1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Chintalayapalle Limestone Mine - The Ramco Cements Limited (Formerly Madras Cements Limited) | (b)Name of the Company / Organisation | THE RAMCO CEMENTS LIMITED | (c)Registered Address | THE RAMCO CEMENTS LIMITED
(Formerly known as Madras Cements Ltd)
Auras Corporate Centre
98-A Dr. ,THE RAMCO CEMENTS LIMITED
(Formerly known as Madras Cements Ltd)
Auras Corporate Centre
98-A Dr. ,Chennai,Tamil Nadu-521457 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Reddy Nagaraju Reddy | (b)Designation (Owner/ Partner/ CEO) | President (Projects) | (c)Address | The Ramco Cements Limited
(Formerly Madras Cements Limited)
Kalvatala project, Kolimigundla Mandal Nandyal District (Erstwhile Kurnool Dist)
Andhra Pradesh
Pin code:518 123,The ramco cements limited,,Krishna,Andhra Pradesh-521457 | (d)Pin code | 521457 | (e)E-mail | mcljpmqc@gmail.com | (f)STD Code. | 865(f)Telephone No. | 224400 | (g)Fax No. | 08654222352 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/MIN/62749/2017 | (d)Master Proposal Number(Single Window) | SW/113799/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 2,3,5,6,7,8,9,10,11/1,11/2,12,13,14,15,23,24/1,24/ | (b)Pincode | 518123 | (c)Bounded Latitudes (North) | | From | | Degree | 1662826.52 | Minutes | | Second | | From | | Degree | 1665213.92 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 187147.41 | Minutes | | Second | | From | | Degree | 190146.08 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57 I/4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 306 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Andhra Pradesh | Kurnool | Kolimigundla | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/15/2017-IA-II(M) | (b)Date of Apply of TOR | 23 Feb 2017 | (c)Date of Issue of TOR / Standard ToR | 01 Jan 1900 | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Mining lease Area | State : | Andhra Pradesh | District : | Kurnool | Tehsil : | Kolimigundla | Village : | Chintalayapalle |
| 500 | 1. Provide employment opportunities to locals
2. Construct good hospital in the area
3. Drinking water facilities in the surrounding villages
4. Additional compensation to the farmers at the earlie | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 4.0 MTPA Limestone Mining | Opencast Method | - | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 4.0 | Others | MTPA | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10.75 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.8 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.52 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.32 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | EXPLOSIVE | 476 | Tons per Annum | | local | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 59.3 | 43.6 | 58.9 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 13.7 | 8.2 | 13.0 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 15.1 | 9.2 | 14.4 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 28.2 | 17.9 | 28.0 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 1406 | 682 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 585 | 319 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 0.96 | 0.69 | 1 | 1.5 | (5.) | Chlorides | | | mg/l | | 328 | 36 | 250 | 1000 | (6.) | pH | | | NA | | 7.35 | 6.85 | 6.5 | 8.5 | (7.) | Heavy Metals | | Zinc | mg/l | | 0.18 | 0.02 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.72 | 0 | C | (2.) | DO | | mg/l | | 5.2 | 0 | C | (3.) | COD | | mg/l | | 10 | 0 | C | (4.) | BOD | | mg/l | | 2 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.7 | 50.6 | 55 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 44.7 | 41.8 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 491 | 270 | (2.) | K(Potassium) | Kilogram per hectare | | 1070 | 241 | (3.) | pH | | | 8.02 | 6.97 | (4.) | P(Phosphorus) | Kilogram per hectare | | 310 | 13 | (5.) | Electric Conductivity | Others | Microsiemens per centimeter | 689 | 143 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 45 To 50 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 45 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Cement Plant and later Mine pit | 150 | 3.7 | Copy of Permission Letter | modeOthers | Mobile water tankers | Others | Mobile water tankers | None | 08 Aug 2019 | 150 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 8 | 8 | Septic tank followed by soak pit | Others | Septic tank followed by soak pit | 0 | 8 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 8 | (b)Total Discharged Water (Kilolitre per Day) | 8 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | No waste generation | Others | No waste generation | 0 | Tons | 0 | Others | None | Others | No waste generation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 12.12 | 4.5 | 2.36 | 15.16 | 80 | (2.) | NOx | | Microgram per Meter Cube | 14.21 | 4.2 | 14.26 | 28.66 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 28.11 | 0 | 1.22 | 29.35 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 58.9 | 0 | 11.64 | 70.54 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | None | None | 0 | 0 | Others | None | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 800 | (b)Source | For the mines lighting, portable generator sets wi | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | For the mines lighting, portable generator sets wi | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 449.35 | (c)Government Land (ha.) | 42.20 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 491.55 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 42.20 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Agricultural non irrigated land | 449.35 | Total (ha.) | 491.55 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 51.69 | Life of Mine | (2.) | Quarry Area | | 437.35 | Life of Mine | (3.) | Others | Un mined area | 2.51 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | - | (2.) | ESAs | None | 0 | - | (3.) | ESZs | None | 0 | - | (4.) | WLS | None | 0 | - | (5.) | NPA | None | 0 | - | (6.) | Corridors | None | 0 | - | (7.) | Wildlife Corridors | None | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Dhodiyam RF | 8.4 | SE | (2.) | Archaeological Sites | | Belum Caves | 6.6 | NNE | (3.) | Defence Installations | | None | 0 | - | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 411.271 | (b)Land yet to be acquired(Ha) | 38.079 | (c)Status of Land acquisition if not acquired | Under Process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Blackbuck, Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 165 Lakhs | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | RC. No.9968/2018/WL-2 | (iii)Date of issue | 15 Jul 2019 | (iv)Recommendation | Conservation measures are recommended | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Mada Vagu - 3.0KM - NE Pedda Vanka – 5.0 km – NW | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 3.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 120 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 120 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 51.69 | (b)Percentage of Total Project Area | 10.52 | (c)No. of Plants to be Planted | 77535 | (d)Funds Allocated for Plantation | 2600000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Direct and indirect employment will be provided | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 4.166 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | AP/KNL/MP/LST-51/HYD | (b)Date of Approval | 15 Jun 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 491.55 | (f)Approved Capacity | 4.0 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 144.079 | (b)Mineable Reserves (Million Ton) | 144.079 | (c)Extractable Reserves(Million Ton) | 144.079 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Cement Grade | (f)Stripping Ratio | 1 : 0.067 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 5 - 7 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 36 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 491.55 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 15 Feb 2000 | (iii)Validity of LOI | 50 | (iv)Reference No. of LOI | GO Ms. No. 4 dated 03.01.2019 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 491.55 | (iii)Validity of the lease deed | From : 15 Feb 2000 To : 08 Aug 2050 | (iv)Date of Execution of Mining Lese | 26 Mar 2019 | (v)Reference Number | Proceedings no. 1333/M4/2000 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | valid up to 2050 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 6.114 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 6.114 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 437.35 | (b)Depth (in meter) | 29 | (c)Volume (in Million Cubic meter) | 126.831 | |
|
12. | Details of Quarry: | (a)Final Void of 437.35 (hectare) at a Depth of 29 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 491.55 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | BY ROAD | (b)Surface to Siding/Loading | By road up to crusher | (c)Transportation / Conveyor Details | BY ROAD | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 42.20 | 0 | 42.2 | (2.) | AGRICULTURE LAND | | 0 | 0 | 0 | (3.) | OTHERS(Specify) | Private Non Irrigated Agricultural land | 449.35 | 0 | 449.35 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | (7.) | FOREST LAND | | 0 | 0 | 0 | |
TOTAL | 491.55 | 0 | 491.55 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 437.35 | 0 | | 437.35 | (2.) | VIRGIN AREA | | 0 | 0 | 2.51 | | 2.51 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (5.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | GREEN BELT | | 51.69 | 0 | 0 | | 51.69 | (7.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (8.) | ROADS | | 0 | 0 | 0 | | 0 | |
TOTAL | 51.69 | 437.35 | 2.51 | 0 | 491.55 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 491.55 | (d)Safety Zone(in hectare) | 51.69 | (e)Final Void of 437.35 (hectare) at a Depth of 29 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 51.69 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA 064 | (ii)Name of the EIA Consultant | B.S. Envi – Tech Pvt. Ltd | (iii)Address | B. S. Envi-Tech Pvt Ltd., Amity Ville, 12-13-1270/71/73, 4th Floor, St. Ann's School Road, Tarnaka, Secunderabad | (iv)Mobile No. | 9848053012 | (v)Landline No. | 0404978306 | (vi)Email Id | info@bsenvitech.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 12 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Reddy Nagaraju Reddy | Designation | President (Projects) | Name of Company (Applicant Name should not be given here) | THE RAMCO CEMENTS LIMITED | Address | THE RAMCO CEMENTS LIMITED
(Formerly known as Madras Cements Ltd)
Auras Corporate Centre
98-A Dr. |
|