy MetalsManganesemg/l0.020.020.10.3
(9.)TSSNA0000
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l606C
(2.)BODmg/l232C
(3.)DOmg/l4.43.9C
(4.)pHOtherspH scale8.16.8D
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.953.5CPCB
(2.)Leq(Night)A-weighted decibels(dB(A))44.943.2CPCB
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare5221
(2.)K(Potassium)Othersgm/kg0.410.16
(3.)pHOtherspH scale7.916.97
(4.)Electric ConductivityOthersmicro mho per cm356127.5
(5.)N(Nitrogen)Percent0.0720.012
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGujarat Water infrastructure Limited140.510Copy of Permission LettermodeOthersRoad & PipelineOthersVia Pipeline by pumpingGWIL/F.no. 3164/Simar/water conn27 Dec 2017700
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Condensation from heating960ReuseReuse within the Plant & Recycling96
(2.)Domestic (Office/Workshop)1010STPOthersUsed for landscaping9.50.5
(3.)Cleaning & washing activities (Tank farm & floor)810ETPOthersreused for landscaping or Incineration facility7.50.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 114
(b)Total Discharged Water (Kilolitre per Day) 1
(c)Total Reused Water (Kilolitre per Day) 113
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Scrap materialIndustrial Waste10Tons10RoadAuthorized Recyclers
(2.)Municipal Solid Waste: DomesticMunicipal Solid Waste6Tons10RoadOthersSolid Waste Management Rules, 2016
(3.)Construction and demolition wasteConstruction & Demolition Waste100Tons10RoadOthersAs per C&D Waste Rules, 2016
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0000.1NAAQM
(2.)SO2Microgram per Meter Cube0000.1NAAQM
(3.)NOxMicrogram per Meter Cube16.300.417.0NAAQM
(4.)PM10Microgram per Meter Cube6300.4763.5NAAQM
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2 nos of D G set 1000 KVA eachDiesel300.4PM100.014
(2.)2 nos of D G set 1000 KVA eachDiesel300.4SO20.014
(3.)2 nos of D G set 1000 KVA eachDiesel300.4NOx0.135
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 66
(b)Source Paschim Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 nos of D G Set 1000 KVA each
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 39.48
    Total Land (ha.) 39.48
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11087.6
(b)Waste/Barren Land (ha.) 935.8
(c)Grazing/ Community Land (ha.) 1458.4
(d)Surface Water Bodies (ha.) 1062
(e)Settlements (ha.) 584.2
(f)Industrial (ha.) 68.9
(g)Forest (ha.) 611.6
(h)Mangroves (ha.) 11.6
(i)Marine Area (ha.) 15414.2
(j)Others (ha.) : Area of Jetty, Salt Pan, Mining, Tank 181.5
    Total (ha.) 31415.800000000003
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlant39.48
Total (ha.) 39.48
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNot applicable0Not Applicable
(2.)ESAsNot applicable0Not Applicable
(3.)WLSNot applicable0Not Applicable
(4.)Critically Polluted AreaNot applicable0Not Applicable
(5.)NPANot applicable0Not Applicable
(6.)CorridorsNot applicable0Not Applicable
(7.)Wildlife CorridorsNot applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot present0-
(2.)ForestChhara, Sarkhadi, Nanavada0.05All Reserve Forest
(3.)Defence InstallationsNot present0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 28.32
(b)Land yet to be acquired(Ha) 10.52
(c)Status of Land acquisition if not acquired Acquisition under progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Asiatic Lion, Whale Shark
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Yes
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. WLP/32/A/1501-1504/2016-17
(iii)Date of issue 02 Dec 2016
(iv)Recommendation -
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 3 Ponds, 2 River, 2 Creek
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 2000
(d)Temporary Employment- During Operation 1000
(e)No. of working days 350
(f)Total Manpower 3070
32.
Green Belt in Ha:
(a)Total Area of Green Belt 6.7
(b)Percentage of Total Project Area 16.97
(c)No. of Plants to be Planted 17040
(d)Funds Allocated for Plantation 3348240
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalCSR & CER
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification III
(b)Location Type Low and Medium Eroding Coast
(c)Details of Mangroves Land Involved, if Any -
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies After the implementation of the mitigation measure
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 14 Oct 2016
(iv)Period of Study To (EIA Terrestrial) 23 May 2017
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies After the implementation of the mitigation measure
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 14 Oct 2016
(iv)Period of Study to (EIA Marine) 23 May 2017
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Yes
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing, Anna University, Chen
(ii)Please Specify with salient features Setting up of a proposed LPG/POL/Veg oil (edible &
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity III
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 16.9
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 68.7
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed Verbal query from Technical Committee of GCZMA has
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) Provided in Terrestrial EIA Report
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 11
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 29
(d)Total plot area (sqm) 394852
(e)Total built up area (sqm) 9155
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo propane, butane, LPG, POL and veg oil products
(d)Quantity of Cargo 38
(e)Control Measures of Cargo Safety, Air pollution, Spill control
(f)Dust Control Measures Water sprinkling, well maintained road and traffic
(g)Quantum 542700
(h)Quantity of Dredging (Cubic meter per day) 0
(i)Type of Dredging Maintenance
(j)Disposal of Dredge Material Not applicable as dredging is not involved
(k)Details of Outfall Diffusers Not applicable
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall 0
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 7900
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Parking will be provided within the premises of pr
5.
Energy Saving Measures:
(a)Source/Mode shall be identified after energy audit
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact as drainage pattern of the study area wi
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0138
(ii)Name of the EIA Consultant Kadam Environmental Consultant
(iii)Address 871/B/3, Makarpura GIDC, Vadodara
(iv)Mobile No. 9714861611
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 26 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per your online application, substantive changes has been made with regard to the Terms of Reference granted to the project vide dated 24th November, 2016. However, no amendment in ToR was taken for the proposed changes. As per the ToR condition, recommendation of State CZMA is also not submitted. Kindly apply for amendment in ToR and get the ToR amended first and withdraw this proposal from the portal. 12 Sep 2019
2.NAThe correction have been made as per the instruction received 30 Nov 2019
3.NAKindly submit revised and updated EIA/EMP report giving details of Terms of Reference and further Amendment in ToR (dated 17th December, 2019) and its compliance incorporating details of public hearing, issues raised and commitment made by the project proponent, CER Plan and recommendation of Gujarat CZMA. 14 Feb 2020
4.NAThe correction have been made as per the instruction received 17 Feb 2020
5.NAEssential Details were sought for the project on 14.02.2020 with the following caption “Kindly submit revised and updated EIA/EMP report giving details of Terms of Reference and further Amendment in ToR (dated 17th December, 2019) and its compliance incorporating details of public hearing, issues raised and commitment made by the project proponent, CER Plan and recommendation of Gujarat CZMA”. The query was closed on 17.02.2020 by justifying the old EIA/EMP Report. The EIA Report uploaded in haphazard manner (in parts) containing page no. 1-36, 242-275, 355-385 and 386-460 and 1-164 (Marine EIA). However, page no. 37-241 and 276-354 which are parts of EIA report are missing. Kindly upload complete EIA Report on the portal covering all the details and Annexures. 06 Mar 2020
6.NAThe correction have been made as per the instruction received 11 Mar 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 25 Jun 2020
2.NA

Kindly see minutes of 51st meeting of EAC (Infra-2).

31 May 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajesh Avashia
DesignationGeneral Manager - Projects
Name of Company (Applicant Name should not be given here)WEST COAST LIQUID TERMINAL PRIVATE LIMITED
AddressSP Centre, 41/44, Minoo Desai Marg, Colaba