Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Sukinda Mines (Chromite)
(b)Name of the Company / Organisation Indian Metals & Ferro Alloys Ltd
(c)Registered Address Bomikhal, Rasulgarh,Bomikhal, Rasulgarh,Khordha,Sikkim-751010
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sandeep B Narade
(b)Designation (Owner/ Partner/ CEO) Vice President
(c)Address Bomikhal, Rasulgarh,Bomikhal, Rasulgarh,,Khordha,Orissa-751010
(d)Pin code 751010
(e)E-mail minesplanningcell@imfa.in
(f)STD Code. 674(f)Telephone No. 2580100
(g)Fax No. 2580020
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/OR/MIN/114264/2007
(d)Master Proposal Number(Single Window) SW/114259/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. khasra no. 488 (p), 502, 627 (p), 628 (p), 629, 63
(b)Pincode 751010
(c)Bounded Latitudes (North)
From
Degree 21.029308
Minutes
Second
From
Degree 21.042725
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.759975
Minutes
Second
From
Degree 85.7783
Minutes
Second
(e)Survey of India Topo Sheet No. 73-G/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 185
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.91
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/204/2015-IA.II(M)
(c)Date of Issue of TOR 31 Jul 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Sep 2019
(c)Date of Issue of EC 28 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 May 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Jun 2017
Distance of Public Hearing Venue from the Proposed Project :0.5
At Mahagiri Enclave, Khata no. 53/15, Plot no. 664
State :Orissa
District :Jajpur
Tehsil :Sukinda
Village :Kaliapani
650Local employment opportunity, health care facility, drinking water supply, road maintenanceOthersAdditional District Magistrate (ADM)
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-409/EPE/83
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 22 2016 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Chromite Ore351000249000600000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Wagon Drill (115 mm)101For opencast mining
(2.)Dumper (32 Tonne)21526For opencast mining
(3.)Dozer (170 HP to 200 HP)303For opencast mining
(4.)Front End Loader (0.3 to 1.7 cum)112For opencast mining
(5.)Water tanker (9 to 14 KL)303For opencast mining
(6.)Explosive Van (2.39 Tonnes)101For opencast mining
(7.)Grader (135 HP)101For opencast mining
(8.)Excavator (0.9 to 3.5 cum)415For opencast mining
(9.)Diesel Dispensing Unit (6 KL)101For opencast mining
(10.)Roller011For opencast mining
(11.)Ambulance101For opencast mining
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 06 Feb 2016
(iv)Valid Upto 31 Mar 2021
(v)File No. 2483/IND-I-CON-2274
(vi)Application No. 409649 dated 04.12.2015
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 394.45
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.98
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.43
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 5
(c)Total quantity of raw material/fuel 5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD31250Kilo Litre per DayIOCLRoad1.5 Fuel Supply AgreementCopy of Linkage
(2.)EXPLOSIVE28Tons per AnnumMagazine SMCRoad0.17 OthersLicenseCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Oct 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 13
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube8.14.37.280
(2.)NOxMicro Gram per Meter Cube19.110.318.680
(3.)PM10Micro Gram per Meter Cube40.423.136.7100
(4.)PM2.5Micro Gram per Meter Cube19.912.219.160
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l4510250250
(2.)TSSmg/l0000
(3.)pHNA7.56.56.58.5
(4.)TDSmg/l224.333.1500500
(5.)Total Hardnessmg/l14224200200
(6.)Fluoridemg/l1.280.111
(7.)Heavy MetalsTotal Chromiummg/l0.520.330.050.05
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.44.5C
(2.)BODmg/l8.41.5C
(3.)CODmg/l4016C
(4.)pHmg/l8.27.0C
    14.4.     No. of Ambient Noise monitoring locations : 13
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))62.548.545-70
(2.)Leq(Day)A-weighted decibels(dB(A))67.957.555-75
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersmicrosiemens per centimeter136.322.3
(2.)N(Nitrogen)Milligram per Kilogram92.971.1
(3.)K(Potassium)Milligram per Kilogram4516.2
(4.)pH8.16.2
(5.)P(Phosphorus)Milligram per Kilogram12.32.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/MIN/REN/1/2018/5556
(f)Date of Issue 14 Dec 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater35000Copy of Permission LetterPipelineTube WellCGWA/NOC/MIN/REN/1/2018/555614 Dec 20183500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Drinking & Domestic1920soak pitOthersdischarge to septic tank via soak pit0192
(2.)Mine water32600ETPDischarge into Surface Water Body,Reuse within the Plant & Recycling203240
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3452
(b)Total Discharged Water (Kilolitre per Day) 3432
(c)Total Reused Water (Kilolitre per Day) 20
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Tailings from COB plantIndustrial Waste25000Tons0RoadOthersDesignated place near sub grade dump
(2.)Overburden/InterburdenOthersOverburden407407Tons0RoadOthersInternal OB dump & backfilling of excavated area
(3.)Municipal Solid wasteMunicipal Solid Waste51.1Tons0RoadSanitary Landfills
(4.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18.25Kilolitre0RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube27.80.93.531.5100
(2.)PM2.5Microgram per Meter Cube14.60.92.3716.9960
(3.)NOxMicrogram per Meter Cube14.40.911.4525.9580
(4.)SO2Microgram per Meter Cube5.60.90.66.480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setsHSD4.50.5PM100.25
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4750
(b)Source CESU
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 62.5 KVA, 200 KVA, 82.5 KVA, 250 KVA
(e)Stack Height (in m) 4.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 115.05
(b)Private Land (ha.) 0
(c)Government Land (ha.) 1.71
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 116.76
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 1.71
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 115.05
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Not Applicable 0
    Total (ha.) 116.75999999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area42.437At the end of conceptual period
(2.)OB Dump Area51.683At the end of conceptual period
(3.)Township1.050At the end of conceptual period
(4.)Safety Zone4.138At the end of conceptual period
(5.)OthersMineral Storage17.452
Total (ha.) 116.76
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0Not Applicable
(2.)CorridorsNot Applicable0Not Applicable
(3.)Wildlife CorridorsNot Applicable0Not Applicable
(4.)Critically Polluted AreaNot Applicable0Not Applicable
(5.)ESAsNot Applicable0Not Applicable
(6.)ESZsNot Applicable0Not Applicable
(7.)NPANot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMahagiri PF0Project area falls within PF
(2.)Defence InstallationsNot Applicable0Not Applicable
(3.)OthersNot ApplicableNot Applicable00
(4.)Archaeological SitesNot Applicable0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 116.76
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Total land acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Four horned antelope, Indian elephant, Mouse deer, Sloth bear, Pea fowl, Spotted owlet, python, yellow monitor lizard, Great Indian hornbill, Bengal monitor, Ratel or Honey Badger
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs 63.77 lakhs & Rs 257 lakhs towards conservatio
(iii)Period of Implementation It is already implemented
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 10061/1WL-SSP-181/2015
(iii)Date of issue 18 Nov 2015
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damsal Nala
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 0.74
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 195
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 726
(e)No. of working days 300
(f)Total Manpower 921
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt23.6604.728.36
(2.)Percentage of Total Project Area20.264.0224.28
(3.)No. of Plants744761175086226
(4.)Funds Allocated12820
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAfforestation within the lease area will increase the aesthetic beauty of the area
(2.)SocialProject will create direct and indirect employment
(3.)FinancialRoyalty paid will contribute to revenue of the State Government.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Chromite OreMajor
2.
Mine Capacity in ROM (Run of Mine) 6.0 Lakh TPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MS/FM/27-ORI/BHU/2018-19
(b)Date of Approval 31 Oct 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 116.76
(f)Approved Capacity 6.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 34.533 (as on 01.07.2018)
(b)Mineable Reserves (Million Ton) 11.961 (as on 01.07.2018)
(c)Extractable Reserves(Million Ton) 11.961
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 10-54% of Cr2O3
(f)Stripping Ratio 1 : 4.2
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 30
(i)Mining Method Mixed
(j)Life of Mine (Years) 48 years as per present exploration
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology wet gravity separation by Tabling & Falcon Concent
(c)Capacity 40
(d)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 116.76
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease has already been executed
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 116.76
(iii)Validity of the lease deed From : 04 Sep 1999 To : 03 Sep 2049
(iv)Date of Execution of Mining Lese 04 Sep 1999
(v)Reference Number 2085
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease is valid till 03.09.20149 as per MMDR Amendm
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 42.437
(b)Depth (in meter) 138
(c)Volume (in Million Cubic meter) 20.90
12.
Details of Quarry:
(a)Final Void of 42.437 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 42.437
13.
Details of Transportation:
(a)In Pit/Underground to Surface Truck/Dumper
(b)Surface to Siding/Loading Truck/Dumper
(c)Transportation / Conveyor Details Road,Rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)SETTLEMENTS000
(3.)OTHERS(Specify)Not Applicable000
(4.)FOREST LAND115.050115.05
(5.)WASTE LAND1.71001.71
(6.)SURFACE WATER BODIES000
(7.)GRAZING LAND000
TOTAL116.760116.76
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)ROADS002.9202.92
(3.)OtherMineral Storage, ETP005.5825.582
(4.)VIRGIN AREA0000
(5.)EXCAVATION/QUARRY42.4370042.437
(6.)EXTERNAL OB DUMPS0000
(7.)INTERNAL OB DUMPS51.6830051.683
(8.)BUILT UP AREA (COLONY/OFFICE)001010
(9.)GREEN BELT4.138004.138
TOTAL98.258018.5020116.76
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan
Total Area Excavated (in hectare)
Total Area Backfilled after Excavation (in hectare)
Total Area Reclaimed (in hectare)
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2001200200198190214315.685167650.265
(2.)20052006255000255000206008259925.1124925.112
(3.)20102011351000351000252000251995.000.000
(4.)20152016351000351000273786273548.8300.000
(5.)20162017351000351000351000350512.000.000
(6.)20172018351000351000351000350571.5600.000
(7.)20042005255000255000170761243584.9630.000
(8.)20072008255000255000349938295817.66040817.660
(9.)20082009351000255000419310284753.4590.000
(10.)20092010351000255000200276218618.00.000
(11.)20112012351000351000377530350168.000.000
(12.)2000200100229780144802.45098137.030
(13.)20092010351000255000200276218618.000.000
(14.)20022003255000255000224102188376.994114001.994
(15.)20032004255000255000256500309615.04654615.046
(16.)20062007255000255000285829235466.6810.000
(17.)20132014351000351000350994348568.5100.00
(18.)199920000012557046665.4200
(19.)20182019351000351000351000341003.000.000
(20.)20122013351000351000351000296635.9400.00
(21.)20142015351000351000282467258580.3500.000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Tribunals
(c)Name of the Sub Court Central Administrative Tribunal
(d)Case No. RA No. 22/46/2018/RC-I
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Having considered revision petition of project. Ma
(f)Case Details Revision application was filed challenging the dem
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. S.No. 112, Rev.77, July 10, 2019
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th Floor, NN Mall, Sec-3, Rohini, New Delhi-110085
(iv)Mobile No. 9818346370
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 21 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP is requested to submit the following: 1. Certified compliance report for existing EC 2. EIA report is not as per the format. Content of EIA report comprises 10 chapter only. Please check and upload the correct document. 3. Updated status of the court cases. 4. Copy of EC document for the capacity of 2.55 lakh tonnes per annum. 5. Authenticated Certificate for hydro-geologist and the laboratory who carried out the hydrogeological study 06 Sep 2019
2.NAThe correction have been made as per the instruction received 12 Sep 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of ADS generated vide 18th EAC meeting dated 22.06.2020 16 Jul 2020
2.NA

deferred

01 Jul 2020
3. ADS Reply LetterReply of ADS generated vide letter no. J-11015/204/2015-IA.II (M) dated 13.12.2019. 31 Jan 2020
4.NA

Based on the presentation made by PP and the discussion held, the Committee deferred the proposal and asked the PP to submit requisite information for further consideration.

i.

Print