Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) a) Proposed Expansion of Monochloro Acetic Acid (MCA) plant at Village Atul, District Valsad by M/s. Anaven LLP
(b)Name of the Company / Organisation ANAVEN LLP
(c)Registered Address At & PO Atul, Dist. Valsad,,Valsad,Gujarat-396020
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Santosh Kumar Ramani
(b)Designation (Owner/ Partner/ CEO) Factory Manager
(c)Address At and PO. Atul, Dist. Valsad,,Valsad,Valsad,Gujarat-396020
(d)Pin code 396020
(e)E-mail purvesh_shroff@atul.co.in
(f)STD Code. 2632(f)Telephone No. 233264
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/79197/2018
(d)Master Proposal Number(Single Window) SW/114255/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. a) Plot No. 33/P1 (Part of plot no. 33)
(b)Pincode 396020
(c)Bounded Latitudes (North)
From
Degree 20.5379
Minutes
Second
From
Degree 20.5388
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.9426
Minutes
Second
From
Degree 72.9456
Minutes
Second
(e)Survey of India Topo Sheet No. F43S14, F43S15, F43T2,F43T3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.42
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratValsadValsad
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/286/2018-IA-II(I)
(b)Date of Apply of TOR 20 Sep 2018
(c)Date of Issue of TOR / Standard ToR 28 Oct 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :1.6
Gram Panchayat Hall, Village Atul, Ta & Dist: Valsad (Gujarat)
State :Gujarat
District :Valsad
Tehsil :Valsad
Village :Atul
2221. Preference shall be given to local people for employment 2. Proper mitigations measures shall be adopted so local people don’t suffer due to pollution such as water, air and hazardous wasteDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Monochloro acetic acid32000 MTPA-
(2.)HE- Di-chloro and Tri-chloro acetic acid448.0 MTPA-
(3.)36% HCl41600 MTPA-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)36% HCl41600Tons per AnnumPipe Conveyor
(2.)Monochloro acetic acid32000Tons per AnnumPipe Conveyor
(3.)HE- Di-chloro and Tri-chloro acetic acid448Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Apr 2019
(iv)Valid Upto 03 Nov 2019
(v)File No. NA
(vi)Application No. 13359
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 187.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 20.48
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.48
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Acetic Acid0.027OthersMT/MTLOCAL\IMPORTEDRoad250 Open MarketCopy of Linkage
(2.)Acetic anhydride0.027OthersMT/MTLOCAL\IMPORTEDRoad250 Open MarketCopy of Linkage
(3.)Chlorine0.797OthersMT/MTLOCALPipe Conveyor0.2 Open MarketCopy of Linkage
(4.)Hydrogen0.005OthersMT/MTLOCALPipe Conveyor0.2 CaptiveCopy of Linkage
(5.)Caustic soda lye (32%)0.03OthersMT/MTLOCALPipe Conveyor0.2 CaptiveCopy of Linkage
(6.)Catalyst0.00003OthersMT/MTImportedRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube93.26991.7100
(2.)PM2.5Micro Gram per Meter Cube45.52744.860
(3.)SO2Micro Gram per Meter Cube10.26.51080
(4.)NOxMicro Gram per Meter Cube20.714.220.780
(5.)OthersVOCMicro Gram per Meter Cube1.01.01.0-
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l7481885002000
(2.)Total Hardnessmg/l29050200600
(3.)pHNA8.457.638.58.5
(4.)Fluoridemg/l0.980.1111.5
(5.)Chloridesmg/l284552501000
(6.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l72D
(2.)CODmg/l218A
(3.)pHmg/l8.096.51A
(4.)DOmg/l4.73.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))71.153.975
(2.)Leq(Night)A-weighted decibels(dB(A))64.844.370
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersdS/m0.680.17
(2.)K(Potassium)Othersg/kg0.070.02
(3.)pH8.257.07
(4.)P(Phosphorus)Percent0.020.003
(5.)N(Nitrogen)Percent0.090.06
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersAtul Limited186.10Copy of Permission LetterPipelineOthersThrough Pump375520 Jun 2017186.1
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial + Domestic318350Treated in ETP followed by RO-MEEOthersTreated water will be Recycle in process313.34.7
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 318
(b)Total Discharged Water (Kilolitre per Day) 4.7
(c)Total Reused Water (Kilolitre per Day) 313.3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeIndustrial Waste1120Tons0.5RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Liners and used containersIndustrial Waste3.14Tons20RoadAuthorized Recyclers
(3.)Used OilIndustrial Waste6.27Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Spent CatalystIndustrial Waste0.96Tons250RoadOthersSent to Re generator
(5.)Salt (NaCl) from MEE/MVIndustrial WasteSalt (NaCl) from MEE/MVR1551Tons0.5RoadOthersSell to authorized vendor or TSDF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube82.3010.0482.35100
(2.)SO2Microgram per Meter Cube8.511.259.7680
(3.)NOxMicrogram per Meter Cube17.510.4617.9780
(4.)Others(Specify)COMicrogram per Meter Cube1.010.131.14-
(5.)PM2.5Microgram per Meter Cube0000.0010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (500 KVA)HSD100.2PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8610000
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.6630327
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.66303
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 132.14
(b)Waste/Barren Land (ha.) 9.7
(c)Grazing/ Community Land (ha.) 31.83
(d)Surface Water Bodies (ha.) 52.14
(e)Settlements (ha.) 28.42
(f)Industrial (ha.) 3.41
(g)Forest (ha.) 1.53
(h)Mangroves (ha.) 1.30
(i)Marine Area (ha.) 0
(j)Others (ha.) : Grassland, Beach Area, Salt Pan, Mining Area 0.6
    Total (ha.) 261.07
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.04
(2.)Green belt0.06
(3.)Area for Solid Waste Management0.06Storage area
(4.)OthersProcessing Area0.18
(5.)Built Up Area0.32
Total (ha.) 0.66
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone0-
(2.)Critically Polluted AreaNone0-
(3.)WLSNone0-
(4.)ESAsNone0-
(5.)CorridorsNone0-
(6.)NPANone0-
(7.)Wildlife CorridorsNone0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestR.F. at Village Parnera0.77In NNE Direction
(2.)Archaeological Sites-0No Archaeological Sites present in the study area
(3.)Defence Installations-0-
(4.)OthersMountains/ HillsParnera Hill (R.F.)0.77In NNE Direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.66
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired c) Additional land is not required for proposed ex
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 500000
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Par River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.42
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 72
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 50
(e)No. of working days 333
(f)Total Manpower 422
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.065
(b)Percentage of Total Project Area 9.80
(c)No. of Plants to be Planted 270
(d)Funds Allocated for Plantation 1100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social• Help to needy children in the schools; • Providing drinking water to nearby villagers; • Helping Gram Panchayat in improving sanitation facilities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0042
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura, Vadodara- 390010
(iv)Mobile No. 9714861611
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Layout map showing plant/utilities of M/s Atul and M/s Anaven LLP, - EC status of M/s Atul and the compliance status thereof. 06 Sep 2019
2.NAThe correction have been made as per the instruction received 24 Sep 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of the query raised. Please do the needful. 11 Jun 2020
2.NA

The EAC, after deliberations, noted that the Consultant needs to submit correct information as desired against query at serial no. 6 raised by the EAC. This act of the consultant is treated as concealing the facts and shall be reported to the NABET/QCI.  The Committee suggested tha project site may be visited to verify the facts of PH and issues of Air Environment as per EIA report and presentation.

06 Feb 2020
3. ADS Reply LetterReply of ADS generated after EC Presentation dated 21st November 2019 19 Dec 2019
4.NA

The EAC, after deliberations, insisted for certain information/inputs as under:-