Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) NILKANTH CONCAST PRIVATE LIMITED
(b)Name of the Company / Organisation NILKANTH CONCAST PRIVATE LIMITED
(c)Registered Address Survey No.221,Vil.Vadala, Taluka.Mundra, Dist.Kutch,,kutch,Gujarat-370410
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mr.Suresh S Sarbaliya
(b)Designation (Owner/ Partner/ CEO) General Manager - P & A
(c)Address BBZ-N-66,Zanda Chowk, Gandhidham-Kutch -370201,,Gandhidham,kutch,Gujarat-370201
(d)Pin code 370201
(e)E-mail ncpl.hr2012@gmail.com
(f)STD Code. 2836(f)Telephone No. 221460
(g)Fax No. 233734
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND/114302/2008
(d)Master Proposal Number(Single Window) SW/114292/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 221
(b)Pincode 370410
(c)Bounded Latitudes (North)
From
Degree 22.542706
Minutes
Second
From
Degree 22.542925
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 69.521380
Minutes
Second
From
Degree 69.523661
Minutes
Second
(e)Survey of India Topo Sheet No. F42, J13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 15
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/85/2008-IA.II(I)
(c)Date of Issue of TOR 14 Sep 2015
(f)Previous TOR Letter NA
(b)Date of Apply of EC 12 Sep 2019
(c)Date of Issue of EC 16 Nov 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Nov 2016
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Dec 2016
Distance of Public Hearing Venue from the Proposed Project :0.10
Survey No. 221, Village: Vadala, Taluka: Mundra, District: Kutch
State :Gujarat
District :kutch
Tehsil :Mundra
Village :Vadala
70Only one pollution related issues: • When Industrial unit comes, issue of pollution comes first. Company is having coal based power plant hence pollution will occur, but benefits for nearby villageOthersResident Additional Collector and Additional District Magistrate, Bhuj-Kutch.
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-54/2009(ENV)/383
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 23 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)WHRB4610Mega Watt(MW)OthersTransmission grid
(2.)Sponge Iron/ Sponge iron pellate7200072000144000Tons per Annum(TPA)Road
(3.)Mild Steel180000180000360000Tons per Annum(TPA)Road
(4.)Captive Power Plant246Mega Watt(MW)OthersTransmission grid
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Furnace224None
(2.)WHRB4610None
(3.)Kiln (100 MT/day)224None
(4.)Captive Power Plant246None
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Feb 2015
(iv)Valid Upto 08 Dec 2019
(v)File No. AWH-68553
(vi)Application No. 87961
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 60
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.675
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.84
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 587880
(b)Existing quantity of raw material/fuel 611280
(c)Total quantity of raw material/fuel 1199160
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal199800Tons per AnnumIndonesia/AfricaRoad,OthersSea35 Open MarketCopy of Linkage
(2.)Coal Char10080Tons per AnnumimportedRoad,OthersSea35 Open MarketCopy of Linkage
(3.)Iron ore pellets204480Tons per AnnumLocal (Jindal Limited Rajasthan)Road625 Open MarketCopy of Linkage
(4.)Billets360000Tons per AnnumCaptive Manufacturing PlantConveyor Belt0.05 CaptiveCopy of Linkage
(5.)Scrap154860Tons per AnnumIndonesia/Africa/New Zealand/AustraliaRoad,OthersSea35 Open MarketCopy of Linkage
(6.)Sponge Iron144000Tons per AnnuminhouseConveyor Belt0.5 CaptiveCopy of Linkage
(7.)Dolomite4320Tons per AnnumShreeji Dolomite Industries, AhmedabadRoad275 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jun 2019 To 30 Jun 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube281327.980
(2.)NOxMicro Gram per Meter Cube251124.980
(3.)PM10Micro Gram per Meter Cube905989.7100
(4.)PM2.5Micro Gram per Meter Cube422241.960
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.047.586.58.5
(2.)Chloridesmg/l570962501000
(3.)TSSmg/l0000
(4.)TDSmg/l870.52755002000
(5.)Total Hardnessmg/l9850300600
(6.)Fluoridemg/l1.50.611.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.987.89A
(2.)DOmg/l3.633.5D
(3.)BODmg/l30A
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))57.3051.3075
(2.)Leq(Night)A-weighted decibels(dB(A))50.2040.4755
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre5.70.608
(2.)K(Potassium)Milligram per Kilogram2511
(3.)pH8.758.07
(4.)N(Nitrogen)Milligram per Kilogram387.6298.6
(5.)P(Phosphorus)Milligram per Kilogram12.839.87
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 37.64
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.71 To 27.43
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface145015Copy of Permission LetterPipelineOthersGWILCS/Renewal/2015-16/2308/182808 Sep 20161500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic3650Packaged Type STPGreen Belt Renewal Plant36
(2.)Boiler51200Primary TreatmentReuse within the Plant & Recycling51
(3.)Cooling tower and Blowdown170200Primary TreatmentReuse within the Plant & Recycling170
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 257
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 257
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dust From ESP & Bag filterIndustrial Waste14400Tons25RoadOthersShall be used in Brick Manufacturing.
(2.)Mill ScaleIndustrial Waste1260Tons0.5Conveyor BeltOthersReutilized in Induction Furnace
(3.)Metal ScrapIndustrial Waste18000Tons0.5Conveyor BeltOthersReutilized in Induction Furnace
(4.)coal Char/DolcharIndustrial Waste10080Tons0.5Conveyor BeltOthersShall be used in CPP (AFBC)
(5.)SlagIndustrial Waste26460Tons150RoadOthersShall be used in road embankment
(6.)AshIndustrial Waste4914Tons01RoadOthersCaptive Brick Manufacturing Plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube83.41.00.6984.091100
(2.)SO2Microgram per Meter Cube21.10.91.7222.82180
(3.)PM2.5Microgram per Meter Cube0000000.0160
(4.)NOxMicrogram per Meter Cube0000000.0180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Rotary Kiln 1Coal301.0PM1029.56
(2.)Rotary Kiln 1Coal301.0SO28.82
(3.)Rotary Kiln 2Coal301.0PM1029.56
(4.)Rotary Kiln 2Coal301.0NOx7.51
(5.)AFBC BoilerMixture of Coal, legnite & Char531.5SO213.2
(6.)WHRB 1 & 2Steam301.0PM1035.93
(7.)Induction Furnace 1 & 2Electricity301.5PM1017.98
(8.)Iron Ore Crusher-120.3PM1016.57
(9.)Product Separation/ Storgage House--220.8PM1017.24
(10.)Rotary Kiln 3 (Proposed)Coal301.0SO28.82
(11.)Rotary Kiln 4 (Proposed)Coal301.0NOx7.51
(12.)AFBC Boiler (Proposed)Mixture of Coal, Legnite & Char531.5SO213.2
(13.)AFBC Boiler (Proposed)Mixture of Coal, Legnite & Char531.5NOx10.56
(14.)WHRB 3 & 4Steam301.0PM1035.96
(15.)Product Separation/ Storage House-220.8PM1017.24
(16.)Rotary Kiln 4 (proposed)Coal301.0PM1029.56
(17.)Rotary Kiln 1Coal301.0NOx7.51
(18.)Rotary Kiln 4 (Propopsed)Coal301.0SO28.82
(19.)Cooler Discharge Building-60.48PM1021.0
(20.)Intermigiate Bins-120.3PM1015.24
(21.)Rotary Kiln 3 (Proposed)Coal301.0NOx7.51
(22.)Rotary Kiln 2Coal301.0SO28.82
(23.)AFBC BoilerMixture of Coal, legnite & Char531.5PM1026.96
(24.)AFBC BoilerMixture of Coal, legnite & Char531.5NOx10.56
(25.)Coal Crusher/ Screen House-180.8PM1013.98
(26.)Cooler Discharge Building--60.48PM1021.0
(27.)Rotary Kiln 3 (proposed)Coal301.0PM1029.56
(28.)AFBC Boiler (Proposed)Mixture of Coal, Legnite & Char531.5PM1026.96
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60310
(b)Source GETCO and Own CPP
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 500 KVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 35.3798
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 35.3798
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 35.38
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Land 00
    Total (ha.) 35.38
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant15.59023None
(2.)Green belt11.7334None
(3.)OthersOpen Area & Amenity8.056165None
Total (ha.) 35.379795
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA00NA
(2.)Critically Polluted AreaNA00NA
(3.)NPANA00NA
(4.)ESZsNA00NA
(5.)Wildlife CorridorsNA00NA
(6.)WLSNA00NA
(7.)ESAsNA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00NA
(2.)Defence InstallationsNA00NA
(3.)ForestNA00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 35.3798
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gulf of Kutch
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 3.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 520
(c)Temporary Employment- During Construction 00
(d)Temporary Employment- During Operation 381
(e)No. of working days 300
(f)Total Manpower 901
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area33.160033.16
(2.)Total Area of Green Belt11.73340011.7334
(3.)No. of Plants13800100014800
(4.)Funds Allocated2000000030000020300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalMS scrap will be reused Greenbelt Development
(2.)Social• The proposed expansion project will provide quality product at lower cost to the users. • There should be positive impact on the socio-economic condition of the area in terms of direct and indirect employment due to the proposed project. • Numbers of local trained persons are likely to find jobs. • Country will save valuable foreign exchange as import of these products will reduce by corresponding amount. • These products also have export potential. Hence, possibility of earning foreign exchan
(3.)FinancialRevenue generation in form of GST, IT and Other Taxes for State and Central Government.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0101
(ii)Name of the EIA Consultant Pollution and Ecology Control Services
(iii)Address Near Dhantoli Police Station, Dhantoli Nagpur-440012
(iv)Mobile No. 9373128182
(v)Landline No. 0712229322
(vi)Email Id pecs_nagpur@rediffmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of reply of the representation made at MOEF & CC along with ADS for the proposed expansion of 72,000 TPA Sponge Iron to 1,,44,000 TPA by Installation of additional Two no. Kilns of 100 TPD each, Mild Steel from 1,80,000 TPA to 3,60,000 TPA by installation of additional two nos. of Induction furnaces 20T capacity each, Rolling & section mill, Captive power plant from 4MW to 6MW and Waste Heat Recovery Power Plant IWHRB) from 6MW to 1OMW by M/s Nilkanth Concast Private Limited at Vadala Village, Mundra Taluka, Kutch District, Gujarat 02 Oct 2021
2.NA

the Committee recommended that Ministry may forward a copy of the public representation to proponent to provide their comments and clarifications along with their ADS reply. Accordingly, the proposal to be returned in present form.

11 Jul 2021
3. ADS Reply LetterSubmission of Additional Details Sought (ADS) by MOEF&CC for the proposed expansion of 72,000 TPA Sponge Iron to 1,,44,000 TPA by Installation of additional Two no. Kilns of 100 TPD each, Mild Steel from 1,80,000 TPA to 3,60,000 TPA by installation of additional two nos. of Induction furnaces 20T capacity each, Rolling & section mill, Captive power plant from 4MW to 6MW and Waste Heat Recovery Power Plant IWHRB) from 6MW to 1OMW by M/s Nilkanth Concast Private Limited at Vadala Village, Mundra Taluka, Kutch District, Gujarat 12 Jun 2021
4.NA

Proposal deferred for want of additional information.

06 Nov 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMr.Suresh S Sarbaliya
DesignationGeneral Manager - P & A
Name of Company (Applicant Name should not be given here)NILKANTH CONCAST PRIVATE LIMITED
AddressSurvey No.221,Vil.Vadala, Taluka.Mundra, Dist.Kutch