Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) PROPOSED EXPANSION OF PAPER PRODUCTION WITH CAPACITY FROM 300 TPD TO 600 TPD ALONG WITH CPP OF 14.00 MW
(b)Name of the Company / Organisation SATIA INDUSTRIES LTD
(c)Registered Address Satia industries limited, Vill: Rupana, Dist: Muktsar,Punjab,Muktsar,Punjab-152032
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Satia
(b)Designation (Owner/ Partner/ CEO) M.B.B.S
(c)Address NIL
(d)Pin code 152026
(e)E-mail ajaysatia@gmail.com
(f)STD Code. 1633(f)Telephone No. 262215
(g)Fax No. 263499
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND/61921/2015
(d)Master Proposal Number(Single Window) SW/111819/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 26/1/1, 26/2/2, 13, 61/18, 23, 22, 19/1, 20, 21, 1
(b)Pincode 152026
(c)Bounded Latitudes (North)
From
Degree 30.419750
Minutes
Second
From
Degree 30.422992
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.519711
Minutes
Second
From
Degree 74.521989
Minutes
Second
(e)Survey of India Topo Sheet No. H43|6,H43|7,H43|10,H43|11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 31.4
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)PunjabShri Muktsar SahibShri Muktsar Sahib
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/196/2014-IA.II(I)
(c)Date of Issue of TOR 22 Jun 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 21 Jan 2017
(c)Date of Issue of EC 12 Feb 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0.01
The main gate of the industry located in the revenue estate of village rupana,District sri muktsar sahib
State :Punjab
District :Shri Muktsar Sahib
Tehsil :Shri Muktsar Sahib
Village :Rupana
229Issues regarding employment generation and water usageDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 5-309/2011-RO(NZ)/123-125
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 23 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Writting and Printing Paper300300600OthersTPDRoad
(2.)Co-generation Captive Power Plant301444Mega Watt(MW)OthersIn house use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Power Boiler50 TPH0050 TPHNone
(2.)Recovery Boiler25 TPH50 TPH75 TPHExisting will be modified
(3.)Recovery Boiler50 TPH0050 TPHNone
(4.)Power Boiler75 TPH0075 TPHNone
(5.)Recovery Boiler25 TPH0025 TPHNone
(6.)Power Boiler75 TPH0075 TPHNone
(7.)Power Boiler0075 TPH75 TPHNone
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 Jul 2018
(iv)Valid Upto 31 Mar 2023
(v)File No. CTOA/fresh/MKS/2018/7687794 & CTOW/fresh/MKS/2018/
(vi)Application No. 7687794 & 7687650
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 528.8
(b)Existing quantity of raw material/fuel 991.4
(c)Total quantity of raw material/fuel 1520.1999999999998
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Imp. Waste Paper35.300OthersTPDMarketRoad,OthersSea route100 LinkageCopy of Linkage
(2.)Paper Additives12OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(3.)Soap Stone118OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(4.)caustic182.800OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(5.)Chlorine Dioxide8OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(6.)Black Liquor700OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(7.)Lime127.400OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(8.)Imp. Wood Pulp32.600OthersTPDMarketRoad,OthersSea route100 LinkageCopy of Linkage
(9.)Oxy Bleach Booster4.40OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(10.)Wood Chips355.600OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(11.)Wheat Straw, Sarkanda, Bagasse638OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
(12.)Rice Husk900OthersTPDLocal marketRoad100 LinkageCopy of Linkage
(13.)Liquid Oxygen6.120OthersTPDLocal MarketRoad100 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube83.467.3682.97100
(2.)PM2.5Micro Gram per Meter Cube45.3134.8344.8560
(3.)SO2Micro Gram per Meter Cube15.6110.715.4180
(4.)NOxMicro Gram per Meter Cube19.9815.3219.9580
(5.)OthersCOMicro Gram per Meter Cube582.37498.75579.622000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH unit7.947.0477
(2.)TDSmg/l22542185002000
(3.)TSSmg/l0000
(4.)Chloridesmg/l875402501000
(5.)Total Hardnessmg/l1200112200600
(6.)Heavy MetalsZincmg/l0.20.12515
(7.)Fluoridemg/l0.70.411.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOtherspH Unit7.757.23E
(2.)DOmg/l5.14.9E
(3.)BODmg/l64E
(4.)CODmg/l1610E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.760.475
(2.)Leq(Night)A-weighted decibels(dB(A))63.655.470
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH Unit7.447.12
(2.)Electric ConductivityOthersdS/m0.480.35
(3.)P(Phosphorus)Othersmg/100g16.313.6
(4.)N(Nitrogen)Percent0.0740.052
(5.)K(Potassium)Milliequivalents per 100 Gram0.50.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.67 To 7.43
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.06 To 7.78
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface240005Copy of Permission LetterPipelineOthersPipe Line2018/Canals(7)1071207 Sep 201824000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic8787STPOthersPlantation0087
(2.)Industrial Effluent2141221500ETPOthersPlantation0021412
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 21499
(b)Total Discharged Water (Kilolitre per Day) 21499
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP Sludge (Quantity in TPD)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)17Tons20RoadOthersDisposed to local cardboard manufacturers.
(2.)Lime Sludge (Quantity in TPD)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)227.35Tons20RoadOthersCalcination in Cement Plants
(3.)Fly Ash (Quantity in TPD)Fly Ash115Tons20RoadOthersFor brick manufacturing & filling low lying areas
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.3001.0981.40100
(2.)SO2Microgram per Meter Cube14.5001.9116.4280
(3.)PM2.5Microgram per Meter Cube80.3001.0981.40100
(4.)NOxMicrogram per Meter Cube19.3000.4419.7580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Power BoilerRice husk652.8OthersPM10,SO2,NOXPM,SOX,NOX
(2.)Recovery BoilerBlack liquor652.8OthersPM10,SO2,NOXPM,SOX,NOX
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 44
(b)Source In house CPP of 44 MW
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) No D.G Set
(e)Stack Height (in m) 65
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 18.43
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 18.43
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23006
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1094
(e)Settlements (ha.) 4145
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Range Land 4836
    Total (ha.) 33081
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.6785
(2.)Green belt6.0832
(3.)OthersUtility and storage10.6724
Total (ha.) 18.4341
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANIL0NIL
(2.)ESAsNIL0NIL
(3.)CorridorsNIL0NIL
(4.)Wildlife CorridorsNIL0NIL
(5.)Critically Polluted AreaNIL0NIL
(6.)WLSNIL0NIL
(7.)ESZsNIL0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNIL0NIL
(2.)Defence InstallationsNIL0NIL
(3.)ForestNIL0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 18.4341
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arniwala Canal
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 190
(d)Temporary Employment- During Operation 10
(e)No. of working days 310
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt364532437960832
(2.)Percentage of Total Project Area25833
(3.)No. of Plants9113609415207
(4.)Funds Allocated5000005000001000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialeconomical growth
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 085
(ii)Name of the EIA Consultant Eco Chem Sales & Services
(iii)Address Office Floor,Ashoka Pavillion-A,Opp.Kapadia health Club,New Civil Road,Surat-395001
(iv)Mobile No. 9824156296
(v)Landline No. 0261223622
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 20 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease furnish certified compliance report which is not older than one year. 22 Jul 2019
2.NAThe correction have been made as per the instruction received 06 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Satia
DesignationM.B.B.S
Name of Company (Applicant Name should not be given here)SATIA INDUSTRIES LTD
AddressSatia industries limited, Vill: Rupana, Dist: Muktsar
Print