Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion of Clinkerization Plant (4.0 to 8.0 MTPA) along with Captive Power Plant (55 to 160 MW) at Village Vayor, Taluka - Abdasa, District - Kutch (Gujarat) by M/s. UltraTech Cement Limite
(b)Name of the Company / Organisation M/s. UltraTech Cement Ltd.
(c)Registered Address Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093 ,Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,Mumbai City,Maharashtra-400093
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr. K.V. Reddy Reddy
(b)Designation (Owner/ Partner/ CEO) Joint President & Corporate Head
(c)Address Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,,kalaburagi,Karnataka-400093
(d)Pin code 400093
(e)E-mail kvijender.reddy@adityabirla.com
(f)STD Code. 22(f)Telephone No. 66917400
(g)Fax No. 28244970
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND/113014/2015
(d)Master Proposal Number(Single Window) SW/112996/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra list is enclosed with PFR.
(b)Pincode 370511
(c)Bounded Latitudes (North)
From
Degree 232438.80
Minutes
Second
From
Degree 232715.83
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 684051.38
Minutes
Second
From
Degree 684345.91
Minutes
Second
(e)Survey of India Topo Sheet No. 41A/10 & 41 A/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 105
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/398/2007-IA.II(I)
(c)Date of Issue of TOR 05 Aug 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 02 Aug 2019
(c)Date of Issue of EC 03 Dec 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Sewagram Cement Works colony, Opp. M/s UltraTech Cement Ltd. (Koteshwar Gate)
State :Gujarat
District :kutch
Tehsil :Abdasa
Village :Vayor
75Issues related to Employment, Environment & Pollution, Plantation, CSR activities, etc. were raisedOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-194/2008(ENV)/271
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 22 2016 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Clinker4.04.08OthersMTPARoad
(2.)Cement7.207.2OthersMTPARoad
(3.)CPP55105160Mega Watt(MW)Road
(4.)Desalination Plant670006700Kilo Litre per Day(KLD)OthersNA
(5.)D.G. Set20020Mega Watt(MW)OthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Kiln2 x 5500 TPD12000 TPD2 x 5500 TPD and 1 x 12000 TPD
(2.)Limestone Reclaimer2 x 550 TPH2 x 550 TPH4 x 550 TPH
(3.)CPP Boiler170 TPH & 110 TPH2 x 170 TPH110 TPH & 3 x 170 TPH
(4.)Limestone Stacker2000 TPH2000 TPH2 x 2000 TPH
(5.)Coal Stacker2 x 300 TPH2 x 300 TPH4 x 300 TPH
(6.)Additives Stacker300 TPH300 TPH600 TPH
(7.)Additives Reclaimer200 TPH200 TPH2 x 200 TPH
(8.)Raw Mill (VRM)400 & 450 TPH2 x 450 TPH400 TPH & 3 X 450 TPH
(9.)Coal and Pet coke Mill2 x 62 TPH2 x 62 TPH4 x 62 TPH
(10.)CPP Turbine30 MW & 25 MW2 x 35 MW30 MW 25 MW & 2 x 35 MW
(11.)Packer4 x 12 spouts double discharge type each4 x 12 spouts double discharge type each8 x 12 spouts double discharge type each
(12.)Coal Reclaimer2 x 200 TPH2 x 200 TPH4 x 200 TPH
(13.)Coal and Pet coke Mill2 x 62 TPH2 x 62 TPH4 x 62 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Dec 2018
(iv)Valid Upto 12 Dec 2023
(v)File No. AWH - 98120
(vi)Application No. 147345
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 150
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 12.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8.32
(b)Existing quantity of raw material/fuel 8.27
(c)Total quantity of raw material/fuel 16.59
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal2.17OthersMTPASA Coal- Adani PortRoad175 OthersPOCopy of Linkage
(2.)LATERITE0.54OthersMTPACaptive Baranda Laterite MineRoad12 CaptiveCopy of Linkage
(3.)Clay1.08OthersMTPACaptive Clay Mine & Ashapura China Clay MineRoad140 CaptiveCopy of Linkage
(4.)Limestone12.8OthersMTPACaptive Limestone MineRoad8 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube12.36.112.1680
(2.)PM10Micro Gram per Meter Cube89.856.988.68100
(3.)NOxMicro Gram per Meter Cube24.413.923.9680
(4.)PM2.5Micro Gram per Meter Cube46.527.346.1960
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l1581102200600
(2.)TSSNA0000
(3.)Heavy MetalsAll Heavy MetalsNA0000
(4.)pHNA8.397.256.58.5
(5.)TDSmg/l48869325002000
(6.)Chloridesmg/l2275.58201.862501000
(7.)Fluoridemg/l1.760.7811.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODNA00E
(2.)pHNA00E
(3.)DONA00E
(4.)BODNA00E
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.341.570
(2.)Leq(Day)A-weighted decibels(dB(A))60.151.975
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare46.2028.47
(2.)K(Potassium)Kilogram per hectare410.20145.02
(3.)pH8.127.78
(4.)Electric ConductivityMillisiemens per Centimetre0.380.26
(5.)N(Nitrogen)Kilogram per hectare203.78136.10
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.13 To 35.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.83 To 37.7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Sea634016 Not Appliacble PipelineOthersPumpingJ-11011/398/2009-lA.ll (l)15 Apr 20116340
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 6700
(c)Quantity of Brine (KLD) 0
(d)Mode of Disposal of Brine 0
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler Blow Down180300Neutralization PitOthersDust suppression1800
(2.)Domestic Waste Water7951500Sewage Treatment PlantOthersUsed greenbelt development/ plantation7950
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 975
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 975
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly ashFly AshDomestic Waste Sludge344373Tons0Pipe ConveyorOthersUtilization in cement manufacturing process.
(2.)Used OilIndustrial Waste800Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube11.9923.884.9116.8280
(2.)PM10Microgram per Meter Cube86.4923.881.9888.58100
(3.)NOxMicrogram per Meter Cube24.4923.886.4530.8580
(4.)PM2.5Microgram per Meter Cube45.40045.560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Raw Mill / KilnCoal / Lignite / Imported Coal / Petcoke1155.5SO2101.65 Kg/hr
(2.)Raw Mill / KilnCoal Lignite / Imported Coal / Petcoke1155.5NOx339.47 kg/hr
(3.)Coal MillNA782.5PM106.92 kg/hr
(4.)CPP Boiler - 1Coal / Lignite / Imported Coal921.9NOx49.06 kg/hr
(5.)CPP Boiler - 1Coal / Lignite / Imported Coal921.9PM108.18 kg/hr
(6.)Raw Mill / KilnCoal / Lignite / Imported Coal / Petcoke1155.5PM1016.97 Kg / hr
(7.)Clinker CoolerNA524.25PM104.99 kg/hr
(8.)CPP Boiler - 1Coal / Lignite / Imported Coal921.9SO298.11 kg/hr
(9.)Alkali BypassNA553.35PM103.09 kg/hr
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125000
(b)Source Captive Power Plant, & D.G. Set (for back-up)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 20 KW
(e)Stack Height (in m) 55
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 699.85
    Total Land (ha.) 699.85
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 699.85
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : No other area 0
    Total (ha.) 699.85
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant208.15
(2.)Green belt232
(3.)Township97.85
(4.)OthersOpen area161.85Open area
Total (ha.) 699.85
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot applicable0No Critically Polluted Area within 10 km radius
(2.)NPANot applicable0No NPA within 10 km radius
(3.)ESAsNot applicable0No ESA within 10 km radius
(4.)CorridorsNot applicable0No Corridor within 10 km radius
(5.)Wildlife CorridorsNot applicable0No wildlife corridor within 10 km radius
(6.)ESZsEco - Sensitive Zone of Narayan Wildlife Sanctuary9.1Eco - Sensitive Zone of Narayan Wildlife Sanctuary falls at a distance of 9.1 km from plant boundary
(7.)WLSNot applicable0No WLS within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot applicable0No Defense Installation within 10 km radius
(2.)ForestHarudi Reserve Forest1.6In NW direction from plant site
(3.)Archaeological SitesNot applicable0No Archaeological Site within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 699.85
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Monitor lizard (Varanus bengalensis) and Indian Peafowl (Pavocristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 35 Lacs
(iii)Period of Implementation 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Khari River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 275
(c)Temporary Employment- During Construction 2000
(d)Temporary Employment- During Operation 516
(e)No. of working days 340
(f)Total Manpower 2891
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt120.30111.70232
(2.)Percentage of Total Project Area17.2115.9733.18
(3.)No. of Plants80670143000223670
(4.)Funds Allocated100000050000006000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)SocialEmployment generation and upliftment of the nearby villagers through CER
(3.)FinancialRevenue generation for State and Centre in terms of taxes etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are herewith submitting ADS reply for your consideration. 01 Nov 2021
2. ADS Raise LetterAs per the Ec accorded on 1/08/2008, the capacity of the desalination plant is mentioned as 4500 KLD (copy enclosed). Whereas under the proposed expansion the existing capacity of the Desalination is reported as 6700 KLD. Kindly furnish the copy of the CRZ clearance obtained for 6700 KLD desalination plant.In addition, copy of the latest six monthly compliance report of the CRZ clearance (or) monitoring report of RO on CRZ clearance shall also be submitted as the proposal involves increased material handling through the jetty, rejects discharge into the sea. 01 Nov 2021
3. ADS Reply LetterNA 28 Oct 2021
4.NA

Proposal deferred for want of additional information.

28 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr. K.V. Reddy Reddy
DesignationJoint President & Corporate Head
Name of Company (Applicant Name should not be given here)M/s. UltraTech Cement Ltd.
AddressAhura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093
Print