1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Kakatiya Khani Opencast-III project | (b)Name of the Company / Organisation | The Singareni Collieries Company Limited | (c)Registered Address | M/s. Singareni Collieries Company Limited
PO: Kothagudem Collieries - 507 101
Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shri G Venkateswara Reddy | (b)Designation (Owner/ Partner/ CEO) | Director (Planning & Projects) | (c)Address | Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101 | (d)Pin code | 507101 | (e)E-mail | gm_env@scclmines.com | (f)STD Code. | 8744(f)Telephone No. | 243059 | (g)Fax No. | 08744244115 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TG/CMIN/113818/2018 | (d)Master Proposal Number(Single Window) | SW/113800/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 63,64,89,9,91,92,702,703,318/71 to 318/76, 318/84 | (b)Pincode | 506345 | (c)Bounded Latitudes (North) | | From | | Degree | 181940 | Minutes | | Second | | From | | Degree | 182256 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 795242 | Minutes | | Second | | From | | Degree | 795530 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 56 N/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 891.977 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/464/2012-IA-ll (M) | (c)Date of Issue of TOR | 22 Apr 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 10 Aug 2019 | (c)Date of Issue of EC | 27 Apr 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.500 |
| Zilla praja parishad secondary school(ZPPSS) | State : | Telangana | District : | Warangal | Tehsil : | Ghanpur (Mulug) | Village : | Baswarajupalli |
| 1800 | Major issues of environmental concerns that emerged during the Public hearing process are land acquisition, depletion of ground water, infrastructure development and employment. | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/2015-16/5/TL | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 22 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 1336.64 ha | 3130000 | 620000 | 3750000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | For Coal mining | UG mine with 3.13 MTPA in 601.2 ha | UG cum OC 0.48 & 3.75MTPA in 1336.64ha | UG cum OC 0.48 & 3.75MTPA in 1336.64ha | Nil | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Jul 2019 | (iv)Valid Upto | 31 Dec 2021 | (v)File No. | 190721981263 | (vi)Application No. | CFO1981263 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 413.84 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 18.303 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.20 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.32 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 12285 | (b)Existing quantity of raw material/fuel | 225 | (c)Total quantity of raw material/fuel | 12510 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Explosives | 12510 | Tons per Annum | | Purchasing from explosive company | Road | | 210 | MoU | | Copy of Linkage | (2.) | Power | 4.6 | Others | MVA | TS Transco sub-station Chelpur village | Others | Through Over head HT line | 5 | Fuel Supply Agreement | | Copy of Linkage | (3.) | Diesel | 45655 | Kilo Litre per Day | | Purchasing from oil companies | Road | | 210 | MoU | | Copy of Linkage | (4.) | Water | 2801 | Kilo Litre per Day | MVA | From the project itself | Others | Not applicable | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 79 | 48 | 77.6 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 49.2 | 27.9 | 48 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 19.6 | 8.1 | 19.6 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 25.1 | 11.1 | 24.3 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.6 | 6.5 | 6.58.5 | 8.5 | (2.) | Chlorides | | | mg/l | | 583 | 65 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 1.8 | 0.321 | 1.0 | 1.5 | (4.) | TDS | | | mg/l | | 1690 | 360 | 500 | 2000 | (5.) | Heavy Metals | | Total chromium as Cr | mg/l | | 0 | 0 | 0 | 0 | (6.) | Total Hardness | | | mg/l | | 905 | 265 | 200 | 600 | (7.) | TSS | | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.7 | 6.5 | A | (2.) | BOD | | mg/l | | 3 | 2 | B | (3.) | DO | | mg/l | | 6.5 | 5.9 | B | (4.) | COD | | mg/l | | 22 | 18 | A | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 51.8 | 47.5 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.4 | 35.1 | 45 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | No | 7.8 | 6.9 | (2.) | P(Phosphorus) | Kilogram per hectare | | 22 | 16 | (3.) | Electric Conductivity | Others | Mmhos/cm | 0.456 | 0.132 | (4.) | N(Nitrogen) | Kilogram per hectare | | 180 | 158 | (5.) | K(Potassium) | Kilogram per hectare | | 514 | 425 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.14 To 15.00 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.10 To 13.20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 2801 | 0 | Copy of Permission Letter | Pipeline | | Others | Pumping | 5855/Hg-II(1)/06-1 | 28 Jun 2006 | 6505 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine | 6505 | 0 | Settling ponds/ slow sand filters | Others | Discharge into neary by Streams/agriculture fields | 2801 | 3704 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 6505 | (b)Total Discharged Water (Kilolitre per Day) | 3704 | (c)Total Reused Water (Kilolitre per Day) | 2801 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | OB | Others | Over burden | 148125000 | Tons | 0 | Others | Dumpers and trucks | Others | Stored as dumps | (2.) | Top soil | Others | Top soil | 1526400 | Tons | 0 | Others | Dumpers and trucks | Others | Temporary storage as dumps | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 70 | 0 | 32.8 | 102.9 | 250 | (2.) | PM2.5 | | Microgram per Meter Cube | 45.8 | 0 | 13.44 | 59.3 | NS | (3.) | NOx | | Microgram per Meter Cube | 12.9 | 0 | 8.59 | 21.5 | 120 | (4.) | SO2 | | Microgram per Meter Cube | 14.1 | 0 | 5.07 | 19.2 | 120 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4600 | (b)Source | TS Transco sub-station, Chelpur village. | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Nil | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 737.28 | (c)Government Land (ha.) | 599.36 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1336.64 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1001.911 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 284.11 | (d)Surface Water Bodies (ha.) | 28.30 | (e)Settlements (ha.) | 17.31 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : roads | 5.01 | Total (ha.) | 1336.6409999999998 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 678.21 | nil | (2.) | OB Dump Area | | 382.04 | nil | (3.) | Safety Zone | | 190.7 | nil | (4.) | Built Up Area | | 50.12 | Mine infrastructure and CHP | (5.) | Water Reservoir | | 25.89 | Nallah Diversion | (6.) | Others | Undisturbed land | 9.68 | Undisturbed (Exclusive UG Area) | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | nil | 0 | nil | (2.) | ESAs | nil | 0 | nil | (3.) | Critically Polluted Area | nil | 0 | nil | (4.) | WLS | nil | 0 | nil | (5.) | Wildlife Corridors | nil | 0 | nil | (6.) | ESZs | nil | 0 | nil | (7.) | Corridors | nil | 0 | nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | nil | 0 | nil | (2.) | Archaeological Sites | | Ramappa Temple | 8.2 | Applied to NMA for issue of NoC, Issue of NOC is in process | (3.) | Forest | | Mulugu RF | 2 | out side the mine boundary | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 179.69 | (b)Land yet to be acquired(Ha) | 1147.27 | (c)Status of Land acquisition if not acquired | under process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 5 | (b)No. of Households | 622 | (c)No. of PDFs (Project Displaced Families) | 728 | (d)No. of PAFs (Project Affected Families) | 86 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 7004 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo cristatus Schedule –I but it common in occurrence. Conservation plan is in process | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | There are six seasonal tanks with in the core zone. A seasonal nallah, Gundla Vagu is flowing over the project area. | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | One seasonal nallah viz. Gundla Vagu passes over the proposed quarry area. Hence, diversion of Gundla Vagu is planned in Northwest and Southwest directions over Northwest property of the proposed quar | (ii)Details of Study Conducted | Nil | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Drainage density is 3.49 km/sq. 169 ephemeral tanks, with a cumulative area of 32.67 sq.km. 10 seasonal water bodies for an area of 21.97 sq.km are chief source of irrigation. | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 8.9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 365 | (b)Permanent Employment-During Operation | 1000 | (c)Temporary Employment- During Construction | 200 | (d)Temporary Employment- During Operation | 760 | (e)No. of working days | 365 | (f)Total Manpower | 2325 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 20 | 1013.05 | 1033.05 | (2.) | Percentage of Total Project Area | 1.49 | 75.79 | 77.28 | (3.) | No. of Plants | 50000 | 2532625 | 2582625 | (4.) | Funds Allocated | 4.01 | 374.99 | 379 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | New jobs will be created and financial status will be improved. | (2.) | Environmental | In the project area of 1336.64 ha an amount of 1033.05 ha will be reclaimed in stage wise by the end of the project. | (3.) | Social | The social infrastructure in terms of connectivity by road, communication, health, sanitation, community centers, education, financial institution will be improved. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 3.0 MTPA (3.75 MTPA Peak) OC and 0.48 MTPA UG | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | No. 38011/ 12/2017 -PCA | (b)Date of Approval | 19 Nov 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 913.95 | (f)Approved Capacity | 3.75 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 120.37 | (b)Mineable Reserves (Million Ton) | 89.16 | (c)Extractable Reserves(Million Ton) | 77.45 | (d)Percent(%) of Extraction | 64.34 | (e)Grade of Coal /Ore /Mineral | G-8 (4920 Kcal/kg) | (f)Stripping Ratio | 1 : 13.48 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Degree-I | (h)Average Gradient(Degree) | 1 in 3.0 | (i)Mining Method | Mixed | (j)Life of Mine (Years) | 31 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 16 | (c)Thickness of seams to be worked on | 13 | (d)Maximum Thickness of Seams (metres) | 0.17 to 4.0 m | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1336.64 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 17 Sep 2018 | (iii)Validity of LOI | 21 | (iv)Reference No. of LOI | 992/PR(A1)/2018 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 913.95 | (iii)Validity of the lease deed | From : 19 Jun 2009 To : 16 Sep 2039 | (iv)Date of Execution of Mining Lese | 19 Jun 2009 | (v)Reference Number | GO MS No. 146 I&C,GO MS No. 455 I&C,GO MS No. 114 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Validity not expired | |
|
9. | OB (Over Burden) Management: | Details Not Applicable | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 10.6 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 10.6 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 211.62 (hectare) at a Depth of 300 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 678.21 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | OC-Dumpers/ UG - Haulage | (b)Surface to Siding/Loading | Trucks | (c)Transportation / Conveyor Details | By road | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | OTHERS(Specify) | Nallah and roads | 8.2 | 0.54 | 8.74 | (2.) | SURFACE WATER BODIES | | 10.51 | 17.79 | 28.3 | (3.) | GRAZING LAND | | 254.13 | 26.25 | 280.38 | (4.) | WASTE LAND | | 0 | 0 | 0 | (5.) | SETTLEMENTS | | 11.28 | 6.03 | 17.31 | (6.) | AGRICULTURE LAND | | 629.83 | 372.08 | 1001.91 | (7.) | FOREST LAND | | 0 | 0 | 0 | |
TOTAL | 913.95 | 422.69 | 1336.64 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXTERNAL OB DUMPS | | 382.04 | 0 | 0 | | 382.04 | (2.) | BUILT UP AREA (COLONY/OFFICE) | | 38.71 | 0.32 | 11.09 | | 50.12 | (3.) | VIRGIN AREA | | 0 | 0 | 9.68 | | 9.68 | (4.) | Other | Safe barrier and nallah diversion | 148.46 | 28.57 | 39.56 | | 216.59 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | INTERNAL OB DUMPS | | 463.84 | 2.75 | 0 | | 466.59 | (7.) | ROADS | | 0 | 0 | 0 | | 0 | (8.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (9.) | EXCAVATION/QUARRY | | 0 | 211.62 | 0 | | 211.62 | |
TOTAL | 1033.05 | 243.26 | 60.33 | 0 | 1336.64 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | | (b)Internal Dump(in hectare) | | (c)Quarry(in hectare) | | (d)Safety Zone(in hectare) | | (e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | | (h)Total afforestation plant (in hectare) | | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2014 | 2.28 | 2.28 | 2.28 | 0.084 | 0 | (2.) | 2013 | 2.28 | 2.28 | 2.28 | 0.077 | 0 | (3.) | 2012 | 2.28 | 2.28 | 2.28 | 0.144 | 0 | (4.) | 2010 | 2.28 | 2.28 | 2.28 | 0.191 | 0 | (5.) | 2018 | 3.13 | 3.13 | 3.13 | 0.293 | 0 | (6.) | 2017 | 3.13 | 3.13 | 3.13 | 0.129 | 0 | (7.) | 2016 | 3.13 | 3.13 | 3.13 | 0.112 | 0 | (8.) | 2015 | 2.28 | 2.28 | 2.28 | 0.114 | 0 | (9.) | 2009 | 2.28 | 2.28 | 2.28 | 0.148 | 0 | (10.) | 2011 | 2.28 | 2.28 | 2.28 | 0.185 | 0 | (11.) | 2019 | 3.13 | 3.13 | 3.13 | 0.2738 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA071 | (ii)Name of the EIA Consultant | EPTRI (Environment protection training and researc | (iii)Address | EPTRI, 91/4, Gachibowli, hyderabad | (iv)Mobile No. | 9885236493 | (v)Landline No. | 0406756750 | (vi)Email Id | dgeptri@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 15 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The point wise reply for the ADS dated 29.01.2020 is enclosed for kind reference.
It is requested to grant Environmental Clearance for the Kakatiyakhani Opencast - III Coal Mining Project. | 03 Feb 2020 | 2. | ADS Raise Letter | please see the enclosed document for seeking additional document | 29 Jan 2020 | 3. | ADS Reply Letter | Sir,
Please find attached additional details sought vide minutes of 48th EAC meeting held on 4th Oct, 2019 pertaining to Kakatiya Opencast - III Coal Mining Project of SCCL for issue of EC. | 30 Oct 2019 | 4. | NA | Deferred | 14 Oct 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shri G Venkateswara Reddy | Designation | Director (Planning & Projects) | Name of Company (Applicant Name should not be given here) | The Singareni Collieries Company Limited | Address | Kothagudem P.O -507101
Khammam Dt |
|