Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Integrated MSW Management Project for Deoghar Nagar Nigam at Village- Pachiyari Kothiya, Plot No: 723, 723/752, 701, 702, 720, Rakba: 23.56 Acre, Thana Number 242, Khata No. - 58 at Deoghar (Jharkhand
(b)Name of the Company / Organisation DEOGHAR NAGAR NIGAM
(c)Registered Address Deoghar Nagar Nigam, Court Road Deoghar Jharkhand,,Deoghar,Jharkhand-814112
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjay Kumar Singh
(b)Designation (Owner/ Partner/ CEO) Commissioner
(c)Address Deoghar Nagar Nigam, Court Road Deoghar Jharkhand,,Deoghar,Deoghar,Jharkhand-814112
(d)Pin code 814112
(e)E-mail deogharmsw2018@gmail.com
(f)STD Code. 643(f)Telephone No. 2232786
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/MIS/78087/2018
(d)Master Proposal Number(Single Window) SW/112972/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No: 723, 723/752, 701, 702, 720, Thana Number
(b)Pincode 814112
(c)Bounded Latitudes (North)
From
Degree 24.540806
Minutes
Second
From
Degree 24.544242
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.696493
Minutes
Second
From
Degree 86.697849
Minutes
Second
(e)Survey of India Topo Sheet No. 72L/10,11,14,15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 245
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandDeogharDeoghar
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-70/2018-IA-III
(c)Date of Apply of TOR 06 Sep 2018
(d)Date of Issue of TOR / Standard ToR 15 Oct 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Apr 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Jharkhand
District :Deoghar
Tehsil :Deoghar
Village :Pachiyari Kothiya
421. Localise are not being equipped by any facilities. 2. Unemployment is the major issue amongst people. 3. Mosquitos problem is the major concern.OthersDistrict Administrator Deogarh
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)MSW plant is designed to process 200 TPDComposting, RDF, landfill facility
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Capacity of Aerobic Compost Plant-90TPD, Capacity of RDF Processing Plant– 110 TPD200OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 37.21
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.28
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.744
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.19
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 73000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 73000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Municipal Solid Waste73000Tons per AnnumWaste generation from Deoghar districtRoad5 OthersConcession AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube53.2327.1352.3260
(2.)OthersCOMili Gram per Meter Cube1.060.231.064
(3.)PM10Micro Gram per Meter Cube77.048.6275.71100
(4.)SO2Micro Gram per Meter Cube11.005.0010.9680
(5.)NOxMicro Gram per Meter Cube31.5214.1431.1180
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l9764625002000
(2.)Chloridesmg/l149422501000
(3.)Othersnitratesmg/l40.287.64545
(4.)TSSmg/l0000
(5.)pHNA7.76.956.58.5
(6.)Total Hardnessmg/l398188200600
(7.)Heavy Metalszincmg/l0.240.14515
(8.)Fluoridemg/l1.20.811.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTDSmg/l408182A
(2.)pHNA8.17.3A
(3.)CODmg/l16.58.3C
(4.)DOmg/l5.95.1A
(5.)BODmg/l3.32.4B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.547.775
(2.)Leq(Night)A-weighted decibels(dB(A))39.235.370
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.925.77
(2.)N(Nitrogen)Kilogram per hectare720225
(3.)P(Phosphorus)Kilogram per hectare4522.5
(4.)K(Potassium)Kilogram per hectare915.8854.65
(5.)Electric ConductivityOthersµS/cm112.455.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13 To 6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPHED18.55 Not Appliacble modeOtherswater tankers & pipelineOthersPHED water supply000031 Jul 201918.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, floor washing, process9.85ETPReuse within the Plant & Recycling9.8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 9.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal solid wasteMunicipal Solid Waste73000Tons0RoadOtherscomposting, RDF & landfill facility
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube0000.00001100
(2.)NOxMicrogram per Meter Cube0000.0010
(3.)Others(Specify)COMicrogram per Meter Cube0000.0010
(4.)PM2.5Microgram per Meter Cube0000.00010
(5.)PM10Microgram per Meter Cube0000.0001100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD302.5NOx0.0001
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 280
(b)Source JVVNL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 100
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 9.5
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9.5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8769.5
(b)Waste/Barren Land (ha.) 5985.90
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 4687.23
(e)Settlements (ha.) 3368.57
(f)Industrial (ha.) 0
(g)Forest (ha.) 3286.04
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : waste land 0
    Total (ha.) 26097.239999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.21
(2.)LandFill3.7
(3.)Area for Solid Waste Management1.35
(4.)OthersReserved for Septage management plant1.3
Total (ha.) 9.56
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)ESZsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)NPANA0NA
(5.)CorridorsNA0NA
(6.)WLSNA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)OthersNaNA0NA
(3.)ForestManikpur Open Mixed Jungle7.3NA
(4.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 9.53
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chhatimi Nadi
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 16
(d)Temporary Employment- During Operation 189
(e)No. of working days 300
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.20
(b)Percentage of Total Project Area 33.68
(c)No. of Plants to be Planted 3000
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe overall effect will improve buying power of employees and thus a higher standard of living viz. better education, improved health and sanitation facilities housing and acquisition of consumer durable. This is envisaged as a major positive benefit.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 00
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 00
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking NA
5.
Energy Saving Measures:
(a)Source/Mode Recover of energy through biological & thermal pro
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area During operational phase, there is a potential thr
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0080
(ii)Name of the EIA Consultant Wolkem India Limited
(iii)Address E-101, 102, Mewar Industrial Area, Madri Udaipur
(iv)Mobile No. 9772833835
(v)Landline No. 0294645206
(vi)Email Id om.shukla@wolkem.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 19 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of Additional Information for “Integrated Municipal Solid Waste Management Project for Deoghar Nagar Nigam” for Proposal No. (IA/JH/MIS/78087/2018; F. No. 10-70/2018-IA-III), 16 Mar 2020
2.NAThe proposal is of Category “A” while the environmental consultant is accredited for category “B”, accordingly EAC in its 44th meeting inter-alia asked to submit Accreditation Certificate of Environmental Consultant prepared EIA Report. However, it has not been uploaded along with ADS reply. Kindly submit the same. 13 Dec 2019
3. ADS Reply LetterSubmission of additional clarification reply to obtaining Environment clearance for proposed Integrated Solid Waste Management Facility Deoghar Nagar Nigam at Pachiyari Kothiya Village, Plot No: 723, 723/752, 701, 702, 720 , Rakba: 23.56 Acre, Thana number 242, Khata No 58, District-Deoghar, Jharkhand. 13 Dec 2019
4.NA

Kindly see the final minutes of 44th EAC meeting held during 23 to 25 September, 2019

04 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjay Kumar Singh
DesignationCommissioner
Name of Company (Applicant Name should not be given here)DEOGHAR NAGAR NIGAM
AddressDeoghar Nagar Nigam, Court Road Deoghar Jharkhand