1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. BHARAT RASAYAN LIMITED (UNIT-II) | (b)Name of the Company / Organisation | BHARAT RASAYAN LIMITED BRL | (c)Registered Address | 1501, Vikram Tower, Rajendra Place, New Delhi,,New Delhi,Delhi-110008 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ajay Kumar Gupta | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Unit - II, Plot No. 42/4, Dahej GIDC Industrial Estate, Dahej,,Vagra,Bharuch,Gujarat-392130 | (d)Pin code | 392130 | (e)E-mail | brldahej@bharatgroup.co.in | (f)STD Code. | 11(f)Telephone No. | 224805 | (g)Fax No. | 43661100 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/114039/2008 | (d)Master Proposal Number(Single Window) | SW/114036/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 42/4 | (b)Pincode | 392130 | (c)Bounded Latitudes (North) | | From | | Degree | 21.721475 | Minutes | | Second | | From | | Degree | 21.726558 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.591178 | Minutes | | Second | | From | | Degree | 72.593814 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M09, F43M10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 6 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/961/2008-IA-II (I) | (c)Date of Issue of TOR | 25 Feb 2009 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 07 Sep 2019 | (c)Date of Issue of EC | 19 Oct 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Projrect Site is located within Dahej-I GIDC Indus | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | File No. 5-8/2011(ENV)/410 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 16 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Agrochemicals & their intermediates | 12300 | 16900 | 29200 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Multi Purpose Plant | MPP - A, B, C | MPP - D, E, F | 6 Nos. MPP | Please refer Annexure - 16 for more details | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 22 Jan 2018 | (iv)Valid Upto | 11 Oct 2020 | (v)File No. | AWH-90645 | (vi)Application No. | 126940 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 200 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 16 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 27.201 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 70000 | (b)Existing quantity of raw material/fuel | 10000 | (c)Total quantity of raw material/fuel | 80000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Natural Gas | 80000 | Others | SM3/day | Gujarat Gas Company Ltd | Pipe Conveyor | | 30 | Linkage | | Copy of Linkage | (2.) | Furnace Oil | 90 | Others | MT/Day | IOCL | Road | | 30 | Linkage | | Copy of Linkage | (3.) | HSD Fuel | 17 | Others | KL/Day | IOCL / Local suppliers | Road | | 30 | Open Market | | Copy of Linkage | (4.) | Coal | 200 | Others | MT/Day | Adani Coal Supply | Road | | 30 | Open Market | | Copy of Linkage | (5.) | Raw material | 7658 | Others | MTM | Indigenous & Import from other country | Road,Rail,Others | Sea, Air | 300 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2019 To 31 Mar 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 119 | 51 | 95 | NAAQS | (2.) | PM2.5 | | Micro Gram per Meter Cube | 49 | 16 | 45 | NAAQS | (3.) | SO2 | | Micro Gram per Meter Cube | 33 | 6 | 31 | NAAQS | (4.) | NOx | | Micro Gram per Meter Cube | 35 | 14 | 33 | NAAQS | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.8 | 8.1 | 7 | 8.5 | (2.) | TDS | | | mg/l | | 3892 | 498 | 10 | 10 | (3.) | Total Hardness | | | mg/l | | 586 | 121 | 10 | 10 | (4.) | Fluoride | | | mg/l | | 1.1 | 0.5 | 0.5 | 0.5 | (5.) | TSS | | | mg/l | | 330 | 10 | 10 | 10 | (6.) | Heavy Metals | | Zinc | mg/l | | 0.2 | 0.2 | 0.2 | 0.2 | (7.) | Chlorides | | | mg/l | | 773 | 43 | 1 | 1 | |
14.3. No. of Surface Water monitoring locations : 13 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 10 | 10 | A | (2.) | COD | | mg/l | | 16 | 4 | A | (3.) | DO | | mg/l | | 7.5 | 5 | A | (4.) | pH | | NA | | 8.3 | 8.2 | A | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 69 | 34 | Noise Rules, 2000 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 73 | 41 | Noise Rules, 2000 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 21.3 | 2.4 | (2.) | K(Potassium) | Milligram per Kilogram | | 840 | 245 | (3.) | Electric Conductivity | Others | µsm/ cm | 4619 | 275 | (4.) | N(Nitrogen) | Percent | | 0.81 | 0.32 | (5.) | pH | | | 9.16 | 8.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 8 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3077 | 4 | Copy of Permission Letter | Pipeline | | Weir | | -- | 18 Feb 2019 | 1419 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 100 | 120 | To be treated in STP | Others | Gardening/Mixed with Industrial effluent | 0 | 100 | (2.) | Industrial | 1750 | 1700 | To be treated in ETP/MEE/RO | Others | Discharge into deep sea via u/g GIDC pipeline | 130 | 1620 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1850 | (b)Total Discharged Water (Kilolitre per Day) | 1720 | (c)Total Reused Water (Kilolitre per Day) | 130 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Tons | 15 | Road | | Authorized Recyclers | | (2.) | hydrobromic acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 907 | Tons | 50 | Road | | Others | Actual end users | (3.) | Spent Acid (Dilute H2SO4) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2144 | Tons | 50 | Road | | Others | Actual end users | (4.) | Ammonium Sulphate Soln | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 496 | Tons | 50 | Road | | Others | Actual end users | (5.) | Date expired and off-specification on residues | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 60 | Tons | 50 | Road | | Others | Incineration at ICHWMF Site | (6.) | Sodium Sulfite Solids | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4360 | Tons | 50 | Road | | Others | Actual end users | (7.) | Sodium Sulfite Soln | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 7548 | Tons | 50 | Road | | Others | Actual end users | (8.) | Discarded Containers, barrels, liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1825 | Tons | 15 | Road | | Authorized Recyclers | | (9.) | Potassium Chloride Solution | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6575 | Tons | 50 | Road | | Others | Actual end users | (10.) | Cupric Chloride | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 24 | Tons | 50 | Road | | Others | Actual end users | (11.) | Mixed Solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 363 | Tons | 50 | Road | | Others | Actual end users | (12.) | Process Waste/Waste residue containing pesticides | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2584 | Tons | 50 | Road | | Others | co-processing / Incineration at ICHWMF Site | (13.) | ETP & MEE Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15000 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (14.) | Coal Ash | Others | Non-Hazardous Waste | 5840 | Tons | 50 | Road | | Others | sell to brick manufactures and/or cement industry | (15.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 245 | Tons | 50 | Road | | Others | co-processing / Incineration at ICHWMF Site | (16.) | Ammonia Solution | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 288 | Tons | 50 | Road | | Others | Actual end users | (17.) | Potassium chloride Solids | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 37 | Tons | 50 | Road | | Others | Actual end users | (18.) | Aq Alum | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 13920 | Tons | 70 | Road | | Others | Actual end users | (19.) | Sodium Bromide Soln | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2806 | Tons | 50 | Road | | Others | Actual end users | (20.) | Potassium Bromide Soln | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1264 | Tons | 50 | Road | | Others | Actual end users | (21.) | Potassium Bromide (solid) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 225 | Tons | 50 | Road | | Others | Actual end users | (22.) | Ammonium Chloride | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1375 | Tons | 50 | Road | | Others | Actual end users | (23.) | Hydrochloric Acid Soln | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 8286 | Tons | 50 | Road | | Others | Actual end users | (24.) | Phosphoric Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 126 | Tons | 50 | Road | | Others | Actual end users | (25.) | Methane Sulfinic Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Tons | 50 | Road | | Others | Actual end users | (26.) | Used catalyst (spent catalyst) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4.3 | Tons | 50 | Road | | Others | Actual end users | (27.) | Sodium bi sulfide Soln | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1112 | Tons | 50 | Road | | Others | Actual end users | (28.) | DMA Solution-40% | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 116 | Tons | 50 | Road | | Others | Actual end users | (29.) | Acetic Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 28 | Tons | 50 | Road | | Others | Actual end users | (30.) | Sulfur (Solid) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 27 | Tons | 50 | Road | | Others | Actual end users | (31.) | Potassium methane sulfinate salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 222 | Tons | 50 | Road | | Others | Actual end users | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 45 | 1.05 | 0.20 | 45.201 | NAAQS | (2.) | PM10 | | Microgram per Meter Cube | 94 | 1.05 | 0.45 | 94.455 | NAAQS | (3.) | NOx | | Microgram per Meter Cube | 33 | 1.05 | 1.59 | 34.592 | NAAQS | (4.) | SO2 | | Microgram per Meter Cube | 31 | 1.05 | 3.88 | 34.885 | NAAQS | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Common Stack attached to Boiler-1&2, TFH-1&2 | NG OR FO, Coal | 30 | 1.1 | Others | PM, SO2, NOX | 150 mg/Nm3, 100 ppm, 50 ppm | (2.) | DG Set-1 | HSD | 11 | 0.15 | Others | PM, SO2, NOX | 150 mg/Nm3, 100 ppm, 50 ppm | (3.) | Common Stack attached to Boiler-3, THF-3&4 | NG OR FO, Coal | 40 | 1.3 | Others | PM, SO2, NOX | 150 mg/Nm3, 100 ppm, 50 ppm | (4.) | DG Set - 2 | HSD | 15 | 0.15 | Others | PM, SO2, NOX | 150 mg/Nm3, 100 ppm, 50 ppm | (5.) | Process Vent - 2 | NA (Process Stack) | 15 | 0.15 | Others | HCl, Cl2, VOC | 20, 5 mg/Nm3 | (6.) | Process Vent - 6 | NA (Process Stack) | 15 | 0.15 | Others | HCl, SO2 | 20, 40 mg/Nm3 | (7.) | Process Vent - 7 | NA (Process Stack) | 15 | 0.15 | Others | PM | 150 mg/Nm3 | (8.) | General Stack - 1 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (9.) | General Stack - 2 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (10.) | General Stack - 3 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (11.) | General Stack - 5 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (12.) | General Stack - 6 | NA (Process Stack) | 15 | 0.15 | Others | HCl, Cl2 | 20, 5 mg/Nm3 | (13.) | General Stack - 7 | NA (Process Stack) | 15 | 0.15 | Others | DMA | -- | (14.) | General Stack - 8 | NA (Process Stack) | 15 | 0.15 | Others | NaCN | -- | (15.) | Process Vent - 10 | NA (Process Stack) | 15 | 0.15 | Others | HCl, SO2 | 20, 40 mg/Nm3 | (16.) | General Stack - 9 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (17.) | Process Vent - 3 | NA (Process Stack) | 15 | 0.15 | Others | H2S | 5 mg/Nm3 | (18.) | Process Vent - 4 | NA (Process Stack) | 15 | 0.15 | Others | HCl, SO2 | 20, 40 mg/Nm3 | (19.) | DG Set - 3 | HSD | 15 | 0.15 | Others | PM, SO2, NOX | 150 mg/Nm3, 100 ppm, 50 ppm | (20.) | General Stack - 4 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (21.) | General Stack - 10 | NA (Process Stack) | 15 | 0.15 | Others | HCl | 20 mg/Nm3 | (22.) | Process Vent - 5 | NA (Process Stack) | 15 | 0.15 | Others | HCl, SO2 | 20, 40 mg/Nm3 | (23.) | Process Vent - 8 | NA (Process Stack) | 15 | 0.15 | Others | PM | 150 mg/Nm3 | (24.) | Process Vent - 9 | NA (Process Stack) | 15 | 0.15 | Others | HCl, SO2 | 20, 40 mg/Nm3 | (25.) | Process Vent - 11 | NA (Process Vent) | 15 | 0.15 | Others | NH3 | 175 mg/Nm3 | (26.) | Process Vent - 12 | NA (Process Stack) | 15 | 0.15 | NOx | | 25 mg/Nm3 | (27.) | General stack - 11 | NA (Process Stack) | 15 | 0.15 | Others | VOC | -- | (28.) | General Stack - 12 | NA (Process Stack) | 15 | 0.15 | Others | PM | 150 mg/Nm3 | (29.) | Process Vent - 1 | NA (Process Stack) | 15 | 0.15 | Others | HCl, Cl2, SO2, HBr, Br2 | 20, 5, 40, 5, 2 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 7000 | (b)Source | Dakshin Gujarat Vij Company Ltd. | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 Nos. of 1500 KVA of Each, 1 No. of 750 KVA | (e)Stack Height (in m) | 15 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 10.510675 | Total Land (ha.) | 10.51067 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 3787 | (b)Waste/Barren Land (ha.) | 10963 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 189 | (e)Settlements (ha.) | 275 | (f)Industrial (ha.) | 10240 | (g)Forest (ha.) | 277 | (h)Mangroves (ha.) | 764 | (i)Marine Area (ha.) | 4921 | (j)Others (ha.) : NA | 0.0 | Total (ha.) | 31416 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 4.740843 | | (2.) | Green belt | | 3.479200 | | (3.) | Others | Approach road(s)/ drains & Open area | 2.290632 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | -- | (2.) | NPA | NA | 0 | -- | (3.) | ESZs | NA | 0 | -- | (4.) | ESAs | NA | 0 | -- | (5.) | Corridors | NA | 0 | -- | (6.) | Wildlife Corridors | NA | 0 | -- | (7.) | WLS | NA | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | -- | (2.) | Defence Installations | | NA | 0 | -- | (3.) | Others | NA | NA | 0 | -- | (4.) | Forest | | Dahej Reserve Forest | 5.74 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.510675 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl, Bengal Monitor Lizard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Pond | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Reservoir, Pond, Estuary | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 350 | (b)Permanent Employment-During Operation | 500 | (c)Temporary Employment- During Construction | 250 | (d)Temporary Employment- During Operation | 400 | (e)No. of working days | 330 | (f)Total Manpower | 1500 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 3.4792 | 0 | 3.4792 | (2.) | Percentage of Total Project Area | 33.10 | 0 | 33.1 | (3.) | No. of Plants | 6400 | 0 | 6400 | (4.) | Funds Allocated | 30 | 50 | 80 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue generation by Exports. Emp generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA0104 | (ii)Name of the EIA Consultant | M/s. SIDDHI GREEN EXCELLENCE PVT. LTD. | (iii)Address | Kamal Arcade – The Vertical Sunclock”, Comm. Plot No. C-3/3, Nr. SBI Industrial Branch, Station Road, G.I.D.C, Ankleshwar – 393 002, Gujarat State, India | (iv)Mobile No. | 9824345895 | (v)Landline No. | 0264622480 | (vi)Email Id | siddhi.ank@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 27 Apr 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please clarify/inform/provide the following:-
- Copy of the existing EC dated 3/7/2009 showing present pesticides production@12300 TPA.
- Complete CCR dated 2/7/2019 to be uploaded against column 9 of Form-2 (presently only forwarding letter)
- Industrial operations/units at plot No.42/4 & 44/4, GIDC Dahej-I. | 06 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 07 Sep 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We have uploaded additional documents as per minutes of the 19th EAC meeting. We request your goodself to consider our proposal and grant EC. | 07 Jul 2020 | 2. | NA | PP vide email dated 06.07.2020 requested to upload the information as sough by the EAC in its earlier meeting, accordingly ADS generated: The request of PP is as:
Respected Sir,
Our unit, M/s. Bharat Rasayan Limited (Unit-II) at Plot No. 42/4, Amod Road, Dahej-I GIDC Industrial Estate, Dahej, District Bharuch, Gujarat, India has attended 19th Expert Appraisal Committee (Industry-2) Meeting held on 13th May, 2020 for consideration of EC of our Expansion project.
We are not able to upload additional documents for M/s. Bharat Rasayan Limited ,Dahej on portal as per minutes of the 19th EAC meeting because ADS has not been raised by authority on parivesh portal.
As per our understanding if ADS has been generated after that We can upload additional documents for EC -reconsideration.
Proposal ID: IA/GJ/IND2/114039/2008
We request you to kindly advise to resolve above issue. | 07 Jul 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ajay Kumar Gupta | Designation | Director | Name of Company (Applicant Name should not be given here) | BHARAT RASAYAN LIMITED BRL | Address | 1501, Vikram Tower, Rajendra Place, New Delhi |
|