Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kakatiya Khani Opencast-III project
(b)Name of the Company / Organisation The Singareni Collieries Company Limited
(c)Registered Address M/s. Singareni Collieries Company Limited PO: Kothagudem Collieries - 507 101 Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri G Venkateswara Reddy
(b)Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
(c)Address Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101
(d)Pin code 507101
(e)E-mail gm_env@scclmines.com
(f)STD Code. 8744(f)Telephone No. 243059
(g)Fax No. 08744244115
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/CMIN/113818/2018
(d)Master Proposal Number(Single Window) SW/113800/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 63,64,89,9,91,92,702,703,318/71 to 318/76, 318/84
(b)Pincode 506345
(c)Bounded Latitudes (North)
From
Degree 181940
Minutes
Second
From
Degree 182256
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 795242
Minutes
Second
From
Degree 795530
Minutes
Second
(e)Survey of India Topo Sheet No. 56 N/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 891.977
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/464/2012-IA-ll (M)
(c)Date of Issue of TOR 22 Apr 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 10 Aug 2019
(c)Date of Issue of EC 27 Apr 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0.500
Zilla praja parishad secondary school(ZPPSS)
State :Telangana
District :Warangal
Tehsil :Ghanpur (Mulug)
Village :Baswarajupalli
1800Major issues of environmental concerns that emerged during the Public hearing process are land acquisition, depletion of ground water, infrastructure development and employment.District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/2015-16/5/TL
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 22 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1336.64 ha31300006200003750000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)For Coal miningUG mine with 3.13 MTPA in 601.2 haUG cum OC 0.48 & 3.75MTPA in 1336.64haUG cum OC 0.48 & 3.75MTPA in 1336.64haNil
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Jul 2019
(iv)Valid Upto 31 Dec 2021
(v)File No. 190721981263
(vi)Application No. CFO1981263
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 413.84
(b) Funds Allocated for Environment Management (Capital) (in Crores) 18.303
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.32
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12285
(b)Existing quantity of raw material/fuel 225
(c)Total quantity of raw material/fuel 12510
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Explosives12510Tons per AnnumPurchasing from explosive companyRoad210 MoUCopy of Linkage
(2.)Power4.6OthersMVATS Transco sub-station Chelpur villageOthersThrough Over head HT line5 Fuel Supply AgreementCopy of Linkage
(3.)Diesel45655Kilo Litre per DayPurchasing from oil companiesRoad210 MoUCopy of Linkage
(4.)Water2801Kilo Litre per DayMVAFrom the project itselfOthersNot applicable0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube794877.6100
(2.)PM2.5Micro Gram per Meter Cube49.227.94860
(3.)SO2Micro Gram per Meter Cube19.68.119.680
(4.)NOxMicro Gram per Meter Cube25.111.124.380
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.66.56.58.58.5
(2.)Chloridesmg/l583652501000
(3.)Fluoridemg/l1.80.3211.01.5
(4.)TDSmg/l16903605002000
(5.)Heavy MetalsTotal chromium as Crmg/l0000
(6.)Total Hardnessmg/l905265200600
(7.)TSSNA0000
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.76.5A
(2.)BODmg/l32B
(3.)DOmg/l6.55.9B
(4.)CODmg/l2218A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.847.555
(2.)Leq(Night)A-weighted decibels(dB(A))42.435.145
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNo7.86.9
(2.)P(Phosphorus)Kilogram per hectare2216
(3.)Electric ConductivityOthersMmhos/cm0.4560.132
(4.)N(Nitrogen)Kilogram per hectare180158
(5.)K(Potassium)Kilogram per hectare514425
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.14 To 15.00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.10 To 13.20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater28010Copy of Permission LetterPipelineOthersPumping5855/Hg-II(1)/06-128 Jun 20066505
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine65050Settling ponds/ slow sand filtersOthersDischarge into neary by Streams/agriculture fields28013704
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 6505
(b)Total Discharged Water (Kilolitre per Day) 3704
(c)Total Reused Water (Kilolitre per Day) 2801
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OBOthersOver burden148125000Tons0OthersDumpers and trucksOthersStored as dumps
(2.)Top soilOthersTop soil1526400Tons0OthersDumpers and trucksOthersTemporary storage as dumps
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70032.8102.9250
(2.)PM2.5Microgram per Meter Cube45.8013.4459.3NS
(3.)NOxMicrogram per Meter Cube12.908.5921.5120
(4.)SO2Microgram per Meter Cube14.105.0719.2120
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4600
(b)Source TS Transco sub-station, Chelpur village.
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 737.28
(c)Government Land (ha.) 599.36
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1336.64
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1001.911
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 284.11
(d)Surface Water Bodies (ha.) 28.30
(e)Settlements (ha.) 17.31
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : roads 5.01
    Total (ha.) 1336.6409999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area678.21nil
(2.)OB Dump Area382.04nil
(3.)Safety Zone190.7nil
(4.)Built Up Area50.12Mine infrastructure and CHP
(5.)Water Reservoir25.89Nallah Diversion
(6.)OthersUndisturbed land9.68Undisturbed (Exclusive UG Area)
Total (ha.) 1336.64
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAnil0nil
(2.)ESAsnil0nil
(3.)Critically Polluted Areanil0nil
(4.)WLSnil0nil
(5.)Wildlife Corridorsnil0nil
(6.)ESZsnil0nil
(7.)Corridorsnil0nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnil0nil
(2.)Archaeological SitesRamappa Temple8.2Applied to NMA for issue of NoC, Issue of NOC is in process
(3.)ForestMulugu RF2out side the mine boundary
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 179.69
(b)Land yet to be acquired(Ha) 1147.27
(c)Status of Land acquisition if not acquired under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 5
(b)No. of Households 622
(c)No. of PDFs (Project Displaced Families) 728
(d)No. of PAFs (Project Affected Families) 86
(e)Funds Allocated for R&R(in INR) (in Lacs) 7004
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus Schedule –I but it common in occurrence. Conservation plan is in process
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area There are six seasonal tanks with in the core zone. A seasonal nallah, Gundla Vagu is flowing over the project area.
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required One seasonal nallah viz. Gundla Vagu passes over the proposed quarry area. Hence, diversion of Gundla Vagu is planned in Northwest and Southwest directions over Northwest property of the proposed quar
(ii)Details of Study Conducted Nil
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Drainage density is 3.49 km/sq. 169 ephemeral tanks, with a cumulative area of 32.67 sq.km. 10 seasonal water bodies for an area of 21.97 sq.km are chief source of irrigation.
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 8.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 365
(b)Permanent Employment-During Operation 1000
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 760
(e)No. of working days 365
(f)Total Manpower 2325
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt201013.051033.05
(2.)Percentage of Total Project Area1.4975.7977.28
(3.)No. of Plants5000025326252582625
(4.)Funds Allocated4.01374.99379
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialNew jobs will be created and financial status will be improved.
(2.)EnvironmentalIn the project area of 1336.64 ha an amount of 1033.05 ha will be reclaimed in stage wise by the end of the project.
(3.)SocialThe social infrastructure in terms of connectivity by road, communication, health, sanitation, community centers, education, financial institution will be improved.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 3.0 MTPA (3.75 MTPA Peak) OC and 0.48 MTPA UG
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. No. 38011/ 12/2017 -PCA
(b)Date of Approval 19 Nov 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 913.95
(f)Approved Capacity 3.75
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 120.37
(b)Mineable Reserves (Million Ton) 89.16
(c)Extractable Reserves(Million Ton) 77.45
(d)Percent(%) of Extraction 64.34
(e)Grade of Coal /Ore /Mineral G-8 (4920 Kcal/kg)
(f)Stripping Ratio 1 : 13.48
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Degree-I
(h)Average Gradient(Degree) 1 in 3.0
(i)Mining Method Mixed
(j)Life of Mine (Years) 31
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 16
(c)Thickness of seams to be worked on 13
(d)Maximum Thickness of Seams (metres) 0.17 to 4.0 m
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1336.64
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 17 Sep 2018
(iii)Validity of LOI 21
(iv)Reference No. of LOI 992/PR(A1)/2018
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 913.95
(iii)Validity of the lease deed From : 19 Jun 2009 To : 16 Sep 2039
(iv)Date of Execution of Mining Lese 19 Jun 2009
(v)Reference Number GO MS No. 146 I&C,GO MS No. 455 I&C,GO MS No. 114
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Validity not expired
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 10.6
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 10.6
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 211.62 (hectare) at a Depth of 300 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 678.21
13.
Details of Transportation:
(a)In Pit/Underground to Surface OC-Dumpers/ UG - Haulage
(b)Surface to Siding/Loading Trucks
(c)Transportation / Conveyor Details By road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)OTHERS(Specify)Nallah and roads8.20.548.74
(2.)SURFACE WATER BODIES10.5117.7928.3
(3.)GRAZING LAND254.1326.25280.38
(4.)WASTE LAND000
(5.)SETTLEMENTS11.286.0317.31
(6.)AGRICULTURE LAND629.83372.081001.91
(7.)FOREST LAND000
TOTAL913.95422.691336.64
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS382.0400382.04
(2.)BUILT UP AREA (COLONY/OFFICE)38.710.3211.0950.12
(3.)VIRGIN AREA009.689.68
(4.)OtherSafe barrier and nallah diversion148.4628.5739.56216.59
(5.)TOP SOIL STORAGE0000
(6.)INTERNAL OB DUMPS463.842.750466.59
(7.)ROADS0000
(8.)GREEN BELT0000
(9.)EXCAVATION/QUARRY0211.620211.62
TOTAL1033.05243.2660.3301336.64
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan
Total Area Excavated (in hectare)
Total Area Backfilled after Excavation (in hectare)
Total Area Reclaimed (in hectare)
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20142.282.282.280.0840
(2.)20132.282.282.280.0770
(3.)20122.282.282.280.1440
(4.)20102.282.282.280.1910
(5.)20183.133.133.130.2930
(6.)20173.133.133.130.1290
(7.)20163.133.133.130.1120
(8.)20152.282.282.280.1140
(9.)20092.282.282.280.1480
(10.)20112.282.282.280.1850
(11.)20193.133.133.130.27380
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA071
(ii)Name of the EIA Consultant EPTRI (Environment protection training and researc
(iii)Address EPTRI, 91/4, Gachibowli, hyderabad
(iv)Mobile No. 9885236493
(v)Landline No. 0406756750
(vi)Email Id dgeptri@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe point wise reply for the ADS dated 29.01.2020 is enclosed for kind reference. It is requested to grant Environmental Clearance for the Kakatiyakhani Opencast - III Coal Mining Project. 03 Feb 2020
2. ADS Raise Letterplease see the enclosed document for seeking additional document 29 Jan 2020
3. ADS Reply LetterSir, Please find attached additional details sought vide minutes of 48th EAC meeting held on 4th Oct, 2019 pertaining to Kakatiya Opencast - III Coal Mining Project of SCCL for issue of EC. 30 Oct 2019
4.NADeferred 14 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri G Venkateswara Reddy
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt
Print