Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Motel Complex
(b)Name of the Company / Organisation TRICOLOR HOTELS LIMITED
(c)Registered Address H-65, Cannaught Circus, New Delhi,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajeev Trehan
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address H-65, Connaught Circus, New Delhi,,Connaught Place,New Delhi,Delhi-110057
(d)Pin code 110057
(e)E-mail tricolorhotelsltd@gmail.com
(f)STD Code. 11(f)Telephone No. 43034400
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/113104/2019
(d)Master Proposal Number(Single Window) SW/113102/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No. 23//7 Min(1-4), 23//8/2/1 Min (06), 23/
(b)Pincode 110037
(c)Bounded Latitudes (North)
From
Degree 3157560.18
Minutes
Second
From
Degree 3157747.34
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 705895.39
Minutes
Second
From
Degree 706120.50
Minutes
Second
(e)Survey of India Topo Sheet No. H43X2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 241
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.32
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per EIA Notification 2006 and its amendment, al
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)No. of towers1
(2.)no. of motel rooms117
(3.)No. of floorsG+8
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total built up area86116.5Otherssquare metersOthersNA
(2.)total plot area24238.01Otherssquare metersOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Jul 2019
(iv)Valid Upto 25 Jul 2019
(v)File No. -
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 160
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.02
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.40
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.93
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)0000OthersNA0OthersNA0 OthersMOUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 11 Jun 2019 To 19 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Mili Gram per Meter Cube145.1132.7144.1100
(2.)SO2Mili Gram per Meter Cube8.67.27.680
(3.)NOxMili Gram per Meter Cube41.232.340.180
(4.)PM2.5Mili Gram per Meter Cube92.682.791.660
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0011
(2.)TDSmg/l474474500500
(3.)Chloridesmg/l8080250250
(4.)Fluoridemg/l0.060.0611
(5.)pHNA7.47.48.58.5
(6.)Total Hardnessmg/l212212200200
(7.)Heavy Metalsleadmg/l0.010.010.010.01
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.97.6E
(2.)DOmg/l4.43.8E
(3.)BODmg/l26.824E
(4.)CODmg/l9680E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))48.948.955
(2.)Leq(Day)A-weighted decibels(dB(A))57.457.465
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram9.89.8
(2.)K(Potassium)Milligram per Kilogram29.829.8
(3.)pH7.367.36
(4.)N(Nitrogen)Milligram per Kilogram59.859.8
(5.)Electric ConductivityMillisiemens per Centimetre241.6241.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Supply1350.1Copy of Permission LetterPipelineOtherspipeline-30 Jul 2019135
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)laundry1825ETPReuse within the Plant & Recycling,Otherslosses of 2 KLD018
(2.)Domestic, flushing, cooling,miscellaneous174250STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersLosses of 27 KLD1740
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 192
(b)Total Discharged Water (Kilolitre per Day) 18
(c)Total Reused Water (Kilolitre per Day) 174
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bio degradable wasteMunicipal Solid Waste156Tons0RoadOthersorganic waste converter
(2.)Plastic wastePlastic Waste52Tons0.9RoadAuthorized Recyclers
(3.)Recyclable wasteMunicipal Solid Waste52Tons0.9RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube41.20.93.725080
(2.)PM10Microgram per Meter Cube145.10.92.22147.4100
(3.)PM2.5Microgram per Meter Cube92.60.91.1293.860
(4.)SO2Microgram per Meter Cube8.60.90.459.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3x1010 kVADiesel47.80.40SO20.15
(2.)2x500 kVADiesel46.30.3SO20.09
(3.)3x1010 kVADiesel47.80.40PM100.042
(4.)2x500 kVADiesel46.30.3PM100.025
(5.)3x1010 kVADiesel47.80.40NOx0.258
(6.)2x500 kVADiesel46.30.3NOx0.328
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5850
(b)Source BSES
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3x1010 kVA and 2x500 KVA
(e)Stack Height (in m) 47.8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 2.42380
    Total Land (ha.) 2.42380
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : plot area 2.42380
    Total (ha.) 2.4238
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Otherstotal plot area2.42380
Total (ha.) 2.4238
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSAsola Wildlife Sanctuary10.73SE direction from project site
(2.)NPANone0NA
(3.)ESAsNone0NA
(4.)ESZsAsola Wildlife Sanctuary9.82SE direction from project site
(5.)Wildlife CorridorsNone0NA
(6.)CorridorsNone0NA
(7.)Critically Polluted AreaNariana Industrial Area11.57NNE direction from project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestAsola Wildlife Sanctuary10.73SE direction from project site
(2.)Archaeological SitesTomb of Sultan Ghari3.04NEE direction from project site
(3.)Defence InstallationsArjangarh Air Force Station5.66SSE direction from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.423801
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ghitorni Lake
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 5.06
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 185
(e)No. of working days 365
(f)Total Manpower 335
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.852218
(b)Percentage of Total Project Area 35.16
(c)No. of Plants to be Planted 310
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialrevenue will be generated
(2.)Environmental8522.18 (35.16% of plot area) will be developed as green area
(3.)Socialemployment will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 41.8
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 24238.01
(e)Total built up area (sqm) 86116.5
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 6
(d)Capacity 583
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1364
5.
Energy Saving Measures:
(a)Source/Mode Solar & LED
(b)Percentage 1
(c)Quantity 58.5
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area there will be no extraction of ground water.
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 78, 10th July, Serial No. 112
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th floor, NN Mall, Mangalam Palace, Sector-3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per the information provided by you, the proposal is for Motel Complex by M/s Tricolors Hotels Limited. However, the consent to Establish order submitted has been issued in the name of M/s Orana Hotel and Motel (A unit of Friendshiptime.com Pvt. Ltd.) Kindly clarify the same. Also submit the copy of Consent to operate for the existing Motel. Kindly submit/upload a certified report on the sources and availability of water from the local body supplying water along with the permission received by them for the existing Motel and proposed one. 09 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeev Trehan
DesignationDirector
Name of Company (Applicant Name should not be given here)TRICOLOR HOTELS LIMITED
AddressH-65, Cannaught Circus, New Delhi
Print