Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Exploration of oil and gas from 134 wells in 32 ML blocks in Vadodara, Kheda, Anand, Ahmedabad, Gandhinagar, Mehsana, & Sabarkantha districts, Gujarat
(b)Name of the Company / Organisation OIL AND NATURAL GAS CORPORATION LIMITED
(c)Registered Address Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj,,South West,Delhi-110070
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajeeva Kumar
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj,,Vasant Vihar,Ramanathapuram,Tamil Nadu-110070
(d)Pin code 110070
(e)E-mail head_env@ongc.co.in
(f)STD Code. 11(f)Telephone No. 26753163
(g)Fax No. 01126129067
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/69699/2017
(d)Master Proposal Number(Single Window) SW/113606/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Vadodara, Kheda, Anand, Ahmedabad, Gandhinagar, Me
(b)Pincode 384002
(c)Bounded Latitudes (North)
From
Degree 22.1727
Minutes
Second
From
Degree 23.4486
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.2500
Minutes
Second
From
Degree 73.0286
Minutes
Second
(e)Survey of India Topo Sheet No. 46B-9, 46B-10, 46B-11, 46B-13, 46B-14, 46B-15, 46B
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 103
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadAhmedabad City
(2.)GujaratMahesanaSatlasana
(3.)GujaratMahesanaKheralu
(4.)GujaratMahesanaUnjha
(5.)GujaratMahesanaVisnagar
(6.)GujaratMahesanaVadnagar
(7.)GujaratMahesanaVijapur
(8.)GujaratMahesanaBecharaji
(9.)GujaratMahesanaKadi
(10.)GujaratSabar KanthaKhedbrahma
(11.)GujaratSabar KanthaVijaynagar
(12.)GujaratSabar KanthaVadali
(13.)GujaratSabar KanthaIdar
(14.)GujaratSabar KanthaHimatnagar
(15.)GujaratSabar KanthaPrantij
(16.)GujaratSabar KanthaTalod
(17.)GujaratGandhinagarKalol
(18.)GujaratGandhinagarMansa
(19.)GujaratGandhinagarGandhinagar
(20.)GujaratGandhinagarDehgam
(21.)GujaratAhmedabadMandal
(22.)GujaratAhmedabadDetroj-Rampura
(23.)GujaratAhmedabadViramgam
(24.)GujaratAhmedabadSanand
(25.)GujaratAhmedabadDaskroi
(26.)GujaratAhmedabadDholka
(27.)GujaratAhmedabadBavla
(28.)GujaratAhmedabadDhandhuka
(29.)GujaratAnandTarapur
(30.)GujaratAnandSojitra
(31.)GujaratAnandUmreth
(32.)GujaratAnandAnand
(33.)GujaratAnandPetlad
(34.)GujaratAnandKhambhat
(35.)GujaratAnandBorsad
(36.)GujaratAnandAnklav
(37.)GujaratKhedaKapadvanj
(38.)GujaratKhedaKathlal
(39.)GujaratKhedaMehmedabad
(40.)GujaratKhedaKheda
(41.)GujaratKhedaMatar
(42.)GujaratKhedaNadiad
(43.)GujaratKhedaMahudha
(44.)GujaratKhedaThasra
(45.)GujaratPanchmahalKalolMadhvas
(46.)GujaratVadodaraSavli
(47.)GujaratVadodaraVadodara
(48.)GujaratVadodaraVaghodia
(49.)GujaratVadodaraDabhoi
(50.)GujaratVadodaraPadra
(51.)GujaratVadodaraKarjan
(52.)GujaratVadodaraSinor
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/485/2017-IA-II(I)
(b)Date of Apply of TOR 25 Sep 2017
(c)Date of Issue of TOR / Standard ToR 06 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
Ekta Banquet, Samarkha Crossing, National Highway No. 8
State :Gujarat
District :Anand
Tehsil :Anand
Village :Samarkha
39No. of wells to be drilled, compensationOthersAdditional District Magistrate
(2.)
Date of Advertisement :26 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
Patel Champaben ratilal Town Hall
State :Gujarat
District :Mahesana
Tehsil :Kadi
Village :Kadi
78Compensation, local employmentOthersAdditional District Magistrate
(3.)
Date of Advertisement :14 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
Shree Bharhamani Mataji Patidar Vadi
State :Gujarat
District :Gandhinagar
Tehsil :Kalol
Village :Navu Gam, Dingucha
44Compensation, road repair, Requirement of development works, CSR issuesDistrict Collector
(4.)
Date of Advertisement :12 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
IPCO wala Hall, Nr. Paras Circle
State :Gujarat
District :Kheda
Tehsil :Nadiad
Village :Nadiad
26Propoer road constructionOthersAdditional District Magistrate
(5.)
Date of Advertisement :11 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :5
Pramukh Swami Town Hall, PP Shroff Compound, Station Road
State :Gujarat
District :Vadodara
Tehsil :Padra
Village :Padra
24CSR issues, location of proposed drilling wells, local employmentOthersAdditional District Magistrate
(6.)
Date of Advertisement :11 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
Community Hall of Majara Milk Manufacture Co-operative Society
State :Gujarat
District :Sabar Kantha
Tehsil :Prantij
Village :Majara
30Construction of road, Local employmentOthersAdditional District Magistrate
(7.)
Date of Advertisement :27 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
Sanand Nagarpalika Hall
State :Gujarat
District :Ahmedabad
Tehsil :Sanand
Village :Sanand
14Compensation, CSR issuesOthersAdditional District Magistrate
(8.)
Date of Advertisement :27 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :5
Sanand Nagarpalika Hall
State :Gujarat
District :Ahmedabad
Tehsil :Sanand
Village :Sanand
14Compenstion, CSR issuesOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Onland wells134 ONLAND WELLS
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Onland Wells134OthersNumberOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1447
(b) Funds Allocated for Environment Management (Capital) (in Crores) 95.10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.6175
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 17.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel3Kilo Litre per DayOpen MarketOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Dec 2018 To 25 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 67
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube39133260
(2.)PM10Micro Gram per Meter Cube774775100
(3.)SO2Micro Gram per Meter Cube73.75780
(4.)NOxMicro Gram per Meter Cube221021.780
    14.2.     No. of Ground Water monitoring locations : 45
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l60080300600
(2.)Heavy MetalsMercurymg/l0.0010.0010.0010.001
(3.)TSSmg/l1111
(4.)pHNA8.56.96.58.5
(5.)Chloridesmg/l754682501000
(6.)TDSmg/l19922445002000
(7.)Fluoridemg/l1.810.111.5
    14.3.     No. of Surface Water monitoring locations : 38
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l329D
(2.)DOmg/l7.53C
(3.)pHNA8.57.08A
(4.)BODmg/l153D
    14.4.     No. of Ambient Noise monitoring locations : 97
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.451.755
(2.)Leq(Night)A-weighted decibels(dB(A))46.541.245
    14.5.     No. of Soil Sample Monitored locations : 36
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare42.515.4
(2.)pH8.436.2
(3.)N(Nitrogen)Kilogram per hectare1158.5386.2
(4.)K(Potassium)Kilogram per hectare828.889.4
(5.)Electric ConductivityMillisiemens per Centimetre1.120.137
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.15 To 42.10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 38.96
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNearest ONGC installation250 Not Appliacble modeOthersTANKERSOthersNANA06 Nov 201725
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Wash wastewater33Solar evaporatedOthersHDPE LINED PIT30
(2.)Domestic11Soak PitOthersSoak Pit10
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill CuttingsOthersDrill Cuttings500Tons0OthersNAOthersAT SITE IN HDPE LINED PIT
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube660.10.2366.3100
(2.)NOxMicrogram per Meter Cube16.70.15.0921.880
(3.)PM2.5Microgram per Meter Cube230.10.0823.0980
(4.)SO2Microgram per Meter Cube5.80.10.236.0480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD120.2SO20.003 g/s
(2.)DG SetHSD120.2PM100.003 g/s
(3.)DG SetHSD120.2NOx0.066 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1250
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 163
    Total Land (ha.) 163
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 703189.80
(b)Waste/Barren Land (ha.) 57382.53
(c)Grazing/ Community Land (ha.) 130918
(d)Surface Water Bodies (ha.) 47126
(e)Settlements (ha.) 67819
(f)Industrial (ha.) 15608
(g)Forest (ha.) 2751
(h)Mangroves (ha.) 1024.17
(i)Marine Area (ha.) 0
(j)Others (ha.) : Salt Pan 2488.39
    Total (ha.) 1028306.8900000001
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersEach drill site1.21Each drill site
Total (ha.) 1.21
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSThol Lake Bird Sanctuary4.5Located within the block area
(2.)NPANA0NA
(3.)Critically Polluted AreaVadodara Vatva2Within the block
(4.)CorridorsNA0NA
(5.)ESZsThol Lake Bird Sanctuary4.5Located within the block area
(6.)ESAsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesArchaeological sites are present within the blocks2.5Archaeological sites are present within the blocks
(2.)ForestNA0NA
(3.)Defence InstallationsDefence installations present within the blocks2.5Defence installations present within the blocks
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 163
(c)Status of Land acquisition if not acquired Land yet to be acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sabarmati, Khari, Vatrak, Meshwo, Shedi, Mahi and Vishwamitri river and Narmada main canal are passing through the block area
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sabarmati, Khari, Vatrak, Meshwo, Shedi, Mahi and Vishwamitri river and Narmada main canal are passing through the block area
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 30
(e)No. of working days 120
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialReduction in oil imports
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0042
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura
(iv)Mobile No. 9824034709
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify/inform/submit the following:- - Present NABET accreditation status of the Consultant, - Layout map of the project area showing all 32 ML Blocks and 134 location of wells, - Whether EC was earlier obtained for exploration in any of the 32 ML Blocks. If yes, details thereof, - Land acquisition status for 163 ha of land required for the project, - In view of the project site at 4.5 km from Thol Lake Bird Sanctuary, status of wildlife clearance from the Standing Committee of NBWL - Permissions required from the concerned regulatory authorities for the said archaeological sites and defence installations, 05 Sep 2019
2.NAThe correction have been made as per the instruction received 06 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeeva Kumar
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)OIL AND NATURAL GAS CORPORATION LIMITED
AddressDeendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj
Print