Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of the grain based distillery unit from 125 KLPD to 200 KLPD and expansion of cogeneration power plant from 3 MW to 9 MW at A-2(P), A-3 and A-4, Industrial Growth Center, Village Ranipur, De
(b)Name of the Company / Organisation PIONEER INDUSTRIES LTD.
(c)Registered Address Pioneer Industries Ltd., Plot No. A2, A3, A4, Industrial Growth Center, Pathankot, Punjab,,Pathankot,Punjab-145024
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kamleshwar Bhatt
(b)Designation (Owner/ Partner/ CEO) COO
(c)Address Pioneer Industries Ltd, A2, A3, A4, Industrial Growth Center, Defence Road, Pathankot,,Pathankot,Pathankot,Punjab-145024
(d)Pin code 145024
(e)E-mail coo@pioneerindustries.org
(f)STD Code. 1870(f)Telephone No. 253024
(g)Fax No. 01870253004
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity5(g) Distilleries
(b)Category A
(c)Proposal Number IA/PB/IND2/114817/2016
(d)Master Proposal Number(Single Window) SW/114812/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A2, A3, A4, Industrial Growth Center, Pathankot
(b)Pincode 145024
(c)Bounded Latitudes (North)
From
Degree 32.20.18.32
Minutes
Second
From
Degree 32.20.19.28
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.38.16.5
Minutes
Second
From
Degree 75.38.22.45
Minutes
Second
(e)Survey of India Topo Sheet No. 43P/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 360
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.9
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/127/2016-IA II (I)
(b)Date of Apply of TOR 15 Apr 2016
(c)Date of Issue of TOR / Standard ToR 02 Aug 2016
(d)Date of Apply of EC 10 Jul 2010
(e)Date of Issue of EC 07 Dec 2012
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :0
within industry
State :Punjab
District :Pathankot
Tehsil :Pathankot
Village :Ranipur
151Issues were raised about employment and control of pollutionOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 5-65/2005-RO(NZ)/143
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 29 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ENA/Anhydrous Alcohol/RS etc.12575200Kilo Litre per Day(KLD)Road
(2.)Cogeneration of Power369Mega Watt(MW)OthersElectric Transmission Lines
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Grain based distillation plant125 KLPD75 KLPD200 KLPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Apr 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. CTOW/Renewal/GRP/2017/5296658
(vi)Application No. 5296658
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 52.00
(b) Funds Allocated for Environment Management (Capital) (in Crores) 6.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.75
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 185
(b)Existing quantity of raw material/fuel 315
(c)Total quantity of raw material/fuel 500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Boiler Fuel Biomass (Rice Husk)175000Tons per AnnumOpen MarketRoad250 Open MarketCopy of Linkage
(2.)Grains – Maize, jowar, broken rice175000Tons per AnnumOpen MarketRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube714071100
(2.)PM2.5Micro Gram per Meter Cube37183760
(3.)SO2Micro Gram per Meter Cube10.25.41080
(4.)NOxMicro Gram per Meter Cube23.411.72380
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3543165002000
(2.)Fluoridemg/l0.200.1411.5
(3.)Heavy MetalsSeleniummg/l000.050.05
(4.)TSSmg/l0000
(5.)pHNA7.57.348.58.5
(6.)Total Hardnessmg/l11491300600
(7.)Chloridesmg/l57.245.42501000
(8.)Heavy MetalsChromiummg/l000.050.05
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00C
(2.)DOmg/l8.77.9C
(3.)CODmg/l8.56.0C
(4.)pHmg/l7.577.42C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))69.246.465
(2.)Leq(Night)A-weighted decibels(dB(A))52.538.655
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMilliequivalents per 100 Gram25.921.2
(2.)N(Nitrogen)Milligram per Kilogram5.63.2
(3.)pH8.257.96
(4.)K(Potassium)Milligram per Kilogram4.72.9
(5.)P(Phosphorus)Kilogram per hectare2.52.0
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.93 To 2.39
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.7 To 16.76
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater19660Copy of Permission LetterPipelineTube Well21-4(367)NWR/CGWA/2011-408209 Jul 20121490
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Condensates from MEE and Spent Lees4251000Biological TreatmentReuse within the Plant & Recycling425
(2.)Effluent from other misc. processes155500Biological TreatmentGreen Belt Renewal Plant155
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 580
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 580
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ash from BiomassBottom Ash24500Tons5RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.24.13.513.880
(2.)PM10Microgram per Meter Cube714.1880100
(3.)NOxMicrogram per Meter Cube23.44.14.327.880
(4.)PM2.5Microgram per Meter Cube374.184660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stack sttached to boiler furnaceBiomass551PM1047
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6000
(b)Source Own Cogeneration Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3200
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 18.09
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 18.09
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 18.09
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 18.09
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt6.5
(2.)OthersArea for cereal based products unit1
(3.)Area for Solid Waste Management0.5
(4.)Main Plant3.1
(5.)Built Up Area3
(6.)Water Reservoir1
Total (ha.) 15.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)ESZsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)ESAsNA0NA
(5.)Critically Polluted AreaNA0NA
(6.)WLSNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsMamoon Cantonment2Cantonment Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 18.09
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River Ravi
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 50
(e)No. of working days 350
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt65000065000
(2.)Percentage of Total Project Area35.91035.91
(3.)No. of Plants75000075000
(4.)Funds Allocated500000300000800000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe industry is producing anhydrous alcohol for the blending in gasoline, thereby helping the country in meeting the energy requirements.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA 0018
(ii)Name of the EIA Consultant Enviro Infra Solutions Pvt. Ltd.
(iii)Address 301, 302, 305, SRBC, Plot No. INS 12, Sector - 9, Vasundhara, Ghaziabad
(iv)Mobile No. 9814087586
(v)Landline No. 0120415118
(vi)Email Id jain_yp@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKamleshwar Bhatt
DesignationCOO
Name of Company (Applicant Name should not be given here)PIONEER INDUSTRIES LTD.
AddressPioneer Industries Ltd., Plot No. A2, A3, A4, Industrial Growth Center, Pathankot, Punjab
Print