1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Manuguru opencast coal mining project | (b)Name of the Company / Organisation | The Singareni Collieries Company Limited | (c)Registered Address | M/s. Singareni Collieries Company Limited
PO: Kothagudem Collieries - 507 101
Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shri G Venkateswara Reddy | (b)Designation (Owner/ Partner/ CEO) | Director (Planning & Projects) | (c)Address | Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101 | (d)Pin code | 507101 | (e)E-mail | gm_env@scclmines.com | (f)STD Code. | 8744(f)Telephone No. | 243059 | (g)Fax No. | 08744244115 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TG/CMIN/114765/2019 | (d)Master Proposal Number(Single Window) | SW/114745/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Govt. Land: Manuguru (V) – Sy.No. 12,341,404,423,8 | (b)Pincode | 504231 | (c)Bounded Latitudes (North) | | From | | Degree | 175748 | Minutes | | Second | | From | | Degree | 175919 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 804858 | Minutes | | Second | | From | | Degree | 805111 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 65 C/13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 781.00 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 60 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Bhadradri Kothagudem | Manuguru | Rajupeta | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/770/A.P | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 17 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 668.42 ha | 1.5 | 0.6 | 2.1 | Others | Million Tonnes | Road,Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | coal mining with Shovel and dumper | 1.5 MTPA in 668.4 ha with shovel and dumper | 2.1 MTPA in 668.4 ha with shovel and dumper | 2.1 MTPA in 668.4 ha with shovel and dumper | 40 % capacity expansion | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Mar 2017 | (iv)Valid Upto | 31 Oct 2021 | (v)File No. | 17052553274 | (vi)Application No. | 17052553274 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 415.70 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 8.20 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.1177 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 6499.67 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 6499.67 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Explosives | 6499.67 | Tons per Annum | | Purchasing from the explosive companies | Road | | 210 | MoU | | Copy of Linkage | (2.) | Power | 0.803 | Others | MVA | 132 KV substation of Manuguru | Others | Over head Transmission | 4 | Fuel Supply Agreement | | Copy of Linkage | (3.) | Diesel | 9191.19 | Kilo Litre per Day | | Company established oil bunks at site | Road | | 210 | MoU | | Copy of Linkage | (4.) | Water | 1680 | Kilo Litre per Day | | MIne discharge | Others | Pipe line | .1 | Others | Mine discharge | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 19.3 To 3 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.66 To 17.58 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1680 | 0 | Copy of Permission Letter | Pipeline | | Others | Ground water during mining | 14536/Hg.II(1)/07 | 04 Jun 2008 | 4390 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine discharge | 2929 | 2929 | Settling ponds / Slow sand filters | Others | Nearby streams / agricultural fields | 1680 | 1249 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2929 | (b)Total Discharged Water (Kilolitre per Day) | 1249 | (c)Total Reused Water (Kilolitre per Day) | 1680 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | TOp soil | Others | Top soil | 777857 | Tons | .1 | Others | Dumpers and trucks | Others | Spreading on OB dumps | (2.) | Hard Over burden | Others | OB | 46680000 | Tons | .1 | Others | Trucks & dumpers | Others | Stored as dumps | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 20.7 | 0 | 0.364 | 21.1 | 120 | (2.) | SO2 | | Microgram per Meter Cube | 14.2 | 0 | 0.02 | 14.22 | 120 | (3.) | PM10 | | Microgram per Meter Cube | 203 | 0 | 8.09 | 211.10 | 250 | (4.) | PM2.5 | | Microgram per Meter Cube | 60.2 | 0 | 4.05 | 64.26 | Not Specified | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 803 | (b)Source | 132 KV Manuguru substation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Second source electricity available | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 34.95 | (b)Private Land (ha.) | 331.36 | (c)Government Land (ha.) | 302.11 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 668.42 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 594.58 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 8.62 | (e)Settlements (ha.) | 27.94 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 34.95 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Roads | 2.33 | Total (ha.) | 668.4200000000002 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | OB Dump Area | | 244.56 | | (2.) | Safety Zone | | 100.32 | | (3.) | Built Up Area | | 34.05 | | (4.) | Quarry Area | | 208.92 | | (5.) | Green belt | | 34.71 | | (6.) | Others | Embankment | 45.86 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 0 | NA | (2.) | WLS | Nil | 0 | NA | (3.) | ESZs | Kinnerasani wild life sanctuary | 5.67 | Nil | (4.) | Critically Polluted Area | NA | 0 | na | (5.) | NPA | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Forest | | Reserve forest | 0 | 34.95 ha of Forest land is involved in the project, Forest Clearances obtained 1. Surface rights for 33.58 ha vide F.No.8-73/2005-FC dt.09.05.2016, 2. Surface rights for 1.37 ha (part of 1312 ha). | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 668.42 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 4 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 1124 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 3280 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 6 Nos. of seasonal tanks are present within the area. The elevation varies from 759.83 m to 781.00 m with an average elevation of 766.65m. | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | This area is drained by perennial Godavari River and its ephemeral tributaries like Gorripeta vagu and Kodipunjula vagu. The streams are sub-parallel flowing towards northeast and east to join the Godavari River which is on the North east side of the block (HFL-765.47m). The overall drainage density is about 1.83 km/Sq.km. In the block the drainage density is very low, because of sandy soil cover | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | .183 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 220 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 188 | (e)No. of working days | 365 | (f)Total Manpower | 408 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 16.81 | 413.02 | 429.83 | (2.) | Percentage of Total Project Area | 3.910 | 96.0891 | 99.9991 | (3.) | No. of Plants | 42025 | 1032550 | 1074575 | (4.) | Funds Allocated | 234650.908 | 5765349.1 | 6000000.007999999 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | In the project area of 668.42 ha an amount of 429.83 ha will be reclaimed in stage wise by the end of the project. | (2.) | Social | The social infrastructure in terms of connectivity by road, communication, health, sanitation, community centers, education, financial institution will be improved.. | (3.) | Financial | New jobs will be created and there will be a boost up in the local business in the area which will improve the financial status of the nearby habitants. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 2.1 MT | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | PCA-38011/12/2017-PCA | (b)Date of Approval | 22 Apr 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 668.42 | (f)Approved Capacity | 2.1 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 19.96 | (b)Mineable Reserves (Million Ton) | 16.66 | (c)Extractable Reserves(Million Ton) | 13.69 | (d)Percent(%) of Extraction | 68.58 | (e)Grade of Coal /Ore /Mineral | G-9 to G-12 | (f)Stripping Ratio | 1 : 13.92 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Degree -1 | (h)Average Gradient(Degree) | 1 in 3.3 to 5.5 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 7 ( from 2018-19) | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 8 | (c)Thickness of seams to be worked on | 0.17 | (d)Maximum Thickness of Seams (metres) | 5.89 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 668.42 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Already Lease obtained for entire project area of | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 2180 | (iii)Validity of the lease deed | From : 23 Jul 1974 To : 23 Jul 2005 | (iv)Date of Execution of Mining Lese | 12 Aug 1974 | (v)Reference Number | G.O.Ms No.810, Ind & Com(M-III) Dept | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Initial | 01 Jan 1900 | From : 06 Feb 2015 To : 15 Apr 2035 | Copy of Earlier Lease | G.O.Ms No. 6 | 373.90 | NIl | (2.) | Renewal | 12 Aug 2008 | From : 23 Jul 2005 To : 23 Jul 2035 | Copy of Earlier Lease | G.O.Ms No. 217 | 294.52 | Nil | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 3.63 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 2.73 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0.9 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 158.96 (hectare) at a Depth of 200 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 208.92 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumpers | (b)Surface to Siding/Loading | Trucks and conveyor | (c)Transportation / Conveyor Details | By Road and conveyor to Kondapur CHP from CHP thro | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 34.95 | 0 | 34.95 | (2.) | SETTLEMENTS | | 27.94 | 0 | 27.94 | (3.) | OTHERS(Specify) | Roads | 2.33 | 0 | 2.33 | (4.) | SURFACE WATER BODIES | | 8.62 | 0 | 8.62 | (5.) | WASTE LAND | | 0 | 0 | 0 | (6.) | GRAZING LAND | | 0 | 0 | 0 | (7.) | AGRICULTURE LAND | | 594.58 | 0 | 594.58 | |
TOTAL | 668.42 | 0 | 668.42 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | VIRGIN AREA | | 44.03 | 0 | 1.83 | | 45.86 | (2.) | INTERNAL OB DUMPS | | 49.96 | 0 | 0 | | 49.96 | (3.) | EXCAVATION/QUARRY | | 0 | 134.98 | 23.98 | | 158.96 | (4.) | ROADS | | 0 | 0 | 0 | | 0 | (5.) | EXTERNAL OB DUMPS | | 244.56 | 0 | 0 | | 244.56 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 34.05 | | 34.05 | (7.) | Other | safety zone | 49.72 | 23.96 | 26.64 | | 100.32 | (8.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (9.) | GREEN BELT | | 34.71 | 0 | 0 | | 34.71 | |
TOTAL | 422.98 | 158.94 | 86.5 | 0 | 668.42 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 244.56 | (b)Internal Dump(in hectare) | 49.56 | (c)Quarry(in hectare) | 208.92 | (d)Safety Zone(in hectare) | 100.32 | (e)Final Void of 158.96 (hectare) at a Depth of 200 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 135.31 | (h)Total afforestation plant (in hectare) | 429.83 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2017 | 1.5 | 1.5 | 1.5 | 0.45 | 0 | (2.) | 2018 | 1.5 | 1.5 | 1.5 | 1.5 | 0 | (3.) | 2019 | 1.5 | 1.5 | 1.5 | 1.5 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/19/0981 | (ii)Name of the EIA Consultant | EPTRI | (iii)Address | 91/4 Gachibowli, Hyderabad | (iv)Mobile No. | 9885236493 | (v)Landline No. | 0406756750 | (vi)Email Id | dgeptri@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 15 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. The status of the forestland submitted in the Form-2 and Certificate of compliance submitted by the regional office is contrary to each other. You are requested to provide exact status of forest clearance involved in the project along with copy of clearance
2. Action taken report on the non-compliance reported by the regional officer, Chennai vide letter dated 14th August, 2019
3. The details under final void and OB management shall be filled properly in the Form-II
4. Whether the project falls in the ESZ of the Kinnersani Wildlife Sanctuary?. Plan showing the boundary of Kinnersani Wildlife sanctuary, ESZ and project boundary along with the distances | 18 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 29 Sep 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shri G Venkateswara Reddy | Designation | Director (Planning & Projects) | Name of Company (Applicant Name should not be given here) | The Singareni Collieries Company Limited | Address | Kothagudem P.O -507101
Khammam Dt |
|