1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Establishment of pesticide specific intermediate and synthetic organic chemicals manufacturing Facility by Deepak Nitrite Limited Plot No 53A, MIDC Roha, Dist- Raigad, Maharashtra
(b)Name of the Company / Organisation DEEPAK NITRITE LIMITED
(c)Registered Address PLOT NO 53 A ROHA MIDC AREA,Plot No 53A, Roha MIDC area,Raigad,Maharashtra-402116
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Praveen Desai
(b)Designation (Owner/ Partner/ CEO) sitehead
(c)Address Plot No 53A, Roha MIDC Area,,Roha,Raigad,Maharashtra-402116
(d)Pin code 402116
(e)E-mail pdesai@deepaknitrite.com
(f)STD Code. 2194(f)Telephone No. 263550
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/MH/IND2/90992/2019
(d)Master Proposal Number(Single Window) SW/113691/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot 53A, MIDC Roha
(b)Pincode 402116
(c)Bounded Latitudes (North)
From
Degree 18.25
Minutes
Second
From
Degree 18.25
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.9
Minutes
Second
From
Degree 73.9
Minutes
Second
(e)Survey of India Topo Sheet No. E43H2 E43H3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 12
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadRoha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/17/2019-IA-II(I)
(b)Date of Apply of TOR 24 Jan 2019
(c)Date of Issue of TOR / Standard ToR 26 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project located in notified MIDC.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactor Boiler ETPRefer EIA reportProposed project
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)SMIA (2-Furanacetic acid, a-(methoxyimino)-, ammonium salt)600Tons per AnnumRoad
(2.)7-ETP (7-Ethyl tryptophol) Etodolac intermediate S-Alcohol (Duloxetine Intermediate)/ 2-Methyl-3-Amino Benzotrifluoride (MTA)2000Tons per AnnumRoad
(3.)Triazinone & or Thiocarbohydrazide4500Tons per AnnumRoad
(4.)ADENINE (6- Amino Purine)/ 3-NAP (3 Nitro acetophenone)/ 3-AAP (3 Amino acetophenone)/ 3-HAP (3 Hydroxy acetophenone)/ 2,3-Xylenol/ 2,4-Xylenol/ 2,5-Xylenol/ Phenyl Hydrazine2000Tons per AnnumRoad
(5.)DBTZ (Quetiapine Int.)/ (Dibenzo[b,f][1,4]thiazepine-11(10H)- one) / Guanine/ Aciclovir PMPA (TENOFOVIR) ((R)-9-[2-Phosphonomethoxy) propyl] adenine)2000Tons per AnnumRoad
(6.)Omeprazole Chloro Intermediate (2-Chloromethyl-3,5-Dimethyl-4-methoxy pyridine hydrochloride)/ Omeprazole Nitro Intermediate (2,3,5-trimethyl-4-nitropyridine N-oxide)2000Tons per AnnumRoad
(7.)3-ABTF ( 3 Amino benzotrifluoride)/ TFMAP (3-Triflouromethyl Acetophenone)2000Tons per AnnumRoad
(8.)Pilot Plant products (Synthetic Organic Chemicals)240Tons per AnnumRoad
(9.)Distillation of crude Chemicals/solvents such as Nitroxylenes, Nitrocumens, crude Toluene, Crude benzotrifluoride, Crude Methanol etc, Spent acid recovery, Formamide recovery1200Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 06 Aug 2019
(iv)Valid Upto 07 Aug 2019
(v)File No. Not applicable
(vi)Application No. Proposed project is new project
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.37
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 19923
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 19923
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)RM19923OthersTon per Monthnearby sourceRoad100 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube0.440.20.4402
(2.)PM2.5Micro Gram per Meter Cube37.529.437.460
(3.)SO2Micro Gram per Meter Cube18.511.61880
(4.)NOxMicro Gram per Meter Cube32.819.532.580
(5.)PM10Micro Gram per Meter Cube79.261.278.7100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l9090500500
(3.)Fluoridemg/l0011
(4.)OthersCalciummg/l20207575
(5.)Chloridesmg/l2424250250
(6.)Heavy MetalsManganesemg/l000.10.1
(7.)pHNA6.626.628.58.5
(8.)Total Hardnessmg/l7474200200
    14.3.     No. of Surface Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l88E
(2.)OthersTDSmg/l7070E
(3.)pHNA7.567.56E
(4.)CODmg/l00E
(5.)DOmg/l6.16.1E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))61.461.470
(2.)Leq(Day)A-weighted decibels(dB(A))67.167.175
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare10201020
(2.)K(Potassium)Kilogram per hectare8282
(3.)Electric ConductivityMillisiemens per Centimetre830.3830.3
(4.)pH7.17.1
(5.)P(Phosphorus)Kilogram per hectare19.319.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.95 To 7.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.1 To 4.05
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC17560 Not Appliacble PipelineOthersBy MIDC PipelineSWC/18/530/20190524/63471224 May 20191756
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent9671000ETP, Stripper, MEEOthersCETP discharge30937
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 967
(b)Total Discharged Water (Kilolitre per Day) 937
(c)Total Reused Water (Kilolitre per Day) 30
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Boiler ashBottom Ash2664Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Glass ware / Broken Discarded GlassMunicipal Solid Waste1Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Rubber handgloves, PVC shoes, paper bags wasteMunicipal Solid Waste2Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)HyflowHazardous Waste (as per Hazardous and Other Waste Management rules 2016)127.8Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Iron sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)766.8Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Charcoal sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)174.4Tons0RoadCo-Processing
(7.)ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)654.3Tons0RoadCo-Processing
(8.)Used or spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.8Tons0RoadAuthorized Recyclers
(9.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10800Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(10.)Empty barrels, containers, linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons0RoadOthersSale to scrap vendors
(11.)Process waste organicHazardous Waste (as per Hazardous and Other Waste Management rules 2016)799.3Tons0RoadCo-Processing
(12.)Waste or residue containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.04Tons0RoadAuthorized Recyclers
(13.)Insulating MaterialIndustrial Waste2Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(14.)Spent catalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)63.8Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube71.32.10.371.7100
(2.)SO2Microgram per Meter Cube15.32.14.3319.6480
(3.)NOxMicrogram per Meter Cube21.62.11.6227.7380
(4.)PM2.5Microgram per Meter Cube37.50037.660
(5.)Others(Specify)NANA0000.10
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set 1000 KVAHSD- 200 Lit/ Hr6.51.15PM10TPM < 50
(2.)DG set 1000 KVAHSD- 200 Lit/ Hr6.51.15PM10TPM < 50
(3.)20 TPH BoilerCoal- 80 TPD471.2PM10TPM < 50
(4.)DG set 1000 KVAHSD- 200 Lit/ Hr6.51.15PM10TPM < 50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5000
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 nos. of 1000 KVA
(e)Stack Height (in m) 47
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.0224
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.0224
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 9325.85
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 419.215
(e)Settlements (ha.) 81.7575
(f)Industrial (ha.) 219.09
(g)Forest (ha.) 10276
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Rural area 101.445
    Total (ha.) 20423.357500000002
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.6767
(2.)OthersBuilt up area0.9043
Total (ha.) 1.581
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsDhatav as per Draft Western ghat notification1.5as per Draft Western ghat notification
(2.)Critically Polluted AreaNA0NA
(3.)WLSNA0NA
(4.)NPANA0NA
(5.)ESZsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNANA0NA
(2.)ForestReserve forest1.5Reserve forest
(3.)Archaeological SitesAvchitgad Fort6.46Notified
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kundalika river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 6
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.6767
(b)Percentage of Total Project Area 33.46
(c)No. of Plants to be Planted 1015
(d)Funds Allocated for Plantation 10
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialSocial upliftment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/1720/RA 0117 rev 01
(ii)Name of the EIA Consultant Aditya Environmental Services Pvt Ltd
(iii)Address 107, Hiren Light Industrial Estate, Mahim west
(iv)Mobile No. 9821513367
(v)Landline No. 0224212750
(vi)Email Id rajiv@aespl.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 24 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAEarlier some observations were made (10/1/2019, 18/1/2019 & 21/1/2019) on the same proposal No.IA/MH/IND2/90092/2019. What is the status of said proposal, and how the present proposal is different from that. The matter may be discussed with us in the Ministry to take the proposal forward. 05 Sep 2019
2.NAThe correction have been made as per the instruction received 09 Sep 2019
3.NAThe matter discussed with Shailesh Raval, representative of the M/s Deepak Nitrite and explained the requirement. You are requested to clarify the following: There was similar proposals submitted by you earlier. You are requested to explain how it is different from the earlier proposal Justify the product proposed covered under item 5(b) of the schedule 21 Oct 2019
4.NAThe correction have been made as per the instruction received 23 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPraveen Desai
Designationsitehead
Name of Company (Applicant Name should not be given here)DEEPAK NITRITE LIMITED
AddressPLOT NO 53 A ROHA MIDC AREA
Print