1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of Clinkerization Plant (4.0 to 8.0 MTPA) along with Captive Power Plant (55 to 160 MW) at Village Vayor, Taluka - Abdasa, District - Kutch (Gujarat) by M/s. UltraTech Cement Limite | (b)Name of the Company / Organisation | M/s. UltraTech Cement Ltd. | (c)Registered Address | Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093 ,Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,Mumbai City,Maharashtra-400093 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr. K.V. Reddy Reddy | (b)Designation (Owner/ Partner/ CEO) | Joint President & Corporate Head | (c)Address | Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,,kalaburagi,Karnataka-400093 | (d)Pin code | 400093 | (e)E-mail | kvijender.reddy@adityabirla.com | (f)STD Code. | 22(f)Telephone No. | 66917400 | (g)Fax No. | 28244970 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND/113014/2015 | (d)Master Proposal Number(Single Window) | SW/112996/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra list is enclosed with PFR. | (b)Pincode | 370511 | (c)Bounded Latitudes (North) | | From | | Degree | 232438.80 | Minutes | | Second | | From | | Degree | 232715.83 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 684051.38 | Minutes | | Second | | From | | Degree | 684345.91 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41A/10 & 41 A/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 105 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 30 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/398/2007-IA.II(I) | (c)Date of Issue of TOR | 05 Aug 2015 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 02 Aug 2019 | (c)Date of Issue of EC | 03 Dec 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Sewagram Cement Works colony, Opp. M/s UltraTech Cement Ltd. (Koteshwar Gate) | State : | Gujarat | District : | kutch | Tehsil : | Abdasa | Village : | Vayor |
| 75 | Issues related to Employment, Environment & Pollution, Plantation, CSR activities, etc. were raised | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-194/2008(ENV)/271 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 22 2016 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Clinker | 4.0 | 4.0 | 8 | Others | MTPA | Road | | (2.) | Cement | 7.2 | 0 | 7.2 | Others | MTPA | Road | | (3.) | CPP | 55 | 105 | 160 | Mega Watt(MW) | | Road | | (4.) | Desalination Plant | 6700 | 0 | 6700 | Kilo Litre per Day(KLD) | | Others | NA | (5.) | D.G. Set | 20 | 0 | 20 | Mega Watt(MW) | | Others | NA | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Kiln | 2 x 5500 TPD | 12000 TPD | 2 x 5500 TPD and 1 x 12000 TPD | | (2.) | Limestone Reclaimer | 2 x 550 TPH | 2 x 550 TPH | 4 x 550 TPH | | (3.) | CPP Boiler | 170 TPH & 110 TPH | 2 x 170 TPH | 110 TPH & 3 x 170 TPH | | (4.) | Limestone Stacker | 2000 TPH | 2000 TPH | 2 x 2000 TPH | | (5.) | Coal Stacker | 2 x 300 TPH | 2 x 300 TPH | 4 x 300 TPH | | (6.) | Additives Stacker | 300 TPH | 300 TPH | 600 TPH | | (7.) | Additives Reclaimer | 200 TPH | 200 TPH | 2 x 200 TPH | | (8.) | Raw Mill (VRM) | 400 & 450 TPH | 2 x 450 TPH | 400 TPH & 3 X 450 TPH | | (9.) | Coal and Pet coke Mill | 2 x 62 TPH | 2 x 62 TPH | 4 x 62 TPH | | (10.) | CPP Turbine | 30 MW & 25 MW | 2 x 35 MW | 30 MW 25 MW & 2 x 35 MW | | (11.) | Packer | 4 x 12 spouts double discharge type each | 4 x 12 spouts double discharge type each | 8 x 12 spouts double discharge type each | | (12.) | Coal Reclaimer | 2 x 200 TPH | 2 x 200 TPH | 4 x 200 TPH | | (13.) | Coal and Pet coke Mill | 2 x 62 TPH | 2 x 62 TPH | 4 x 62 TPH | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 25 Dec 2018 | (iv)Valid Upto | 12 Dec 2023 | (v)File No. | AWH - 98120 | (vi)Application No. | 147345 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3500 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 150 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 12.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 15 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 8.32 | (b)Existing quantity of raw material/fuel | 8.27 | (c)Total quantity of raw material/fuel | 16.59 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 2.17 | Others | MTPA | SA Coal- Adani Port | Road | | 175 | Others | PO | Copy of Linkage | (2.) | LATERITE | 0.54 | Others | MTPA | Captive Baranda Laterite Mine | Road | | 12 | Captive | | Copy of Linkage | (3.) | Clay | 1.08 | Others | MTPA | Captive Clay Mine & Ashapura China Clay Mine | Road | | 140 | Captive | | Copy of Linkage | (4.) | Limestone | 12.8 | Others | MTPA | Captive Limestone Mine | Road | | 8 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 12.3 | 6.1 | 12.16 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 89.8 | 56.9 | 88.68 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 24.4 | 13.9 | 23.96 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 46.5 | 27.3 | 46.19 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 1581 | 102 | 200 | 600 | (2.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (3.) | Heavy Metals | | All Heavy Metals | NA | | 0 | 0 | 0 | 0 | (4.) | pH | | | NA | | 8.39 | 7.25 | 6.5 | 8.5 | (5.) | TDS | | | mg/l | | 4886 | 932 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 2275.58 | 201.86 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 1.76 | 0.78 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | NA | | 0 | 0 | E | (2.) | pH | | NA | | 0 | 0 | E | (3.) | DO | | NA | | 0 | 0 | E | (4.) | BOD | | NA | | 0 | 0 | E | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.3 | 41.5 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 60.1 | 51.9 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 46.20 | 28.47 | (2.) | K(Potassium) | Kilogram per hectare | | 410.20 | 145.02 | (3.) | pH | | | 8.12 | 7.78 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.38 | 0.26 | (5.) | N(Nitrogen) | Kilogram per hectare | | 203.78 | 136.10 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.13 To 35.7 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.83 To 37.7 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 6340 | 16 | Not Appliacble | Pipeline | | Others | Pumping | J-11011/398/2009-lA.ll (l) | 15 Apr 2011 | 6340 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 6700 | (c)Quantity of Brine (KLD) | 0 | (d)Mode of Disposal of Brine | 0 | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Boiler Blow Down | 180 | 300 | Neutralization Pit | Others | Dust suppression | 180 | 0 | (2.) | Domestic Waste Water | 795 | 1500 | Sewage Treatment Plant | Others | Used greenbelt development/ plantation | 795 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 975 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 975 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Fly ash | Fly Ash | Domestic Waste Sludge | 344373 | Tons | 0 | Pipe Conveyor | | Others | Utilization in cement manufacturing process. | (2.) | Used Oil | Industrial Waste | | 800 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 11.9 | 923.88 | 4.91 | 16.82 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 86.4 | 923.88 | 1.98 | 88.58 | 100 | (3.) | NOx | | Microgram per Meter Cube | 24.4 | 923.88 | 6.45 | 30.85 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 45.4 | 0 | 0 | 45.5 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Raw Mill / Kiln | Coal / Lignite / Imported Coal / Petcoke | 115 | 5.5 | SO2 | | 101.65 Kg/hr | (2.) | Raw Mill / Kiln | Coal Lignite / Imported Coal / Petcoke | 115 | 5.5 | NOx | | 339.47 kg/hr | (3.) | Coal Mill | NA | 78 | 2.5 | PM10 | | 6.92 kg/hr | (4.) | CPP Boiler - 1 | Coal / Lignite / Imported Coal | 92 | 1.9 | NOx | | 49.06 kg/hr | (5.) | CPP Boiler - 1 | Coal / Lignite / Imported Coal | 92 | 1.9 | PM10 | | 8.18 kg/hr | (6.) | Raw Mill / Kiln | Coal / Lignite / Imported Coal / Petcoke | 115 | 5.5 | PM10 | | 16.97 Kg / hr | (7.) | Clinker Cooler | NA | 52 | 4.25 | PM10 | | 4.99 kg/hr | (8.) | CPP Boiler - 1 | Coal / Lignite / Imported Coal | 92 | 1.9 | SO2 | | 98.11 kg/hr | (9.) | Alkali Bypass | NA | 55 | 3.35 | PM10 | | 3.09 kg/hr | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 125000 | (b)Source | Captive Power Plant, & D.G. Set (for back-up) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 20 KW | (e)Stack Height (in m) | 55 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 699.85 | Total Land (ha.) | 699.85 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 699.85 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : No other area | 0 | Total (ha.) | 699.85 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 208.15 | | (2.) | Green belt | | 232 | | (3.) | Township | | 97.85 | | (4.) | Others | Open area | 161.85 | Open area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not applicable | 0 | No Critically Polluted Area within 10 km radius | (2.) | NPA | Not applicable | 0 | No NPA within 10 km radius | (3.) | ESAs | Not applicable | 0 | No ESA within 10 km radius | (4.) | Corridors | Not applicable | 0 | No Corridor within 10 km radius | (5.) | Wildlife Corridors | Not applicable | 0 | No wildlife corridor within 10 km radius | (6.) | ESZs | Eco - Sensitive Zone of Narayan Wildlife Sanctuary | 9.1 | Eco - Sensitive Zone of Narayan Wildlife Sanctuary falls at a distance of 9.1 km from plant boundary | (7.) | WLS | Not applicable | 0 | No WLS within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not applicable | 0 | No Defense Installation within 10 km radius | (2.) | Forest | | Harudi Reserve Forest | 1.6 | In NW direction from plant site | (3.) | Archaeological Sites | | Not applicable | 0 | No Archaeological Site within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 699.85 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Monitor lizard (Varanus bengalensis) and Indian Peafowl (Pavocristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 35 Lacs | (iii)Period of Implementation | 10 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Khari River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 275 | (c)Temporary Employment- During Construction | 2000 | (d)Temporary Employment- During Operation | 516 | (e)No. of working days | 340 | (f)Total Manpower | 2891 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 120.30 | 111.70 | 232 | (2.) | Percentage of Total Project Area | 17.21 | 15.97 | 33.18 | (3.) | No. of Plants | 80670 | 143000 | 223670 | (4.) | Funds Allocated | 1000000 | 5000000 | 6000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenery of the area will be increased | (2.) | Social | Employment generation and upliftment of the nearby villagers through CER | (3.) | Financial | Revenue generation for State and Centre in terms of taxes etc. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J.M. EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana) | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 07 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting ADS reply for your consideration. | 01 Nov 2021 | 2. | ADS Raise Letter | As per the Ec accorded on 1/08/2008, the capacity of the desalination plant is mentioned as 4500 KLD (copy enclosed). Whereas under the proposed expansion the existing capacity of the Desalination is reported as 6700 KLD. Kindly furnish the copy of the CRZ clearance obtained for 6700 KLD desalination plant.In addition, copy of the latest six monthly compliance report of the CRZ clearance (or) monitoring report of RO on CRZ clearance shall also be submitted as the proposal involves increased material handling through the jetty, rejects discharge into the sea. | 01 Nov 2021 | 3. | ADS Reply Letter | NA | 28 Oct 2021 | 4. | NA | Proposal deferred for want of additional information. | 28 Aug 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr. K.V. Reddy Reddy | Designation | Joint President & Corporate Head | Name of Company (Applicant Name should not be given here) | M/s. UltraTech Cement Ltd. | Address | Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093 |
|