1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | NILKANTH CONCAST PRIVATE LIMITED | (b)Name of the Company / Organisation | NILKANTH CONCAST PRIVATE LIMITED | (c)Registered Address | Survey No.221,Vil.Vadala,
Taluka.Mundra, Dist.Kutch,,kutch,Gujarat-370410 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mr.Suresh S Sarbaliya | (b)Designation (Owner/ Partner/ CEO) | General Manager - P & A | (c)Address | BBZ-N-66,Zanda Chowk,
Gandhidham-Kutch -370201,,Gandhidham,kutch,Gujarat-370201 | (d)Pin code | 370201 | (e)E-mail | ncpl.hr2012@gmail.com | (f)STD Code. | 2836(f)Telephone No. | 221460 | (g)Fax No. | 233734 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND/114302/2008 | (d)Master Proposal Number(Single Window) | SW/114292/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 221 | (b)Pincode | 370410 | (c)Bounded Latitudes (North) | | From | | Degree | 22.542706 | Minutes | | Second | | From | | Degree | 22.542925 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 69.521380 | Minutes | | Second | | From | | Degree | 69.523661 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42, J13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 15 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/85/2008-IA.II(I) | (c)Date of Issue of TOR | 14 Sep 2015 | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 12 Sep 2019 | (c)Date of Issue of EC | 16 Nov 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 20 Dec 2016 | Distance of Public Hearing Venue from the Proposed Project : | 0.10 |
| Survey No. 221, Village: Vadala, Taluka: Mundra, District: Kutch | State : | Gujarat | District : | kutch | Tehsil : | Mundra | Village : | Vadala |
| 70 | Only one pollution related issues: • When Industrial unit comes, issue of pollution comes first. Company is having coal based power plant hence pollution will occur, but benefits for nearby village | Others | Resident Additional Collector and Additional District Magistrate, Bhuj-Kutch. | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-54/2009(ENV)/383 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 23 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | WHRB | 4 | 6 | 10 | Mega Watt(MW) | | Others | Transmission grid | (2.) | Sponge Iron/ Sponge iron pellate | 72000 | 72000 | 144000 | Tons per Annum(TPA) | | Road | | (3.) | Mild Steel | 180000 | 180000 | 360000 | Tons per Annum(TPA) | | Road | | (4.) | Captive Power Plant | 2 | 4 | 6 | Mega Watt(MW) | | Others | Transmission grid | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Furnace | 2 | 2 | 4 | None | (2.) | WHRB | 4 | 6 | 10 | None | (3.) | Kiln (100 MT/day) | 2 | 2 | 4 | None | (4.) | Captive Power Plant | 2 | 4 | 6 | None | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Feb 2015 | (iv)Valid Upto | 08 Dec 2019 | (v)File No. | AWH-68553 | (vi)Application No. | 87961 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 60 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.675 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.84 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 587880 | (b)Existing quantity of raw material/fuel | 611280 | (c)Total quantity of raw material/fuel | 1199160 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 199800 | Tons per Annum | | Indonesia/Africa | Road,Others | Sea | 35 | Open Market | | Copy of Linkage | (2.) | Coal Char | 10080 | Tons per Annum | | imported | Road,Others | Sea | 35 | Open Market | | Copy of Linkage | (3.) | Iron ore pellets | 204480 | Tons per Annum | | Local (Jindal Limited Rajasthan) | Road | | 625 | Open Market | | Copy of Linkage | (4.) | Billets | 360000 | Tons per Annum | | Captive Manufacturing Plant | Conveyor Belt | | 0.05 | Captive | | Copy of Linkage | (5.) | Scrap | 154860 | Tons per Annum | | Indonesia/Africa/New Zealand/Australia | Road,Others | Sea | 35 | Open Market | | Copy of Linkage | (6.) | Sponge Iron | 144000 | Tons per Annum | | inhouse | Conveyor Belt | | 0.5 | Captive | | Copy of Linkage | (7.) | Dolomite | 4320 | Tons per Annum | | Shreeji Dolomite Industries, Ahmedabad | Road | | 275 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jun 2019 To 30 Jun 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 28 | 13 | 27.9 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 25 | 11 | 24.9 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 90 | 59 | 89.7 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 42 | 22 | 41.9 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.04 | 7.58 | 6.5 | 8.5 | (2.) | Chlorides | | | mg/l | | 570 | 96 | 250 | 1000 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 870.5 | 275 | 500 | 2000 | (5.) | Total Hardness | | | mg/l | | 98 | 50 | 300 | 600 | (6.) | Fluoride | | | mg/l | | 1.5 | 0.6 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.98 | 7.89 | A | (2.) | DO | | mg/l | | 3.63 | 3.5 | D | (3.) | BOD | | mg/l | | 3 | 0 | A | (4.) | COD | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 57.30 | 51.30 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50.20 | 40.47 | 55 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 5.7 | 0.608 | (2.) | K(Potassium) | Milligram per Kilogram | | 25 | 11 | (3.) | pH | | | 8.75 | 8.07 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 387.6 | 298.6 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 12.83 | 9.87 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.05 To 37.64 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 13.71 To 27.43 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1450 | 15 | Copy of Permission Letter | Pipeline | | Others | GWIL | CS/Renewal/2015-16/2308/1828 | 08 Sep 2016 | 1500 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 36 | 50 | Packaged Type STP | Green Belt Renewal Plant | | 36 | | (2.) | Boiler | 51 | 200 | Primary Treatment | Reuse within the Plant & Recycling | | 51 | | (3.) | Cooling tower and Blowdown | 170 | 200 | Primary Treatment | Reuse within the Plant & Recycling | | 170 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 257 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 257 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dust From ESP & Bag filter | Industrial Waste | | 14400 | Tons | 25 | Road | | Others | Shall be used in Brick Manufacturing. | (2.) | Mill Scale | Industrial Waste | | 1260 | Tons | 0.5 | Conveyor Belt | | Others | Reutilized in Induction Furnace | (3.) | Metal Scrap | Industrial Waste | | 18000 | Tons | 0.5 | Conveyor Belt | | Others | Reutilized in Induction Furnace | (4.) | coal Char/Dolchar | Industrial Waste | | 10080 | Tons | 0.5 | Conveyor Belt | | Others | Shall be used in CPP (AFBC) | (5.) | Slag | Industrial Waste | | 26460 | Tons | 150 | Road | | Others | Shall be used in road embankment | (6.) | Ash | Industrial Waste | | 4914 | Tons | 01 | Road | | Others | Captive Brick Manufacturing Plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 83.4 | 1.0 | 0.69 | 84.091 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 21.1 | 0.9 | 1.72 | 22.821 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 00 | 00 | 00 | 0.01 | 60 | (4.) | NOx | | Microgram per Meter Cube | 00 | 00 | 00 | 0.01 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Rotary Kiln 1 | Coal | 30 | 1.0 | PM10 | | 29.56 | (2.) | Rotary Kiln 1 | Coal | 30 | 1.0 | SO2 | | 8.82 | (3.) | Rotary Kiln 2 | Coal | 30 | 1.0 | PM10 | | 29.56 | (4.) | Rotary Kiln 2 | Coal | 30 | 1.0 | NOx | | 7.51 | (5.) | AFBC Boiler | Mixture of Coal, legnite & Char | 53 | 1.5 | SO2 | | 13.2 | (6.) | WHRB 1 & 2 | Steam | 30 | 1.0 | PM10 | | 35.93 | (7.) | Induction Furnace 1 & 2 | Electricity | 30 | 1.5 | PM10 | | 17.98 | (8.) | Iron Ore Crusher | - | 12 | 0.3 | PM10 | | 16.57 | (9.) | Product Separation/ Storgage House | -- | 22 | 0.8 | PM10 | | 17.24 | (10.) | Rotary Kiln 3 (Proposed) | Coal | 30 | 1.0 | SO2 | | 8.82 | (11.) | Rotary Kiln 4 (Proposed) | Coal | 30 | 1.0 | NOx | | 7.51 | (12.) | AFBC Boiler (Proposed) | Mixture of Coal, Legnite & Char | 53 | 1.5 | SO2 | | 13.2 | (13.) | AFBC Boiler (Proposed) | Mixture of Coal, Legnite & Char | 53 | 1.5 | NOx | | 10.56 | (14.) | WHRB 3 & 4 | Steam | 30 | 1.0 | PM10 | | 35.96 | (15.) | Product Separation/ Storage House | - | 22 | 0.8 | PM10 | | 17.24 | (16.) | Rotary Kiln 4 (proposed) | Coal | 30 | 1.0 | PM10 | | 29.56 | (17.) | Rotary Kiln 1 | Coal | 30 | 1.0 | NOx | | 7.51 | (18.) | Rotary Kiln 4 (Propopsed) | Coal | 30 | 1.0 | SO2 | | 8.82 | (19.) | Cooler Discharge Building | - | 6 | 0.48 | PM10 | | 21.0 | (20.) | Intermigiate Bins | - | 12 | 0.3 | PM10 | | 15.24 | (21.) | Rotary Kiln 3 (Proposed) | Coal | 30 | 1.0 | NOx | | 7.51 | (22.) | Rotary Kiln 2 | Coal | 30 | 1.0 | SO2 | | 8.82 | (23.) | AFBC Boiler | Mixture of Coal, legnite & Char | 53 | 1.5 | PM10 | | 26.96 | (24.) | AFBC Boiler | Mixture of Coal, legnite & Char | 53 | 1.5 | NOx | | 10.56 | (25.) | Coal Crusher/ Screen House | - | 18 | 0.8 | PM10 | | 13.98 | (26.) | Cooler Discharge Building | -- | 6 | 0.48 | PM10 | | 21.0 | (27.) | Rotary Kiln 3 (proposed) | Coal | 30 | 1.0 | PM10 | | 29.56 | (28.) | AFBC Boiler (Proposed) | Mixture of Coal, Legnite & Char | 53 | 1.5 | PM10 | | 26.96 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60310 | (b)Source | GETCO and Own CPP | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 x 500 KVA | (e)Stack Height (in m) | 15 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 35.3798 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 35.3798 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 00 | (b)Waste/Barren Land (ha.) | 00 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 00 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 35.38 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Land | 00 | Total (ha.) | 35.38 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 15.59023 | None | (2.) | Green belt | | 11.7334 | None | (3.) | Others | Open Area & Amenity | 8.056165 | None | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 00 | NA | (2.) | Critically Polluted Area | NA | 00 | NA | (3.) | NPA | NA | 00 | NA | (4.) | ESZs | NA | 00 | NA | (5.) | Wildlife Corridors | NA | 00 | NA | (6.) | WLS | NA | 00 | NA | (7.) | ESAs | NA | 00 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 00 | NA | (2.) | Defence Installations | | NA | 00 | NA | (3.) | Forest | | NA | 00 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 35.3798 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Gulf of Kutch | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 3.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 520 | (c)Temporary Employment- During Construction | 00 | (d)Temporary Employment- During Operation | 381 | (e)No. of working days | 300 | (f)Total Manpower | 901 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Percentage of Total Project Area | 33.16 | 00 | 33.16 | (2.) | Total Area of Green Belt | 11.7334 | 00 | 11.7334 | (3.) | No. of Plants | 13800 | 1000 | 14800 | (4.) | Funds Allocated | 20000000 | 300000 | 20300000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | MS scrap will be reused
Greenbelt Development | (2.) | Social | • The proposed expansion project will provide quality product at lower cost to the users.
• There should be positive impact on the socio-economic condition of the area in terms of direct and indirect employment due to the proposed project.
• Numbers of local trained persons are likely to find jobs.
• Country will save valuable foreign exchange as import of these products will reduce by corresponding amount.
• These products also have export potential. Hence, possibility of earning foreign exchan | (3.) | Financial | Revenue generation in form of GST, IT and Other Taxes for State and Central Government. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0101 | (ii)Name of the EIA Consultant | Pollution and Ecology Control Services | (iii)Address | Near Dhantoli Police Station, Dhantoli Nagpur-440012 | (iv)Mobile No. | 9373128182 | (v)Landline No. | 0712229322 | (vi)Email Id | pecs_nagpur@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 15 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Submission of reply of the representation made at MOEF & CC along with ADS for the proposed expansion of 72,000 TPA Sponge Iron to 1,,44,000 TPA by Installation of additional Two no. Kilns of 100 TPD each, Mild Steel from 1,80,000 TPA to 3,60,000 TPA by installation of additional two nos. of Induction furnaces 20T capacity each, Rolling & section mill, Captive power plant from 4MW to 6MW and Waste Heat Recovery Power Plant IWHRB) from 6MW to 1OMW by M/s Nilkanth Concast Private Limited at Vadala Village, Mundra Taluka, Kutch District, Gujarat | 02 Oct 2021 | 2. | NA | the Committee recommended that Ministry may forward a copy of the public representation to proponent to provide their comments and clarifications along with their ADS reply. Accordingly, the proposal to be returned in present form. | 11 Jul 2021 | 3. | ADS Reply Letter | Submission of Additional Details Sought (ADS) by MOEF&CC for the proposed expansion of 72,000 TPA Sponge Iron to 1,,44,000 TPA by Installation of additional Two no.
Kilns of 100 TPD each, Mild Steel from 1,80,000 TPA to 3,60,000 TPA by installation of additional two nos. of Induction furnaces 20T capacity each, Rolling & section mill, Captive
power plant from 4MW to 6MW and Waste Heat Recovery Power Plant IWHRB) from 6MW to 1OMW by M/s Nilkanth Concast Private Limited at Vadala Village, Mundra Taluka, Kutch District, Gujarat | 12 Jun 2021 | 4. | NA | Proposal deferred for want of additional information. | 06 Nov 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mr.Suresh S Sarbaliya | Designation | General Manager - P & A | Name of Company (Applicant Name should not be given here) | NILKANTH CONCAST PRIVATE LIMITED | Address | Survey No.221,Vil.Vadala,
Taluka.Mundra, Dist.Kutch |
|