Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in Manufacturing of Metallic Stearate (Wet Process), Metallic and Non Metallic Stearate (Dry Process) and Calcium Phosphate
(b)Name of the Company / Organisation HARIHAR ORGANICS PRIVATE LIMITED
(c)Registered Address 301, Sterling Estate, Inside Spectra Motor Compound, Ramchandra Lane Extension, Kachpada, Malad (West), Mumbai,,Mumbai City,Maharashtra-400064
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Minesh P Vora
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. C1-1901/19, 1901/20, Phase III, Notified Industrial Area, GIDC Vapi,,Umbergaon,Valsad,Gujarat-396195
(d)Pin code 396195
(e)E-mail minesh_vora@yahoo.co.in
(f)STD Code. 22(f)Telephone No. 28446405
(g)Fax No. 28812059
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/112470/2019
(d)Master Proposal Number(Single Window) SW/112460/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. C1-1901/19, 1901/20,
(b)Pincode 396195
(c)Bounded Latitudes (North)
From
Degree 20.3628
Minutes
Second
From
Degree 20.3632
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.9472
Minutes
Second
From
Degree 72.9475
Minutes
Second
(e)Survey of India Topo Sheet No. F43S15&11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 29
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratDevbhumi DwarkaKalyanpurMewasa
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/ToR/5(f)/968/2019
(b)Date of Apply of TOR 05 Feb 2019
(c)Date of Issue of TOR / Standard ToR 25 Jun 2019
(d)Date of Apply of EC 05 Feb 2019
(e)Date of Issue of EC 25 Jun 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Considering the products of the project, it is not
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. NA
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 20 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Calcium Phosphate (Dry Process)00100.0100OthersTPMRoad
(2.)Metallic Stearates91625OthersTPMRoad
(3.)Metallic and non-metallic stearates (Dry Process)00200.0200OthersTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Thermopak (k cal/h)003.03.0
(2.)Hot Air Generator (lakhs k cal/h)003.03.0
(3.)steam boiler (TPH)0.40000.40
(4.)Hot air Generator (lakh k cal/h)1.0001.0
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Dec 2018
(iv)Valid Upto 30 Sep 2023
(v)File No. AWH-97536
(vi)Application No. 146524
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.83
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.05
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0083
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 368.03
(b)Existing quantity of raw material/fuel 15.44
(c)Total quantity of raw material/fuel 383.46999999999997
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Metallic Salts16.10OthersMT/MLocal marketRoad10 LinkageCopy of Linkage
(2.)Calcium Hydroxide30OthersMT/MLocalRoad10 LinkageCopy of Linkage
(3.)Additives2.0OthersMT/MLocal marketRoad10 LinkageCopy of Linkage
(4.)Natural Gas275OthersSCM/hGSPCPipe Conveyor50 LinkageCopy of Linkage
(5.)Stearic Acid190.37OthersMT/MLocal marketRoad10 LinkageCopy of Linkage
(6.)Phosphoric Acid78OthersMT/MLocal marketRoad10 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube22.514.620.3580
(2.)SO2Micro Gram per Meter Cube17.78.51580
(3.)PM2.5Micro Gram per Meter Cube48.930.544.0860
(4.)PM10Micro Gram per Meter Cube86.159.881.2100
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l11585045002000
(2.)pHOtherspH unit7.367.1477
(3.)Total Hardnessmg/l566304200600
(4.)TSSmg/l1.9122
(5.)Fluoridemg/l0.70.51.01.5
(6.)Heavy MetalsZincmg/l0.180.10515
(7.)Chloridesmg/l3361162501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.14.9C
(2.)BODmg/l63.9C
(3.)CODmg/l186C
(4.)pHOtherspH Unit7.827.12A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))78.350.475
(2.)Leq(Night)A-weighted decibels(dB(A))70.341.870
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Othersmg/100 gm17.47.8
(2.)pHOtherspH unit7.887.58
(3.)N(Nitrogen)Othersmg/100 gm11.16.5
(4.)K(Potassium)Milliequivalents per 100 Gram1.61.3
(5.)Electric ConductivityOthersdS/m1.921.10
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply182Copy of Permission LetterPipelineOthersPipelineRef. 50031 Aug 201220
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic22Septic Tank/Soak PitOthersSeptic tank/Soak Pit02
(2.)Industrial1010ETPOthersCETP vapi010
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 12
(b)Total Discharged Water (Kilolitre per Day) 12
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons10RoadAuthorized Recyclers
(2.)ETP WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.240Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube17.600.01317.61480
(2.)NOxMicrogram per Meter Cube22.300.9223.2380
(3.)PM2.5Microgram per Meter Cube85.800.2486.05100
(4.)PM10Microgram per Meter Cube85.800.2486.05100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Hot Air GeneratorNatural Gas110.2NOx0.01
(2.)ThermopackNatural Gas110.4SO20.0002
(3.)ThermopackNatural Gas110.4NOx0.01
(4.)Hot Air GeneratorNatural Gas110.2SO20.0001
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 150
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) No Any
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0.1565
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.1565
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23837
(b)Waste/Barren Land (ha.) 247
(c)Grazing/ Community Land (ha.) 3370
(d)Surface Water Bodies (ha.) 1195
(e)Settlements (ha.) 4273
(f)Industrial (ha.) 1427
(g)Forest (ha.) 118
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scub and mining land 1294
    Total (ha.) 35761
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.0445
(2.)Green belt0.0375
(3.)Area for Solid Waste Management0.0008
(4.)Built Up Area0.0245
(5.)Quarry Area0.0182
(6.)OthersOpen Space0.031084
Total (ha.) 0.156584
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanone0None in 10 km radius
(2.)WLSNone0None in 10 km radius
(3.)ESZsNone0None in 10 km radius
(4.)Wildlife CorridorsNone0None in 10 km radius
(5.)CorridorsNone0None in 10 km radius
(6.)ESAsNone0None in 10 km radius
(7.)NPANone0None in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0None in 10 km radius
(2.)Archaeological SitesNone0None in 10 km radius
(3.)Defence InstallationsNone0None in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.1565
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired none
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damanganga river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5.10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3750375
(2.)Percentage of Total Project Area23.9023.9
(3.)No. of Plants1800180
(4.)Funds Allocated25000025000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financial• Growth in Export Revenue and thereby increasing the inflow of foreign currency which is much needed by our country.
(2.)EnvironmentalThe proponent has already developed 375 m2 of greenbelt, which will be maintained well after proposed expansion.
(3.)SocialAdditional 10 nos. of people will be employed after proposed expansion.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 085
(ii)Name of the EIA Consultant Eco Chem Sales and Services
(iii)Address Office Floor, Ashoka Pavillion – A, Opp. Kapadia Health Club, Surat – 395 001
(iv)Mobile No. 9825123805
(v)Landline No. 0261223622
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 20 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006, and requires appraisal/approval at State level. 27 Aug 2019
2.NAThe correction have been made as per the instruction received 27 Sep 2019
3.NAPlease refer EDS dated 27/8/2019 and submit the proposal accordingly. 03 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMinesh P Vora
DesignationDirector
Name of Company (Applicant Name should not be given here)HARIHAR ORGANICS PRIVATE LIMITED
Address301, Sterling Estate, Inside Spectra Motor Compound, Ramchandra Lane Extension, Kachpada, Malad (West), Mumbai
Print