Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Capacity Enhancement and Expansion Of Nylon - 6 Chips
(b)Name of the Company / Organisation GUJARAT STATE FERTILIZERS AND CHEMICALS LTD
(c)Registered Address P.O. Fertilizernagar, Tal & District: Vadodara,,Vadodara,Gujarat-391750
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S J Parikh
(b)Designation (Owner/ Partner/ CEO) SVP
(c)Address P.O Fertilizernagar, Taluka and District Vadodara,,Vadodara,Vadodara,Gujarat-391750
(d)Pin code 391750
(e)E-mail sjparikh@gsfcltd.com
(f)STD Code. 265(f)Telephone No. 3092907
(g)Fax No. 02652240966
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(e) Petrochemical based processing (processes other than cracking &
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/113461/2011
(d)Master Proposal Number(Single Window) SW/113455/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Fertilizer Nagar, Tal. & Dist. Vadodara, Gujarat
(b)Pincode 391750
(c)Bounded Latitudes (North)
From
Degree 22.37442222
Minutes
Second
From
Degree 22.374697
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.151089
Minutes
Second
From
Degree 73.151312
Minutes
Second
(e)Survey of India Topo Sheet No. F43H3/F43H7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 42
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/EC/5(e)/131/2013
(b)Date of Apply of TOR 20 Nov 2011
(c)Date of Issue of TOR / Standard ToR 05 Dec 2011
(d)Date of Apply of EC 09 Oct 2012
(e)Date of Issue of EC 05 Jul 2013
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Projects falls under GIDC Notified area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-193/2008(ENV)/492
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 17 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Urea-I1032000103200Tons per Annum(TPA)Road,OthersInternal
(2.)Phosphogypsam(Byproduct)2532600253260Tons per Annum(TPA)RoadInternal
(3.)MEK Oxime650006500Tons per Annum(TPA)RoadInternal
(4.)Micro nutrient Mixture54054Tons per Annum(TPA)RoadInternal
(5.)Melamine-I500005000Tons per Annum(TPA)Road,OthersInternal
(6.)Sulfuric Acid-III1320000132000Tons per Annum(TPA)OthersInternal
(7.)Ammonium Sulphate(By-Product-Capro I)80000080000Tons per Annum(TPA)RoadInternal
(8.)Urea Phosphate150001500Tons per Annum(TPA)RoadInternal
(9.)Cogeneration-II(Power)25025Mega Watt(MW)OthersInternal
(10.)Cogeneration-II(Steam)1300130OthersMT/HrOthersInternal
(11.)Ammonia-III33000033000Tons per Annum(TPA)OthersInternal
(12.)Argon320000003200000Tons per Annum(TPA)OthersInternal
(13.)Caprolactam-I20000020000Tons per Annum(TPA)OthersInternal
(14.)HAS Crystal120001200Tons per Annum(TPA)OthersInternal
(15.)Melamine-II10000010000Tons per Annum(TPA)Road,OthersInternal
(16.)Ammonium Sulphate(By product Capro II)1160000116000Tons per Annum(TPA)RoadInternal
(17.)Nitric Acid (By-Product-Capro II)830008300Tons per Annum(TPA)OthersInternal
(18.)Phosphoric Acid54000054000Tons per Annum(TPA)OthersInternal
(19.)WSF-MAP/MKP/KNO3/SOP10800010800Tons per Annum(TPA)RoadInternal
(20.)Ammonia-IV4500000450000Tons per Annum(TPA)OthersInternal
(21.)Urea-II2640000264000Tons per Annum(TPA)Road,OthersInternal
(22.)DAP/ASP/MAP/NPK2160000216000Tons per Annum(TPA)RoadInternal
(23.)Caprolactam-II50000050000Tons per Annum(TPA)OthersInternal
(24.)Sulfuric Acid-IV4455000445500Tons per Annum(TPA)OthersInternal
(25.)Metanol1916250191625Tons per Annum(TPA)Road,OthersInternal
(26.)Nylon-6 Chips244252082045245Tons per Annum(TPA)RoadInternal
(27.)WSF-NPK 19:19:1921600021600Tons per Annum(TPA)RoadInternal
(28.)Cogeneration-I(Power)15015Mega Watt(MW)OthersInternal
(29.)Cogeneration-I(Steam)1300130OthersMT/HrOthersInternal
(30.)Cogeneration-III(Power)50050Mega Watt(MW)OthersInternal
(31.)Cogeneration-III(Steam)1300130OthersMT/HrOthersInternal
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)----------
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Jun 2016
(iv)Valid Upto 31 Dec 2021
(v)File No. AWH-78404
(vi)Application No. AWH-78404
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.0025
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.0005
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20840.8
(b)Existing quantity of raw material/fuel 25228.8
(c)Total quantity of raw material/fuel 46069.6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Nylon-615721Tons per AnnumIndigenousRoad10 Open MarketCopy of Linkage
(2.)Caprolactam27899.6Tons per AnnumIn-houseOthersPipeline2 LinkageCopy of Linkage
(3.)solid Additives257.8Tons per AnnumIndigenousRoad10 Open MarketCopy of Linkage
(4.)Pigment31.95Tons per AnnumIndigenousRoad10 Open MarketCopy of Linkage
(5.)liquid Additives41.3Tons per AnnumIndigenousRoad10 Open MarketCopy of Linkage
(6.)Glass Fibber2118Tons per AnnumIndigenousRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube86.262.784.816100
(2.)PM2.5Micro Gram per Meter Cube46.232.146.0660
(3.)OthersNH3Micro Gram per Meter Cube2.912.78400
(4.)SO2Micro Gram per Meter Cube16.88.516.53480
(5.)NOxMicro Gram per Meter Cube20.813.720.6380
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l2200
(2.)Fluoridemg/l0.70.411.5
(3.)Heavy MetalsIronmg/l0.330.140.30
(4.)OthersTurbidityOthersNTU2.4115
(5.)pHNA8.156.7277
(6.)TDSmg/l12085745002000
(7.)Chloridesmg/l2741552501000
(8.)Total Hardnessmg/l732258200600
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.086.81C
(2.)CODmg/l1812C
(3.)OthersTDSmg/l1112358C
(4.)DOmg/l54.6C
(5.)BODmg/l87C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))77.339.270
(2.)Leq(Day)A-weighted decibels(dB(A))82.745.175
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.227.42
(2.)P(Phosphorus)Milliequivalents per 100 Gram27.24.12
(3.)N(Nitrogen)Percent0.0950.07
(4.)K(Potassium)Milliequivalents per 100 Gram1.20.6
(5.)Electric ConductivityOthersds/m1.40.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 12
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface32087.958.6Copy of Permission LetterPipelineOthersFrench WellsVID/PB-2/IND/D.W.REQ.QTY/GSFC/40826 Mar 2019318220
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process2634.42080ETPReuse within the Plant & Recycling,OthersTo Vadodara Effluent Channel Limited (VECL)6801954.4
(2.)Utilities9109.80Sent directly to Effluent ChannelReuse within the Plant & Recycling,OthersSent to Vadodara Effluent Channel Limited (VECL)20007109.8
(3.)Domestic4917.50Soak Pit/VECLOthersSoak Pit/VECL04917.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 16661.7
(b)Total Discharged Water (Kilolitre per Day) 13981.7
(c)Total Reused Water (Kilolitre per Day) 2680
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)125.3Tons10RoadOthersregistered refiners
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube86.26.20.0086.21100
(2.)PM2.5Microgram per Meter Cube46.20046.2160
(3.)NOxMicrogram per Meter Cube20.800.000120.80180
(4.)SO2Microgram per Meter Cube16.80016.8180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)No Proposed stack-00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 77400
(b)Source Wind Mills/Cogeneration Plants/ MGVCL.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 DG Set 562.5KVA
(e)Stack Height (in m) 0.25
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 328
    Total Land (ha.) 328
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.13577
(b)Waste/Barren Land (ha.) 0.003683
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0.000331
(e)Settlements (ha.) 0.005587
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Range Land 0.008444
    Total (ha.) 0.153815
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant174.7
(2.)Township34.6
(3.)Green belt118.7
Total (ha.) 328
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)CorridorsNA0NA
(3.)ESZsNA0NA
(4.)WLSNA0NA
(5.)ESAsNA0NA
(6.)Critically Polluted AreaP.C.C.INA0.75NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsAir Force Station at Harni8.25-
(2.)Forest-0-
(3.)Archaeological Sites-0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 328
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada Canal
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 15
(b)Permanent Employment-During Operation 5004
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 5019
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt118.70118.7
(2.)Percentage of Total Project Area36.1036.1
(3.)No. of Plants1790010179001
(4.)Funds Allocated000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe company will generate direct and indirect employment. Preference will be given to the local people for employment based on their educational qualifications and experience.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay Order
(ii)Name of the EIA Consultant Aqua-Air Environmental Engineers Pvt.Ltd.
(iii)Address 403,Center Point,Nr.Kadiwala School,Ring Road,Surat
(iv)Mobile No. 9925299077
(v)Landline No. 0261246085
(vi)Email Id aquaair_surat@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Jan 1900
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS J Parikh
DesignationSVP
Name of Company (Applicant Name should not be given here)GUJARAT STATE FERTILIZERS AND CHEMICALS LTD
AddressP.O. Fertilizernagar, Tal & District: Vadodara
Print